Forums
L2 Sign Up
SLS/Orion
SpaceX
Commercial
ISS
International
Other
Shop
Home
Help
Tags
Calendar
Login
Register
Forums
»
NASA Shuttle Specific Sections
»
Discovery (Post-STS-133, T&R)
»
LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
Print
Pages:
1
[
2
]
3
4
...
15
Next
Go Down
Author
Topic: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting (Read 60318 times)
shaula1247
Member
Full Member
Posts: 962
Liked: 5
Likes Given: 11
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #20 on:
06/05/2008 01:41 pm »
48 minutes remaining in EMU prebreathe
Logged
Selwyn
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 136950
Liked: 127265
Likes Given: 25348
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #21 on:
06/05/2008 01:42 pm »
Copy that Jim. There's a few on the back end of the FD5 thread, but I'm sure there will be plenty inbetween EVA-2 coverage on this one.
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
sts1canada
Senior Member
Posts: 2450
Liked: 1
Likes Given: 0
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #22 on:
06/05/2008 01:45 pm »
Hi everyone, this is a FYI for EVA comm coverage for EVA #2 from me today, due to changing work schedules out of my control, I won't be able to follow the EVA coverage here on NSF & provide comm coverage for this EVA until it is halfway completed
I will rejoin the coverage here when I can sometime during this EVA
Richard
Logged
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 136950
Liked: 127265
Likes Given: 25348
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #23 on:
06/05/2008 01:53 pm »
Looks like it'll be an early start to EVA-2.
"By 10am Central" (11am EDT/4pm UK).
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 136950
Liked: 127265
Likes Given: 25348
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #24 on:
06/05/2008 01:58 pm »
SAFER being installed on Fossum "The emergancy jet pack" <--Rob N.
«
Last Edit: 06/05/2008 01:59 pm by Chris Bergin
»
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
shaula1247
Member
Full Member
Posts: 962
Liked: 5
Likes Given: 11
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #25 on:
06/05/2008 02:00 pm »
Crewlock depress to begin in about 30 min. Itīs approaching the pumpkin hour here so thatīs it for me. I look forward to reading the coverage in the morning.
Logged
Selwyn
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 136950
Liked: 127265
Likes Given: 25348
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #26 on:
06/05/2008 02:03 pm »
Kibo with the airlock to the exposed facility.
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
StuffOfInterest
Full Member
Posts: 934
Just interested in space
McLean, Virginia, USA
Liked: 927
Likes Given: 233
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #27 on:
06/05/2008 02:03 pm »
Speaking of the CBM (from an earlier post), now that this hardware has been flying for 10 years, I'd love to see an analysis somewhere of what is good and bad in the design. With the real flight experience, it would be interesting to read about what the engineers would do differently if they were starting over again.
In addition to the large access path the CBM provides, I think one of the best features is the ablity to pass fluid and electrical lines between modules without interfering with the hatch operation. If you recall on the Mir station, to close a hatch you had to disconnect several lines. After the Progress collission, this would have been scary to try and handle these disconnects in a hurry.
Logged
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 136950
Liked: 127265
Likes Given: 25348
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #28 on:
06/05/2008 02:10 pm »
Ron's SAFER being installed. Mike already in the airlock.
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 136950
Liked: 127265
Likes Given: 25348
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #29 on:
06/05/2008 02:14 pm »
Ron's ready to go:
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 136950
Liked: 127265
Likes Given: 25348
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #30 on:
06/05/2008 02:18 pm »
Ron's boots
And a very large bag of equipment.
«
Last Edit: 06/05/2008 02:20 pm by Chris Bergin
»
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 136950
Liked: 127265
Likes Given: 25348
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #31 on:
06/05/2008 02:26 pm »
Ken's ready to assist EVA-2 on Discovery's flight deck (aft).
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 136950
Liked: 127265
Likes Given: 25348
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #32 on:
06/05/2008 02:28 pm »
Some inside joke between Ken and Nick Patrick?
"Most excellent Ken" - Nick.
«
Last Edit: 06/05/2008 02:34 pm by Chris Bergin
»
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 136950
Liked: 127265
Likes Given: 25348
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #33 on:
06/05/2008 02:31 pm »
Go for depress of Quest airlock. 30-40 minutes ahead of schedule. EVA-2 likely to begin at the top of the hour.
«
Last Edit: 06/05/2008 02:32 pm by Chris Bergin
»
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 136950
Liked: 127265
Likes Given: 25348
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #34 on:
06/05/2008 02:44 pm »
Leak check in progress. Getting a period of awful streaming, so standby for aiding coverage while I kick the router around the room a few times.
«
Last Edit: 06/05/2008 02:48 pm by Chris Bergin
»
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
eeergo
Phystronaut
Senior Member
Posts: 9897
Milan&Turin, Italy; Spain
Liked: 6735
Likes Given: 5484
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #35 on:
06/05/2008 02:55 pm »
Expecting the EVA to begin in 5 minutes.
Logged
-DaviD-
eeergo
Phystronaut
Senior Member
Posts: 9897
Milan&Turin, Italy; Spain
Liked: 6735
Likes Given: 5484
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #36 on:
06/05/2008 02:58 pm »
Activation of the second power channel in Kibo to provide control and current to the JEM-RMS, is meanwhile underway.
Logged
-DaviD-
Ronsmytheiii
Moderator
Global Moderator
Senior Member
Posts: 23394
Liked: 1880
Likes Given: 1045
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #37 on:
06/05/2008 03:00 pm »
Fossum camera is 16, Garren is 18
Logged
eeergo
Phystronaut
Senior Member
Posts: 9897
Milan&Turin, Italy; Spain
Liked: 6735
Likes Given: 5484
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #38 on:
06/05/2008 03:03 pm »
Thermal cover is open.
«
Last Edit: 06/05/2008 03:04 pm by eeergo
»
Logged
-DaviD-
eeergo
Phystronaut
Senior Member
Posts: 9897
Milan&Turin, Italy; Spain
Liked: 6735
Likes Given: 5484
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
«
Reply #39 on:
06/05/2008 03:04 pm »
And hatch is open, ready to start spacewalk.
Logged
-DaviD-
Print
Pages:
1
[
2
]
3
4
...
15
Next
Go Up
Tags:
Forums
»
NASA Shuttle Specific Sections
»
Discovery (Post-STS-133, T&R)
»
LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
Advertisement
Advertisement
Tweets by NASASpaceflight
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
0