Author Topic: LIVE: STS-124 Flight Day 5 - JEM-PM Activation/Ingress  (Read 63211 times)

Offline jmjawors

  • Old Skool Scratchin'
  • Full Member
  • ****
  • Posts: 900
  • Saint Louis
  • Liked: 9
  • Likes Given: 20
Re: LIVE: STS-124 Flight Day 5 - JEM-PM Activation/Ingress
« Reply #60 on: 06/04/2008 04:04 pm »
Rob Navias (PAO) confirms that the replacement pump appears to be working fine in the toilet.  The crew may begin using the toilet normally, but should continue to monitor it.
« Last Edit: 06/04/2008 04:04 pm by jmjawors »
.:: Matt ::.

Offline JimO

  • Veteran
  • Senior Member
  • *****
  • Posts: 2000
  • Texas, USA
  • Liked: 482
  • Likes Given: 195
Re: LIVE: STS-124 Flight Day 5 - JEM-PM Activation/Ingress
« Reply #61 on: 06/04/2008 04:05 pm »
Karen could turn your head 360 if she didn't like the look you were giving her.

My betting is she's gonna be the first woman on the moon. And while there, she'll drop-kick a Jacky Gleason doll halfway to the horizon.


Offline jmjawors

  • Old Skool Scratchin'
  • Full Member
  • ****
  • Posts: 900
  • Saint Louis
  • Liked: 9
  • Likes Given: 20
Re: LIVE: STS-124 Flight Day 5 - JEM-PM Activation/Ingress
« Reply #62 on: 06/04/2008 04:10 pm »
Meanwhile in Harmony...

Part one of the vestibule outfitting included removal of thermal covers and installation of data cables and power jumpers.  Also the installation of a low pressure nitrogen jumper for activation of the first power channel (channel B) which is coming up soon.
« Last Edit: 06/04/2008 04:10 pm by jmjawors »
.:: Matt ::.

Offline jmjawors

  • Old Skool Scratchin'
  • Full Member
  • ****
  • Posts: 900
  • Saint Louis
  • Liked: 9
  • Likes Given: 20
Re: LIVE: STS-124 Flight Day 5 - JEM-PM Activation/Ingress
« Reply #63 on: 06/04/2008 04:12 pm »
CDRA work ongoing...

In the background, preparations for tomorrow's EVA are continuing in Unity.
« Last Edit: 06/04/2008 04:14 pm by jmjawors »
.:: Matt ::.

Offline P_Rock

  • Member
  • Posts: 7
  • Liked: 0
  • Likes Given: 0
Re: LIVE: STS-124 Flight Day 5 - JEM-PM Activation/Ingress
« Reply #64 on: 06/04/2008 04:27 pm »
A flash from L2. NASA are checking into a recontact incident between Kibo and Discovery's payload bay during unberting. Will update when we know more.

There was quite a lot of side to side movement on the JPM when the payload berthing clamps opened yesterday. Don't recall ever seeing so much with other modules.

Offline jmjawors

  • Old Skool Scratchin'
  • Full Member
  • ****
  • Posts: 900
  • Saint Louis
  • Liked: 9
  • Likes Given: 20
Re: LIVE: STS-124 Flight Day 5 - JEM-PM Activation/Ingress
« Reply #65 on: 06/04/2008 04:38 pm »
All's quiet on-board.  Airlock activities are ongoing, CDRA activities I believe are winding down, if not over, toilet activities are completed, and vestibule outfitting is continuing.  Not a whole lot of comm traffic.
.:: Matt ::.

Offline jmjawors

  • Old Skool Scratchin'
  • Full Member
  • ****
  • Posts: 900
  • Saint Louis
  • Liked: 9
  • Likes Given: 20
Re: LIVE: STS-124 Flight Day 5 - JEM-PM Activation/Ingress
« Reply #66 on: 06/04/2008 04:58 pm »
Work continuing on the Kibo vestibule.  Work is ramping up for Channel B activation.
.:: Matt ::.

Offline Ronsmytheiii

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 23394
  • Liked: 1880
  • Likes Given: 1045
Re: LIVE: STS-124 Flight Day 5 - JEM-PM Activation/Ingress
« Reply #67 on: 06/04/2008 05:05 pm »
EMU work continuing:
« Last Edit: 06/04/2008 05:06 pm by Ronsmytheiii »

Offline Chris Bergin

Good work lads! Much appreciated.

Latest article (as usual, it's about four articles in one)
http://www.nasaspaceflight.com/content/?cid=5440
« Last Edit: 06/04/2008 05:12 pm by Chris Bergin »
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Ronsmytheiii

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 23394
  • Liked: 1880
  • Likes Given: 1045
Re: LIVE: STS-124 Flight Day 5 - JEM-PM Activation/Ingress
« Reply #69 on: 06/04/2008 05:08 pm »
Nyberg and Kelly working on vestibule:

Offline erioladastra

  • Full Member
  • ****
  • Posts: 1413
  • Liked: 222
  • Likes Given: 0
Re: LIVE: STS-124 Flight Day 5 - JEM-PM Activation/Ingress
« Reply #70 on: 06/04/2008 05:17 pm »
There was quite a lot of side to side movement on the JPM when the payload berthing clamps opened yesterday. Don't recall ever seeing so much with other modules.

Review doesn't look like any contact.    It may have been.  The arm has the ability to correct its position and its possible to try to compensate at the same time the arm is.

Offline erioladastra

  • Full Member
  • ****
  • Posts: 1413
  • Liked: 222
  • Likes Given: 0
Re: LIVE: STS-124 Flight Day 5 - JEM-PM Activation/Ingress
« Reply #71 on: 06/04/2008 05:22 pm »
I'd love to know what constitutes a Funny, what constitutes an IPR, and what constitutes an IFR. I know there was the question in L2 the other day but I wasn't really any the wiser. What kinds of "fault" log types are there? Maybe you could do a little write up?

Those are all KSC items.  MCC-H uses an Anomaly Report (AR) if something operationally occurs that was not expected or a procedureal error.  The Mission Evaluation Room (MER) can open an Item For Investigation (IFI) either on its own from a Anomaly Resolution Team (ART) invistigation, a Failure Investigation Team (FIT) or from an MOD AR.  The only funny we have is on the front page of the execute package.  :)

Offline Chris Bergin

Review doesn't look like any contact.    It may have been.  The arm has the ability to correct its position and its possible to try to compensate at the same time the arm is.

Thanks! Even if there was contact, we wouldn't be talking about the possibility of slight damage to either the guides or Kibo, at that rate of movement, would we?
« Last Edit: 06/04/2008 05:44 pm by Chris Bergin »
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Nice view of Discovery flight deck (aft).
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Garrett in Destiny checking out a camera for tomorrow's EVA-2:
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Heads up for the top of the hour, for a Mars Phoenix briefing, which will be available on the media channel (public channel will remain with ISS/124).

Options here:
http://www.nasa.gov/multimedia/nasatv/index.html
« Last Edit: 06/04/2008 05:54 pm by Chris Bergin »
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

In fact, you can have both going if you click the link above, select media channel and play it in the page's player, and click http://www.nasa.gov/55644main_NASATV_Windows.asx and have the ISS on an open player :)
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Hatch opening preparations almost complete.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Andy_Small

  • Space Geek
  • Full Member
  • ****
  • Posts: 491
  • Liked: 10
  • Likes Given: 13
Re: LIVE: STS-124 Flight Day 5 - JEM-PM Activation/Ingress
« Reply #78 on: 06/04/2008 06:17 pm »
Columbus has lost command.  Need to powerdown payload

*did not sound like a huge deal but who knows
« Last Edit: 06/04/2008 06:18 pm by Andy_Small »

Offline Chris Bergin

Good spot Andy, heard that too. Called for an available ISS crew member to carry out proceedure to powerdown its payload.
« Last Edit: 06/04/2008 06:20 pm by Chris Bergin »
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
1