Author Topic: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation  (Read 85472 times)

Offline jarthur

  • Member
  • Full Member
  • *
  • Posts: 117
  • Liked: 0
  • Likes Given: 0
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #240 on: 06/03/2008 07:35 pm »
Did anyone catch the details of this WETA get ahead? I know there is a camera group R&R planned for hte next 2 EVA's, but I think this is different no?

Offline sts1canada

  • Senior Member
  • *****
  • Posts: 2450
  • Liked: 1
  • Likes Given: 0
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #241 on: 06/03/2008 07:37 pm »
The camera views from the payload bay are showing the clearances of the trunnion pins as the JEM is about to be slowly moved out of the bay, 16 minutes to sunrise,
now in West coverage area, shuttle KU still through Z.

Richard

Offline sts1canada

  • Senior Member
  • *****
  • Posts: 2450
  • Liked: 1
  • Likes Given: 0
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #242 on: 06/03/2008 07:42 pm »
10 minutes to sunrise, the complex is passing southeast off the western coast of Australia.

The current camera view is from the RMS elbow cam that was harnessed until this EVA.

Richard



Offline Chris Bergin

Looks like someone's come to take a peek ;)
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline dsmillman

  • Member
  • Full Member
  • ****
  • Posts: 1483
  • Liked: 342
  • Likes Given: 27
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #244 on: 06/03/2008 07:44 pm »
Did anyone catch the details of this WETA get ahead? I know there is a camera group R&R planned for hte next 2 EVA's, but I think this is different no?

I believe that they are referring to a get ahead described on page FS 7-132 in the EVA checklist document.

Online eeergo

Getting close to the SARJ, here comes the grease :)

Thanks for the updates so far to all who have contributed, great to catch up in these very busy days for me.
-DaviD-

Online DaveS

  • Shuttle program observer
  • Senior Member
  • *****
  • Posts: 8548
  • Sweden
  • Liked: 1240
  • Likes Given: 65
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #246 on: 06/03/2008 07:46 pm »
Locks being removed.
If you're talking about the locks that hold the JPM to Discovery's PLB, they're called payload retention latches.
"For Sardines, space is no problem!"
-1996 Astronaut class slogan

"We're rolling in the wrong direction but for the right reasons"
-USA engineer about the rollback of Discovery prior to the STS-114 Return To Flight mission

Offline Chris Bergin

If you're talking about the locks that hold the JPM to Discovery's PLB, they're called payload retention latches.

I did, so thanks.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Nealy at the SARJ.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline maxx

  • Full Member
  • *
  • Posts: 179
  • Liked: 0
  • Likes Given: 0
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #249 on: 06/03/2008 07:54 pm »
complex about to pass over southern New Zealand and orbital sunrise

Offline Chris Bergin

Making a pass into daylight..
« Last Edit: 06/03/2008 07:57 pm by Chris Bergin »
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Safety proceedures being passed on for SARJ cover removal.
« Last Edit: 06/03/2008 08:01 pm by Chris Bergin »
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Ronsmytheiii

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 23394
  • Liked: 1880
  • Likes Given: 1045
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #252 on: 06/03/2008 08:02 pm »
How long till MBS un-grapple?
« Last Edit: 06/03/2008 08:03 pm by Ronsmytheiii »

Offline sts1canada

  • Senior Member
  • *****
  • Posts: 2450
  • Liked: 1
  • Likes Given: 0
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #253 on: 06/03/2008 08:03 pm »
Complex is passing over the South Pacific Ocean moving northeast, 30 minutes to East handover, 46 minutes to sunset, should have a great KU pass for this SARJ EVA tasks.

Richard

Offline Chris Bergin

Ron at the SARJ. Mike on his way to join him.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Nine turns to get the covers off.
« Last Edit: 06/03/2008 08:08 pm by Chris Bergin »
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline sts1canada

  • Senior Member
  • *****
  • Posts: 2450
  • Liked: 1
  • Likes Given: 0
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #256 on: 06/03/2008 08:05 pm »
How long till MBS un-grapple?

Probably in the next 20 - 25 minutes or so.


Online eeergo

I've noticed they've changed the way of calling the PGT settings: they said "counterclockwise" before (which was pretty inconvenient for repeating for too long) and now they say "anti".
-DaviD-

Offline sts1canada

  • Senior Member
  • *****
  • Posts: 2450
  • Liked: 1
  • Likes Given: 0
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #258 on: 06/03/2008 08:08 pm »
PET 3:45 coming up, EVA is not expected to surpass 6:30 PET due to Mike's METOX supplies.

Richard

Offline Ronsmytheiii

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 23394
  • Liked: 1880
  • Likes Given: 1045
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #259 on: 06/03/2008 08:11 pm »
Looks like the MBS ungrappple happened.

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
1