Author Topic: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation  (Read 85490 times)

Offline Chris Bergin

Flight Day 4 coverage of STS-124:

FD-4 Article: To follow shortly.

Planned Flight Day 4 activities:

(All times are eastern)

- EVA 1 preparations (7:12am)
- Canadarm2 grapple of Orbiter Boom Sensor System (OBSS) on S1
  truss (8:02am)
- EVA 1 by Fossum and Garan (11:32am):
 
  Duration: 6 hours, 30 minutes
   
    EVA operations:
    - Release the straps holding the shuttle robotic arm’s elbow joint
    camera down for launch (12:07pm)
    - Transfer the Orbiter Boom Sensor System from the station’s
    starboard truss to the shuttle (12:07pm)
    - Canadarm2 base change from Destiny to Harmony (2:47pm)
    - Prepare the Kibo laboratory for installation
    - Replace one of the 12 trundle bearing assemblies on the starboard
    solar alpha rotary joint (3:37pm)
    - Inspect damage to the solar alpha rotary joint (3:37pm)
    - RMS grapple of JEM-PM (4:17pm)
    - Test cleaning methods for use on the solar alpha rotary joint’s
    race ring (4:22pm)
    -JEM-PM unberth (4:37pm)

EVA 1 ends (6:02pm)

- Installation of JEM-PM on port side of Harmony (6:07pm)
- JEM-PM vestibule leak check (8:17pm)

Please note, this is interactive, but all posts need to be on topic. If you post images, no more than two per post.

Remember, lots of people use these threads as a catch up, so let's keep the chatter down, and keep it on updates only. This is going to be a long one!
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline geminy007

  • Member
  • Member
  • Posts: 49
  • Liked: 2
  • Likes Given: 3
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #1 on: 06/03/2008 10:47 am »
Crew awake. Wake Up was a japanese song (didn´t catch the title) for Hoshide. Airlock Crew preparing for Hatch opening @1058 GMT for hygene.

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6504
  • near hangar 18
  • Liked: 3812
  • Likes Given: 1272
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #2 on: 06/03/2008 10:56 am »
Thanks to all for allowing me to follow the flight while I'm deployed to Iraq. I'm hoping to get internet access in my room which may allow me to get audio--bandwidth is limited.  Looking forward to following the rest of the mission and watching the Hubble repair on the dish once I get home.
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Bejowawo

  • Member
  • Member
  • Posts: 89
  • Wels, Austria - NOT Australia
  • Liked: 0
  • Likes Given: 0
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #3 on: 06/03/2008 11:00 am »
Execute Package for FD4 is now available

http://www.nasa.gov/pdf/237031main_fd04_exec_pkg.pdf

Offline Ronsmytheiii

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 23394
  • Liked: 1880
  • Likes Given: 1045

Offline Chris Bergin

Thanks to all for allowing me to follow the flight while I'm deployed to Iraq. I'm hoping to get internet access in my room which may allow me to get audio--bandwidth is limited.  Looking forward to following the rest of the mission and watching the Hubble repair on the dish once I get home.

Check your PM (My Messages - top tab), I'll give you free L2. Stay safe.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

EMUs ready for action later today:
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Opening RPM (stunners) images on L2. Will use one of them in the upcoming article. Will include Pad 39A update, as we've got the investigation notes now.
« Last Edit: 06/03/2008 12:04 pm by Chris Bergin »
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Getting ready for the grapple of the OBSS.
« Last Edit: 06/03/2008 12:22 pm by Chris Bergin »
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline daj24

  • Member
  • Full Member
  • *
  • Posts: 169
  • Liked: 6
  • Likes Given: 14
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #9 on: 06/03/2008 12:29 pm »
Flight Day 4 NASA TV Schedule:
"You'll be a witness to that game of chance in the sky. You know we've got to win" D. Fagen

Offline Chris Bergin

It's all happening! Quest being prepped for the EVAers. Robotics for OBBS grapple:
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

11:30 EDT start time may be advanced for EVA-1, according to PAO Rob.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline KDelande

  • Member
  • Posts: 4
  • Liked: 0
  • Likes Given: 0
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #12 on: 06/03/2008 12:41 pm »
If I wanted to follow along with all of the steps the crew is taking for the EVA, which document should I be following?

KD

Offline Chris Bergin

If I wanted to follow along with all of the steps the crew is taking for the EVA, which document should I be following?

KD

There's an EVA FDF. Can someone link up the nasa.gov version (I can't find it off hand).
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

OBSS has been grappled. We had no images of the process.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline kneecaps

  • No Bucks, no Buck Rogers
  • Full Member
  • ****
  • Posts: 1622
  • Liked: 39
  • Likes Given: 17
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #15 on: 06/03/2008 01:01 pm »
There's an EVA FDF. Can someone link up the nasa.gov version (I can't find it off hand).

http://www.nasa.gov/centers/johnson/pdf/229503main_EVA_124_F_1.pdf
Allow subject to scream. In space no one will hear.

Offline Chris Bergin

Thanks Mr Caps :)
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline ckiki lwai

  • Aerospace engineering student
  • Full Member
  • ****
  • Posts: 826
  • Europe, Belgium
  • Liked: 4
  • Likes Given: 3
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #17 on: 06/03/2008 01:07 pm »
What are we looking at now? Some part of the truss?
Don't ever become a pessimist... a pessimist is correct oftener than an optimist, but an optimist has more fun, and neither can stop the march of events. - Robert Heinlein

Offline kneecaps

  • No Bucks, no Buck Rogers
  • Full Member
  • ****
  • Posts: 1622
  • Liked: 39
  • Likes Given: 17
Re: LIVE: STS-124 Flight Day 4 - EVA 1 / JEM-PM installation
« Reply #18 on: 06/03/2008 01:08 pm »
Thanks Mr Caps :)

No problem!

Followers will also want the PDRS CL. Procedures for the robotics and stuff.

http://www.nasa.gov/centers/johnson/pdf/229562main_PDRS_124_F_A.pdf
Allow subject to scream. In space no one will hear.

Offline Chris Bergin

What are we looking at now? Some part of the truss?

It wasn't noted, but I also thought it was the truss where the OBSS has been since 123, as it looks like the fixture.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0