Note about the OMS problems:Due to the L OMS TVC problem, NC2 will be cross fed left pod to R OME. Inaddition, the NC2 burn is being declared critical requiring a Dual G2 config with astringing of 1221 to protect R OMS ignition.
Current data for that burn is as follows:TIG MET 000/17:19:48.790 Total DV: 19.4 fps.