#40
by
Chris Bergin
on 07 Apr, 2008 13:36
-
-
#41
by
JayP
on 08 Apr, 2008 14:15
-
Wisi - 4/4/2008 6:19 PM
nathan.moeller - 31/3/2008 6:57 AM
JBK - The two can roll simultaneously if they need to.
I kinda wish this would happen - just for the photo opportunity this would give...
No, of course I don't! 
I recall seeing photos of 2 stacks outside the VAB in the night from back when they were having all of those H2 leaks back in the 90's. I think the OVs were Atlantis and Columbia
-
#42
by
Maverick
on 08 Apr, 2008 14:23
-
JayP - 8/4/2008 9:15 AM
Wisi - 4/4/2008 6:19 PM
nathan.moeller - 31/3/2008 6:57 AM
JBK - The two can roll simultaneously if they need to.
I kinda wish this would happen - just for the photo opportunity this would give...
No, of course I don't! 
I recall seeing photos of 2 stacks outside the VAB in the night from back when they were having all of those H2 leaks back in the 90's. I think the OVs were Atlantis and Columbia
There's a thread with images of that, a Shuttle traffic jam

Can't find it though.
-
#43
by
ChrisGebhardt
on 08 Apr, 2008 17:37
-
JayP - 8/4/2008 10:15 AM
Wisi - 4/4/2008 6:19 PM
nathan.moeller - 31/3/2008 6:57 AM
JBK - The two can roll simultaneously if they need to.
I kinda wish this would happen - just for the photo opportunity this would give...
No, of course I don't! 
I recall seeing photos of 2 stacks outside the VAB in the night from back when they were having all of those H2 leaks back in the 90's. I think the OVs were Atlantis and Columbia
I don't think this is processing but I've seen this conversation now in two different threads over the past few days. Here's a link to the picture in question. It is of Columbia and Atlantis.
http://www.gcs.k12.in.us/bholt/Columbia%20and%20Atlantis%20on%20CT%20in%201990%20smaller.jpgIn the future, try goolge image serach. I simply typed in "Columbia and Atlantis" and this was the first hit.
-
#44
by
Chris Bergin
on 11 Apr, 2008 22:18
-
-
#45
by
Chris Bergin
on 14 Apr, 2008 15:26
-
Boosters:
Buildup is complete. The booster will be transferred to the pallet on Tuesday. (Right Hand buildup first).
-
#46
by
ChrisGebhardt
on 14 Apr, 2008 17:38
-
Chris Bergin - 14/4/2008 11:26 AM
Boosters:
Buildup is complete. The booster will be transferred to the pallet on Tuesday. (Right Hand buildup first).
Excellent. Do we have a start stack date?
-
#47
by
Chris Bergin
on 15 Apr, 2008 00:21
-
On L2's Integrated Milestone Chart, it looks like May 12 for the start of the boosters taking shape on the MLP. The build up beat the schedule by a couple of days...
The 124 stack will be out at the pad by then, so makes sense. Very important too, as it's HB3's last ever Shuttle Stack..and will go to Ares I-X next. Of course, this is all delaying Ares I-X's current April, 09 target, which is no longer going to be the case soon (more like summer 09).
-
#48
by
Chris Bergin
on 15 Apr, 2008 21:20
-
-
#49
by
Chris Bergin
on 21 Apr, 2008 19:51
-
To give this flow a bit of an update outside of L2.
TPS waterproofing was completed on Sunday.
Fuel cell single cell volt test will be reperformed beginning later today.
Freon coolant loop #2 servicing was is scheduled to begin later today.
-
#50
by
Chris Bergin
on 23 Apr, 2008 06:26
-
-
#51
by
ShuttleDiscovery
on 23 Apr, 2008 18:45
-
-
#52
by
DaveS
on 09 May, 2008 18:08
-
LAB in the VAB transfer aisle. Now the assembly for this mission is underway:
-
#53
by
ChrisGebhardt
on 10 May, 2008 07:01
-
-
#54
by
DaveS
on 12 May, 2008 13:33
-
RAB now in the VAB fpr stacking:
-
#55
by
Ford Mustang
on 12 May, 2008 17:29
-
The crane is now being attached to the RAB, in preparations for movement over to the MLP.
-
#56
by
ChrisGebhardt
on 13 May, 2008 00:03
-
And if I'm not mistaken, the RAB segment has been/is being lowered onto the MLP
-
#57
by
DaveS
on 14 May, 2008 10:07
-
The LAC SRM segment now being lifted into High Bay 1 to be mated to the LAB already on the MLP. So it seems the order stacking is this:
1:LAB
2:RAB
3:LAC
4:RAC
5:LFC
6:RFC
7:LF
8:RF
9:L FWD Skirt Assy
10: R FWD Skirt Assy
-
#58
by
Ford Mustang
on 14 May, 2008 17:06
-
The LAC is now on the MLP:
-
#59
by
Chris Bergin
on 20 May, 2008 21:43
-