Looks like new hardware has arrived at the PHSF:
-
#242
by
DaveS
on 04 Aug, 2008 14:52
-
That must be the shipping container for the new FGS. The MULE is set to arrive this weel as well.
-
#243
by
Ronsmytheiii
on 04 Aug, 2008 14:57
-
That must be the shipping container for the new FGS. The MULE is set to arrive this weel as well.
then say hello to the new FGS:
Edit: Does anyone know when the Imax camera will arrive, or has it already?
-
#244
by
psloss
on 04 Aug, 2008 16:03
-
ET is mated to the SRBs. Article will follow.
In today's video file...
-
#245
by
Ronsmytheiii
on 04 Aug, 2008 16:40
-
-
#246
by
Ronsmytheiii
on 04 Aug, 2008 17:18
-
And here is a look at the disconnect valves:
-
#247
by
Austin
on 04 Aug, 2008 18:29
-
These shots are great...thanks!
-
#248
by
faustod
on 04 Aug, 2008 19:40
-
I agree. These are really great pictures.
What is the actual schedule for the Atlantis rollover to VAB?
-
#249
by
Ronsmytheiii
on 04 Aug, 2008 19:41
-
-
#250
by
DaveS
on 04 Aug, 2008 19:54
-
I agree. These are really great pictures.
What is the actual schedule for the Atlantis rollover to VAB?
August 18.
-
#251
by
Ronsmytheiii
on 04 Aug, 2008 20:21
-
-
#252
by
Ronsmytheiii
on 04 Aug, 2008 20:32
-
-
#253
by
Ronsmytheiii
on 04 Aug, 2008 20:34
-
Fine Guidance Sensor too:
-
#254
by
tblaxland
on 05 Aug, 2008 06:26
-
Edit: Does anyone know when the Imax camera will arrive, or has it already?
I think the IMAX camera is installed on the ORUC that arrived mid July.
-
#255
by
Chris Bergin
on 06 Aug, 2008 11:40
-
-
#256
by
Orbiter
on 06 Aug, 2008 12:23
-
So, October 5th is pretty much in the bag eh?
-
#257
by
psloss
on 06 Aug, 2008 12:30
-
So, October 5th is pretty much in the bag eh?
From the tank shipping point of view, it helps, but the tank schedule wasn't necessarily the only issue.
ET-129 still has to get all the way to the checkout cell in the VAB, which is dependent in large part on the cooperation of the weather. (For example, the barge has had to wait in Port Canaveral before.) Assuming there are no hangups, the program will have a good fix on STS-400 processing at KSC right around the time of the PRCB meeting on the 14th.
-
#258
by
psloss
on 06 Aug, 2008 15:30
-
The NASA-KSC
video feeds page switched to a different OTV camera in the VAB...this one in High Bay 3, showing ET/SRB work...
-
#259
by
Ronsmytheiii
on 06 Aug, 2008 15:39
-
back at the PHSF, more hardware is being uncovered: