#220
by
Chris Bergin
on 27 Jul, 2008 18:42
-
Hi. Long time reader, first time poster. Wanted to post to say your reports, Chris, on the Space Shuttle are great. Been a Shuttle fan since STS-1, and no other site comes close to this site for being able to follow the latest news.
Thanks very much
-
#221
by
Stowbridge
on 28 Jul, 2008 17:24
-
Did the Freon loops go back into place ok Chris? I assume so from the lack of a mention in your article?
-
#222
by
Chris Bergin
on 28 Jul, 2008 17:39
-
Did the Freon loops go back into place ok Chris? I assume so from the lack of a mention in your article?
Radiator Retract Hoses - yes, no problems reported. The main interest is usually in the vertical at the pad when the PLBDs are closed for flight.
-
#223
by
psloss
on 28 Jul, 2008 22:13
-
The NASA-KSC Media Gallery has some new pictures; included are a few of work to R&R the ET GH2 2'' disconnect:
http://mediaarchive.ksc.nasa.gov/search.cfm?cat=4Attached a sample of one of those; as usual, the full res pics are available from the above link.
NASA TV is also airing some footage in the current Video File.
-
#224
by
Stowbridge
on 29 Jul, 2008 15:03
-
Did the Freon loops go back into place ok Chris? I assume so from the lack of a mention in your article?
Radiator Retract Hoses - yes, no problems reported. The main interest is usually in the vertical at the pad when the PLBDs are closed for flight.
Very good.
-
#225
by
Chris Bergin
on 30 Jul, 2008 11:53
-
GN2 2 inch disconnect valve repaired

Now on to the Helium Inject Line R&R
-
#226
by
Chris Bergin
on 31 Jul, 2008 02:10
-
-
#227
by
Chris Bergin
on 31 Jul, 2008 15:29
-
FRR dates, processing latest (wanted to get this on this morning, but we're getting snowed under with L2 - so there's a number of articles coming on 125).
http://www.nasaspaceflight.com/content/?cid=5480
Added an addition (technically a correction) into the article (thanks to Philip), in regard to the Aug 3 SRB/ET mate (S0003 Ops). Their "improvements to ground processing" is showing S0003 as 15 days, so that would place it as Aug 18. I was told this week the charts are showing Aug 22, but that'll be pre-improvements and changes to ET/SRB mate post valve and Helium Inject Line work, so the additional line in the article now covers and explains.
-
#228
by
Justin Wheat
on 01 Aug, 2008 22:54
-
If the lon is required would the launch be aired on nasa tv with full coverage (walkout, strap-in, final poll, etc.)?
-
#229
by
AndrewSTS
on 01 Aug, 2008 23:00
-
If the lon is required would the launch be aired on nasa tv with full coverage (walkout, strap-in, final poll, etc.)?
You mean LON, not lon, it stands for Launch On Need, it's not a word. Also, this LON is STS-400, by Endeavour. Atlantis is launching on STS-125, not LON. This is Atlantis' section.
Answer to the pointless question is probably. Consider people reading your post as "annoyed".
-
#230
by
Orbiter
on 02 Aug, 2008 06:44
-
If the lon is required would the launch be aired on nasa tv with full coverage (walkout, strap-in, final poll, etc.)?
You mean LON, not lon, it stands for Launch On Need, it's not a word. Also, this LON is STS-400, by Endeavour. Atlantis is launching on STS-125, not LON. This is Atlantis' section.
Answer to the pointless question is probably. Consider people reading your post as "annoyed".
Didn't find it annoying. Questions can be asked. And the LON-400 is for Atlantis Rescue. Also, to Answer the question, yes they will cover it, and on the news too.
-
#231
by
Ronsmytheiii
on 02 Aug, 2008 14:00
-
-
#232
by
Chris Bergin
on 02 Aug, 2008 22:13
-
ET mate tomorrow...keep your eyes on the webcams (not that it may be possible given the cameras).
-
#233
by
psloss
on 03 Aug, 2008 13:08
-
Crane is on its way to pick up the tank...
-
#234
by
Endeavour118
on 03 Aug, 2008 14:56
-
have they offically signed off on the modified launch date of 10/2
-
#235
by
DaveS
on 03 Aug, 2008 15:01
-
have they offically signed off on the modified launch date of 10/2
No! That decision will be made during the August 14 PRCB meeting, not sooner. And right now the CR is for three days each. So the CR is October 5, not October 2.
-
#236
by
Launch Fan
on 03 Aug, 2008 15:07
-
-
#237
by
psloss
on 03 Aug, 2008 17:32
-
The tank crossing the transfer aisle...
-
#238
by
Ronsmytheiii
on 03 Aug, 2008 17:34
-
The tank crossing the transfer aisle...
here is a touched up version:
-
#239
by
Chris Bergin
on 03 Aug, 2008 21:16
-
ET is mated to the SRBs. Article will follow.