Here's a capture of what I believe the SLIC:Strike that! It's a close up of the backside of the FSS!
-
#183
by
Ronsmytheiii
on 18 Jul, 2008 15:02
-
Seems that something is coming in:
alright last guess: SLIC. Anyone in the know here?
-
#184
by
Chris Bergin
on 18 Jul, 2008 15:15
-
L2 Processing information this morning notes they've found a problem with the tank. We're checking into it.
-
#185
by
marsguy
on 18 Jul, 2008 17:18
-
Seems that something is coming in:
alright last guess: SLIC. Anyone in the know here?
SLIC and ORUC.
-
#186
by
cb6785
on 18 Jul, 2008 17:48
-
L2 Processing information this morning notes they've found a problem with the tank. We're checking into it.
Problem as in "oh shit we have to do this and this and this and..." or as in "yeah we're gonna have to fix this and then it's good to go"?
-
#187
by
Ronsmytheiii
on 18 Jul, 2008 18:04
-
Seems that something is coming in:
alright last guess: SLIC. Anyone in the know here?
SLIC and ORUC.
Alright then, looks like one is being hoisted off the trailer:
-
#188
by
marsguy
on 18 Jul, 2008 18:15
-
I believe that's SLIC being hoisted.
-
#189
by
Chris Bergin
on 18 Jul, 2008 18:41
-
L2 Processing information this morning notes they've found a problem with the tank. We're checking into it.
Problem as in "oh shit we have to do this and this and this and..." or as in "yeah we're gonna have to fix this and then it's good to go"?
The latter. R&R (likely) will be within the timelines.
-
#190
by
Chris Bergin
on 18 Jul, 2008 19:13
-
-
#191
by
Ronsmytheiii
on 18 Jul, 2008 19:30
-
-
#192
by
DaveS
on 18 Jul, 2008 21:03
-
Seems like they're in the process of removing the plastic covers from the ORUC and SLIC.
-
#193
by
DaveS
on 18 Jul, 2008 21:14
-
Both the ORUC and SLIC has now been uncovered. I guess the FSS is next up to be uncovered.
-
#194
by
Ronsmytheiii
on 19 Jul, 2008 00:47
-
Both the ORUC and SLIC has now been uncovered. I guess the FSS is next up to be uncovered.
Either shifts are changing, or they are done for the night. SLIC is on pallet, ORUC looking close to it.
-
#195
by
Chris Bergin
on 22 Jul, 2008 13:06
-
Per L2, they are delaying ET/SRB mate by two days (nothing drastic) due to valve R&R (previous article).
-
#196
by
hogan_terran
on 22 Jul, 2008 15:19
-
cool video, mostly STS-125 CEIT
Enjoy,
Hogan
-
#197
by
Chris Bergin
on 22 Jul, 2008 15:22
-
-
#198
by
AndrewSTS
on 22 Jul, 2008 20:31
-
-
#199
by
psloss
on 24 Jul, 2008 18:52
-