-
#260
by
sts1canada
on 15 Feb, 2008 19:23
-
The thermal cover is now closed, the EVAers are inside the airlock and they are about to connect their EMUs to the airlock supplies. 26 minutes to the ZOE, should have some good KU before the ZOE, PET 7:15
Richard
-
#261
by
siegfriedcqb
on 15 Feb, 2008 19:23
-
-
#262
by
sts1canada
on 15 Feb, 2008 19:25
-
The EVAers are relaying their congratulations to the MCC-H team that helped them train and perform this EVA, congratulations from MCC-H to them as well, and congratulations to the ISS & shuttle crew that supported them.
Richard
-
#263
by
VB94
on 15 Feb, 2008 19:26
-
Hatch closed
-
#264
by
siegfriedcqb
on 15 Feb, 2008 19:27
-
-
#265
by
sts1canada
on 15 Feb, 2008 19:28
-
The airlock hatch is now being closed and latched by Stan, 21 minutes to the ZOE.
Richard
-
#266
by
VB94
on 15 Feb, 2008 19:34
-
Repress in progress.
-
#267
by
sts1canada
on 15 Feb, 2008 19:34
-
EVA 1 & 3 EMUs are now hooked up to the airlock consumable supplies, the hatch is latched and locked and they have disconnected their waist tethers, getting ready for repress soon.
15 minutes to the ZOE, still have good KU through East at this time.
With the airlock hatch closed and latched, and the EVAers inside the airlock now safe, this will conclude my coverage of today's EVA. I had fun reporting today and I hope you enjoyed my text coverage. The airlock is now starting to repress.
See you guys for a future spacewalk sometime after STS-123, take care

Richard
-
#268
by
VB94
on 15 Feb, 2008 19:36
-
Pressure at 5 psi.
A leak check is now conducted.
-
#269
by
VB94
on 15 Feb, 2008 19:38
-
sts1canada - 15/2/2008 2:34 PM
I had fun reporting today and I hope you enjoyed my text coverage.
Of course.
Great work Richard.
-
#270
by
siegfriedcqb
on 15 Feb, 2008 19:40
-
Now that EVA-3 is complete thats me done for screen shots... that was good fun
-
#271
by
VB94
on 15 Feb, 2008 19:42
-
-
#272
by
Chris Bergin
on 15 Feb, 2008 19:48
-
-
#273
by
ckiki lwai
on 15 Feb, 2008 20:19
-
Great to see VB94, siegfriedcqb and bish48 took over the screen shooting, and Richard continuing his coverage, so I could catch up quickly.
Good job everyone!
-
#274
by
JohnV
on 15 Feb, 2008 21:25
-
MSB starting.
-
#275
by
JohnV
on 15 Feb, 2008 21:28
-
Alan T. reiterating that the Columbus ground control folks are having trouble staying ahead of the crew in terms of tasks.
Activation of Columbus considered complete and all payloads are now in their operational locations, including the external payloads attached during EVA 3.
-
#276
by
JohnV
on 15 Feb, 2008 21:29
-
Official EVA length is 7:25
-
#277
by
JohnV
on 15 Feb, 2008 21:30
-
Oh, the fixed FCMG and the refurbed NTA will be flown back to the ISS late next summer on ULF-3.
-
#278
by
JohnV
on 15 Feb, 2008 21:31
-
Reading a prepared statement in response to the expected questions about impact on ISS/Mission caused by the shoot down of USA 193.
As we all know, no risk expected.
-
#279
by
JohnV
on 15 Feb, 2008 21:32
-
PAO is referring questions to DoD.
Dryden being opened up to make sure the Navy has the needed oportunity to shoot down the satellite.