#40
by
Felix
on 11 Feb, 2008 12:47
-
Tani, Frick and Whitson in front of the hatch
-
#41
by
on 11 Feb, 2008 12:51
-
-
#42
by
dawei
on 11 Feb, 2008 12:51
-
6.9 psi
-
#43
by
DaveS
on 11 Feb, 2008 12:51
-
tesheiner - 11/2/2008 2:21 PM
The main task of this EVA is to install Columbus' PDGF and I presume the fixture wasn't installed pre-flight due to clearance issues with the payload bay doors.
Not the doors, but the OBSS. They decided to take it off pre-launch and attach it to a payload bay sidewall carrier for launch.
This is why the OBSS will have to be left at ISS prior to undocking of STS-123/1J/A. There's not enough clearance in the payload bay for the JEM and OBSS.
-
#44
by
Felix
on 11 Feb, 2008 12:52
-
-
#45
by
Felix
on 11 Feb, 2008 12:55
-
Ku-Band antenna of Atlantis has been stowed
Will be redeployed tomorrow morning
-
#46
by
haywoodfloyd
on 11 Feb, 2008 12:55
-
Are there 2 hatches between Quest and the rest of the Station?
-
#47
by
NYC777
on 11 Feb, 2008 13:01
-
Are there power and fluid umbilicals that have to be attached between Harmony and Columbus? It looks like form the time line that there aren't unless they're internal umbilicals?
-
#48
by
Jim
on 11 Feb, 2008 13:02
-
haywoodfloyd - 11/2/2008 8:55 AM
Are there 2 hatches between Quest and the rest of the Station?
3 hatches between vacuum and the rest of the station. one hatch between quest and station. 2 hatches between the crew lock and station
-
#49
by
JimO
on 11 Feb, 2008 13:17
-
eeergo: "They're bringing down the BMRRM in this flight! "
I was told off-line after the BMRRM EVA that there is only ONE spare, and
it has now been installed -- so the old one must be repaired and relaunched,
as well as thoroughly checked out to see if additional spares need to be
sent up in a few years.
The unit MIGHT barely be able to pass through the aft SM docking hatch, and
hence ride aboard an ESA supply drone.... The clearance would be VERY close.
-
#50
by
on 11 Feb, 2008 13:20
-
-
#51
by
on 11 Feb, 2008 13:24
-
-
#52
by
Felix
on 11 Feb, 2008 13:27
-
-
#53
by
on 11 Feb, 2008 13:29
-
-
#54
by
Chris Bergin
on 11 Feb, 2008 13:35
-
-
#55
by
joncz
on 11 Feb, 2008 13:35
-
Chris Bergin - 11/2/2008 8:11 AM
EVA for OMS Pod Blanket now officially recommened, pending group approval.
That ought to be quite the trick, since I thought the arm was at its limits with Danny O and the blanket on the front face of the OMS pod.
Wonder if they're considering using the OBSS as an extension again.
-
#56
by
Felix
on 11 Feb, 2008 13:36
-
Walheim's Helmet Cam No. is 18
and Love's Cam No. is 16
-
#57
by
ichilton
on 11 Feb, 2008 13:37
-
Ku-Band antenna of Atlantis has been stowed
Will be redeployed tomorrow morning
Will all downlink data just be re-routed through the ISS now then?
Thanks
Ian
-
#58
by
Felix
on 11 Feb, 2008 13:38
-
Stan Love outside the Quest Airlock
-
#59
by
ichilton
on 11 Feb, 2008 13:39
-
Are there power and fluid umbilicals that have to be attached between Harmony and Columbus? It looks like form the time line that there aren't unless they're internal umbilicals?
I was wondering that too because the timelines show they attach Columbus after the EVA has ended and ingress tomorrow so I guess the power/data cables must be internal?
Thanks
Ian