Tentative Indian launch schedule
2013
February 22 25, 1225UTC - PSLV C20 FLP - SARAL + Sapphire + NEOSSAT + BRITE + UniBRITE + AAUSAT3 + STRaND-1
May - GSLV-D5 (Mk II return to flight) SLP- GSAT-14
June- PSLV C22 FLP- IRNSS-1
October 25 - PSLV C25 - MangalYaan (Mars Orbiter)
End of the year or early 2014 - GSLV Mk III X1, SLP - "atmospheric test"
Q2 (May) - Ariane-5 - GSAT-7 (Navy Communications Satellite)
H2- Ariane-5 - Insat-3D
IRNSS seems to be delayed to 2013-3Q (Oct-Dec).
Pls
Refer Thx
~Prasad
-
#963
by
input~2
on 22 Feb, 2013 07:39
-
Performed launches
2013
February 25, 1231UTC - PSLV C20 FLP - SARAL + Sapphire + NEOSSat + BRITE + UniBRITE + AAUSAT3 + STRaND-1
Tentative launch schedule
2013
May - GSLV-D5 (Mk II return to flight) SLP- GSAT-14
Q3 - PSLV C22 FLP- IRNSS-1
October 25 - PSLV C25(XL) - MangalYaan (Mars Orbiter)
June - Ariane-5 - Insat-3D
July - Ariane-5 - GSAT-7 (Navy Communications Satellite)
one S/C piggybacked on PSLV from IMS(Indian Mini Satellite)/Atmos, IMS-1E, IMS-1F, Alsat-2B, NLS-9, Luxspace AIS, Nemo-AM, IinuSat, SRE-2, IMS-B
2014
early - GSLV Mk III X1, SLP - "atmospheric test"
- GSLV-D6 Mk II - GSAT-6
- PSLV C23 - IRNSS-2
- PSLV C24 - IRNSS-3
- PSLV C26(XL) SLP- AstroSat-1 + LAPAN-A2 + LAPAN-ORARI
- PSLV C27 - Cartosat-2C
piggybacked on PSLV : VENµS (SSO);IITMSAT;STUDSAT-2
- foreign launcher - GSAT-15
- foreign launcher - GSAT-11
- foreign launcher - GSAT-16
FY 2015-16
- PSLV C28 - IRNSS-4
- PSLV C29 - IRNSS-5
Q3 - GSLV MkII F09 - GSAT-9
- PSLV C31 - Resourcesat-2A
- PSLV C32 - Cartosat-2D
- PSLV C33 - EnMap (German satellite)(tbc)
- GSLV Mk II F08 - Chandrayaan-2
- foreign launcher - GSAT-17
- foreign launcher - GSAT-18
FY 2016-17
- PSLV C30 - IRNSS-6
- PSLV C34 - IRNSS-7
- GSLV Mk II F10 - GISAT (GEO Imaging SATellite)
- GSLV Mk II F11 - GSAT-6A
- GSLV -Mk III D1 - GSAT-19E
- PSLV C35 - Oceansat-3
- PSLV C36 - Cartosat-3
- foreign launcher - GSAT-11S
- foreign launcher - GSAT-Ka
piggybacked on PSLV: Aditya-1
FY 2017-18
- GSLV Mk II F12 - GSAT-7A
- GSLV Mk III D2 - GSAT-20
- PSLV C37 - RISAT-1A
December - GSLV Mk II F13 - INSAT-3DR
- foreign launcher/sat - GSAT-21
after 2020
- GSLV Mk III - Manned mission
updated Feb 25
updated Feb 26
-
#964
by
isro-watch
on 26 Feb, 2013 00:45
-
As per S. Ramakrishnan, director, Vikram Sarabhai Space Centre (VSSC), this year we will have:
GSLV in May
PSLV would soon place SPOT 7 satellite in orbit after which there would be couple of launches with foreign satellites. (?)
http://www.deccanchronicle.com/130222/news-current-affairs/article/desi-engine-power-gslv
This doesn't look like an erroneous reporting !
"Listing out launches to be
made by Isro this year, the VSSC director said PSLV would soon place SPOT 7 satellite in orbit after which there would be couple of launches with foreign satellites..."
Does anyone have any information on the SPOT-7 launch ? Will this be adjusted into the schedule for this year like SPOT-6 during last year?
-
#965
by
russianhalo117
on 26 Feb, 2013 01:54
-
As per S. Ramakrishnan, director, Vikram Sarabhai Space Centre (VSSC), this year we will have:
GSLV in May
PSLV would soon place SPOT 7 satellite in orbit after which there would be couple of launches with foreign satellites. (?)
http://www.deccanchronicle.com/130222/news-current-affairs/article/desi-engine-power-gslv
This doesn't look like an erroneous reporting !
"Listing out launches to be made by Isro this year, the VSSC director said PSLV would soon place SPOT 7 satellite in orbit after which there would be couple of launches with foreign satellites..."
Does anyone have any information on the SPOT-7 launch ? Will this be adjusted into the schedule for this year like SPOT-6 during last year?
Spot 7 is to mirror Spot 6 PSLV Configuration and launch sequence so I believe that is so for question 2.
-
#966
by
input~2
on 26 Feb, 2013 08:04
-
Does anyone have any information on the SPOT-7 launch ?Will this be adjusted into the schedule for this year like SPOT-6 during last year?
Apparently this launch will not happen this year with PSLV (moreover Astrium
has already announced a launch in early 2014):
since ISRO plans 9 more missions (ie S/C and domestic launchers) this year (
source)which can be accounted for as follows:
1-GSLV-D5
2-GSAT-14
3-PSLV C22
4-IRNSS-1
5-PSLV C25
6-MangalYaan
7-Insat-3D
8-GSAT-7
9-presumably 1 PSLV piggybacked S/C
(SPOT 7/PSLV would make it 10 more missions and not 9)
-
#967
by
space_person
on 05 Mar, 2013 08:50
-
Aditya is likely to be shifted to L1. This may cause delays.
-
#968
by
m.prasad
on 05 Mar, 2013 09:14
-
Apparently this launch will not happen this year with PSLV (moreover Astrium has already announced a launch in early 2014):
since ISRO plans 9 more missions (ie S/C and domestic launchers) this year (source)which can be accounted for as follows:
1-GSLV-D5
2-GSAT-14
3-PSLV C22
4-IRNSS-1
5-PSLV C25
6-MangalYaan
7-Insat-3D
8-GSAT-7
9-presumably 1 PSLV piggybacked S/C
(SPOT 7/PSLV would make it 10 more missions and not 9)
I guess, 9 is GSLV-M3's 1st experimental launch without Cryo stage & payload, named as M3-X1. (If so, not sure why ISRO considers this as a spl 'mission'; ideally it is similar to the S200 booster test, of course, integrated with L110!

. Pls
ReferThx
~Prasad
-
#969
by
input~2
on 05 Mar, 2013 13:59
-
-
#970
by
input~2
on 17 Mar, 2013 05:12
-
Performed launches
2013
February 25, 1231UTC - PSLV C20 FLP - SARAL + Sapphire + NEOSSat + BRITE + UniBRITE + AAUSAT3 + STRaND-1
Tentative launch schedule
2013
May - GSLV-D5 (Mk II return to flight) SLP- GSAT-14
June - PSLV C22 FLP- IRNSS-1
October 25 - PSLV C25(XL) - MangalYaan (Mars Orbiter)
June - Ariane-5 - Insat-3D
July - Ariane-5 - GSAT-7 (Navy Communications Satellite)
one S/C piggybacked on PSLV from IMS(Indian Mini Satellite)/Atmos, IMS-1E, IMS-1F, Alsat-2B, NLS-9, Luxspace AIS, Nemo-AM, IinuSat, SRE-2, IMS-B
2014
early - GSLV Mk III X1, SLP - "atmospheric test"
- GSLV-D6 Mk II - GSAT-6
April - PSLV C23 - IRNSS-2
- PSLV C24 - IRNSS-3
- PSLV C26(XL) SLP- AstroSat-1 + LAPAN-A2 + LAPAN-ORARI
- PSLV C27 - Cartosat-2C
piggybacked on PSLV : VENµS (SSO);IITMSAT;STUDSAT-2
- foreign launcher - GSAT-15
- foreign launcher - GSAT-11
- foreign launcher - GSAT-16
FY 2015-16
- PSLV C28 - IRNSS-4
- PSLV C29 - IRNSS-5
Q3 - GSLV MkII F09 - GSAT-9
- PSLV C31 - Resourcesat-2A
- PSLV C32 - Cartosat-2D
- PSLV C33 - EnMap (German satellite)(tbc)
- GSLV Mk II F08 - Chandrayaan-2
- foreign launcher - GSAT-17
- foreign launcher - GSAT-18
FY 2016-17
- PSLV C30 - IRNSS-6
- PSLV C34 - IRNSS-7
- GSLV Mk II F10 - GISAT (GEO Imaging SATellite)
- GSLV Mk II F11 - GSAT-6A
- GSLV -Mk III D1 - GSAT-19E
- PSLV C35 - Oceansat-3
- PSLV C36 - Cartosat-3
- foreign launcher - GSAT-11S
- foreign launcher - GSAT-Ka
piggybacked on PSLV: Aditya-1
FY 2017-18
- GSLV Mk II F12 - GSAT-7A
- GSLV Mk III D2 - GSAT-20
- PSLV C37 - RISAT-1A
December - GSLV Mk II F13 - INSAT-3DR
- foreign launcher/sat - GSAT-21
after 2020
- GSLV Mk III - Manned mission
-
#971
by
hornbill2007
on 20 Mar, 2013 15:31
-
So no GSLV Mk3 this year!
-
#972
by
input~2
on 21 Mar, 2013 16:40
-
So no GSLV Mk3 this year!
Maybe X1 (experimental test) during this [Indian fiscal] year (ending 3/31/2014)
-
#973
by
input~2
on 24 Mar, 2013 09:20
-
-
#974
by
input~2
on 24 Mar, 2013 09:42
-
Performed launches
2013
February 25, 1231UTC - PSLV C20 FLP - SARAL + Sapphire + NEOSSat + BRITE + UniBRITE + AAUSAT3 + STRaND-1
Tentative launch schedule
April 2013 to March 2014
mid-June - PSLV C22 FLP- IRNSS-R1A
July 15-31 Q3-Q4 - GSLV-D5 (Mk II return to flight) SLP- GSAT-14
October 25 - PSLV C25(XL) - MangalYaan (Mars Orbiter)
January - GSLV Mk III X1, SLP - "atmospheric test"
Q1- PSLV C23 - IRNSS-R1B
one S/C piggybacked on PSLV from IMS(Indian Mini Satellite)/Atmos, IMS-1E, IMS-1F, Alsat-2B, NLS-9, Luxspace AIS, Nemo-AM, IinuSat, SRE-2, IMS-B
June July 15-31 - Ariane-5 - Insat-3D
2013-H2 - Ariane-5 - GSAT-7 (Navy Communications Satellite)
April 2014 to March 2015
April - GSLV Mk III X1, SLP - "atmospheric test"
- PSLV C24 - IRNSS-R1C
- GSLV-D6 Mk II - GSAT-6
- PSLV C26(XL) SLP- AstroSat-1 + LAPAN-A2 + LAPAN-ORARI
- PSLV C27 - Cartosat-2C
- PSLV C28 - IRNSS-R1D
- PSLV C29 - IRNSS-R1E
piggybacked on PSLV : VENµS (SSO);IITMSAT;STUDSAT-2
- foreign launcher - GSAT-15
- foreign launcher - GSAT-11
April 2015 to March 2016
Q3 - GSLV MkII F09 - GSAT-9
- PSLV C31 - Resourcesat-2A
- PSLV C32 - Cartosat-2E
- PSLV C33 - EnMap (German satellite)(tbc)
- GSLV Mk II F08 - Chandrayaan-2
-PSLV C30 - IRNSS-R1F
-PSLV C34 - IRNSS-R1G
- foreign launcher - GSAT-16
- foreign launcher - GSAT-17
- foreign launcher - GSAT-18
April 2016 to March 2017
- GSLV Mk II F10 - GISAT (GEO Imaging SATellite)
- GSLV Mk II F11 - GSAT-6A
- GSLV -Mk III D1 - GSAT-19E
- PSLV C35 - Oceansat-3
- PSLV C36 - Cartosat-3
piggybacked on PSLV: Aditya-1
- foreign launcher - GSAT-11S
- foreign launcher - GSAT-Ka
FY 2017-18
- GSLV Mk II F12 - GSAT-7A
- GSLV Mk III D2 - GSAT-20
- PSLV C37 - RISAT-1A
December - GSLV Mk II F13 - INSAT-3DR
- foreign launcher/sat - GSAT-21
after 2020
- GSLV Mk III - Manned mission
updated March 30
updated April 4
updated April 9
updated April 20
updated April 23
updated April 27
-
#975
by
Galactic Penguin SST
on 28 Mar, 2013 18:45
-
-
#976
by
Salo
on 09 Apr, 2013 20:53
-
“We have received permissions from the government for two developmental flights of GSLV with indigenous cryogenic engine. The first developmental flight is expected in 18 months after the experimental flight in January, 2014,” said S Somnath, project director of GSLV Mk-III programme at Vikram Sarabhai Space Centre, Thiruvananthapuram.
http://www.deccanherald.com/content/325039/indias-first-manned-space-flight.html
-
#977
by
input~2
on 11 Apr, 2013 20:12
-
“We have received permissions from the government for two developmental flights of GSLV with indigenous cryogenic engine. The first developmental flight is expected in 18 months after the experimental flight in January, 2014,” said S Somnath, project director of GSLV Mk-III programme at Vikram Sarabhai Space Centre, Thiruvananthapuram.
http://www.deccanherald.com/content/325039/indias-first-manned-space-flight.html
Thanks. Since ISRO recent annual report has GSLV MkIII D1 launch in FY2016-17, I will keep it there until an earlier date (like July 2015) is stabilized.
-
#978
by
russianhalo117
on 17 Apr, 2013 17:21
-
Performed launches
2013
February 25, 1231UTC - PSLV C20 FLP - SARAL + Sapphire + NEOSSat + BRITE + UniBRITE + AAUSAT3 + STRaND-1
Tentative launch schedule
April 2013 to March 2014
June - PSLV C22 FLP- IRNSS-R1A
July 15-31 Q3-Q4 - GSLV-D5 (Mk II return to flight) SLP- GSAT-14
October 25 - PSLV C25(XL) - MangalYaan (Mars Orbiter)
January - GSLV Mk III X1, SLP - "atmospheric test"
Q1-2014- PSLV C23 - IRNSS-R1B
one S/C piggybacked on PSLV from IMS(Indian Mini Satellite)/Atmos, IMS-1E, IMS-1F, Alsat-2B, NLS-9, Luxspace AIS, Nemo-AM, IinuSat, SRE-2, IMS-B
June - Ariane-5 - Insat-3D
2013-H2 - Ariane-5 - GSAT-7 (Navy Communications Satellite)
January has past, you might want to double check this entry as the date does not match (fit in) with the surrounding entries in this schedule:
January - GSLV Mk III X1, SLP - "atmospheric test"
-
#979
by
GClark
on 18 Apr, 2013 02:04
-
Not attempting to be a smarta$$, but...
Perhaps you missed the "April 2013 to March 2014" line?