#740
by
Stan Black
on 27 Apr, 2011 18:45
-
-
#741
by
input~2
on 27 Apr, 2011 21:06
-
From the Mission Profile posted above, there is only GSLV D4 flying in the FY 2011-12. This, ISRO, Chairman said will fly with a Russian cryo to check out the vehicle design. So, the GSAT-14 would likely fly on a GSLV Mk-I.
- Pradeep
Taking into account:
A)
http://www.deccanchronicle.com/node/23871 dated April 21:
“Isro is re-working on the [
GSLV MKI] design specifications and planning for a
test flight by the end of the first half of 2012,” said Mr P. S. Veeraraghavan, director, Vikram Sarabhai Space Centre,
B) (
http://www.rian.ru/science/20110420/366470673.html dated April 20)
"According to the head of ISRO Radhakrishnan, after careful check of
12КRB it is necessary to make a
test launch which is planned for 2011-2012 (will end on March, 31st, 2012).
After that, India will not have any Russian cryogenic engine (altogether seven units have been bought ), and
the following GSLV will go to space in 2012 with an Indian engine which is now under completion."
C) from the ISRO 2010-11 annual report (uploaded on March 29), GSAT-14 is to be launched on GSLV-MKII
It could be concluded that GSAT-14 will be onboard that GSLV-MKII planned for 2012.
-
#742
by
pradeep
on 28 Apr, 2011 05:55
-
This article was mentioned as being questionable on another thread. It raises a few questions; like how many upper stages remain; and why are they modifying an engine pump?
Of the seven engines procured from Russia , only two are left, said Ramakrishnan.
- six have been used?
http://forum.nasaspaceflight.com/index.php?topic=23302.msg727543#msg727543
http://www.novosti-kosmonavtiki.ru/content/numbers/188-189/24.shtml
http://www.novosti-kosmonavtiki.ru/content/numbers/238/22.shtml
Stan,
I think this -
http://www.hindustantimes.com/PSLV-C16-successfully-launched-satellites-injected-into-orbit/Article1-687398.aspx - will clarify that a bit:
A high pressure booster pump in an indigenous cryogenic engine that had not performed upto expectations in an earlier GSLV mission has been redesigned and successfully tested. “We are even planning to integrate into the remaining Russian cryo engine to boost its performance,” he said.
I think it was this booster that failed on GSLV D3 was redesigned and when tested performed well - so ISRO might have introduced this design change into the Russian cryo as well.
(http://www.rian.ru/science/20110420/366470673.html dated April 20)
"According to the head of ISRO Radhakrishnan, after careful check of 12КRB it is necessary to make a test launch which is planned for 2011-2012 (will end on March, 31st, 2012). After that, India will not have any Russian cryogenic engine (altogether seven units have been bought ), and the following GSLV will go to space in 2012 with an Indian engine which is now under completion."
input~2,
I think a careful reading (see marking in blue) would suggest that the Russian cryo would be tested first and this would be followed with a test flight of the Indian cryo. Perhaps, this means that there will be a second GSLV flight in 2012.
The Mission Profile on the ISRO Annual Report is not an absolute timeline. It is a rough timeline "as planned" not "as executed". ISRO is still testing the Indian cryo sub-systems. It would need at least 3-4 tests at a system level before it will be flown. This would probably push it to the end of 2012 in the best case scenario.
Let's see how this works out.
-
#743
by
isro-watch
on 29 Apr, 2011 03:20
-
Adding to Pradeep's discussion:
There may be two sort of experimental launches now
1. GSLV D4....testing the modified Indian cryogenic engine.
2. GSLV F5(?)...testing the changes made to the GSLV design with the sole Russian engine left
-
#744
by
isro-watch
on 29 Apr, 2011 03:34
-
One of my souces in ISRO indicated that ISRO plans to launch GSLV MK-III with only the first and second stages into a LEO....that's a test launch with S200 boosters and the L110 engine
can any one confirm this...?
Is this feasible ?
-
#745
by
pradeep
on 29 Apr, 2011 07:27
-
Adding to Pradeep's discussion:
There may be two sort of experimental launches now
1. GSLV D4....testing the modified Indian cryogenic engine.
2. GSLV F5(?)...testing the changes made to the GSLV design with the sole Russian engine left
Hmm. I was suggesting that GSLV D4 would be the one with a Russian cryo and the GSLV D5 will be the one with modified Indian cryo engine. D4 will test vehicle design with a proven Russian engine whilst D5 will test the Indian cryo was how I understood it.
Perhaps we should move this discussion out of the Indian Launch Schedule discussion?
Pradeep
-
#746
by
input~2
on 29 Apr, 2011 12:48
-
Perhaps we should move this discussion out of the Indian Launch Schedule discussion?
Pradeep
Yes, if posts are not directly linked to the Indian launch schedule, it's best to start separate threads..
-
#747
by
johnxx9
on 29 Apr, 2011 18:53
-
As far I know, ISRO is seriously considering flying the GSLV with the Russian cryogenic stage. The shroud that stage needs to be strengthened and tested. A very expensive and long procedure for a stage which will be launched only once. The last launch of the Mk-I was supposed to be GSAT-7 which was supposed to take place this year if all had gone well.
IMHO, there is a reasonable chance that the last Russian cryo stage may go unused. D4 will indeed be a Mk-II development flight.
-
#748
by
input~2
on 29 Apr, 2011 20:02
-
According to the Director of Sathish Dhawan Space Centre:
(
http://www.thehindu.com/news/states/tamil-nadu/article1819659.ece )
- PSLV C-17 will be launched in July
- PSLV-C18 will be launched in September
- PSLV-C19 will be launched by this year end
- Building of GSLV-Mk III will be over by 2012 end and launch would be in 2013.
The first stage, solid propellant booster S-200 has been tested and qualified; second and liquid propellant stage L-110 has also been tested. Work is yet to be completed in third stage, the cryogenic stage.
-
#749
by
input~2
on 29 Apr, 2011 20:12
-
Launch performed in 2011
April 20 0442UTC- PSLV C16 - Resourcesat-2 (includes COM DEV AIS Sat) + X-sat + IMS-1A/Youthsat
Tentative launch schedule
2011
May 19 - Ariane 5 - GSAT-8 (Insat-4G) (includes Gagan)
July - PSLV C17 - GSAT-12
September - PSLV C18 - Megha-Tropiques + LAPAN-A2 + LAPAN-ORARI (A3)
Late October/Early November - PSLV C19 (XL) - RISAT-1+SRMSAT+Jugnu+Venta-1
2012
- ? - GSAT-7 (Navy Communications Satellite)
Q1 - Ariane-5 - GSAT-10 (includes Gagan)
June - last GSLV Mk I - GSAT-6 (Insat-4E)
NET Q2- PSLV C20 - SARAL + SAPPHIRE + NEOSSat+BRITE-Austria (aka TUGSAT-1/CanX-3b) + UniBRITE(aka CanX-3a)
- ? - Insat 3D
- PSLV C21 - IRNSS-1 (during FY 2012-2013)
- PSLV - SRE-2, PROTIERS, CanX-4, CanX-5, NLS-9, WNISAT-1
- PSLV - Cartosat-2C
- PSLV - AstroSat-1
- PSLV - SPOT-6 (French remote sensing satellite)
H2 - GSLV Mk II - GSAT-14
H2? - GSLV Mk III - experimental launch
piggybacked on PSLV: IMS-1B
2013
- ? - GSAT-9 (includes Gagan)(during FY 2013-2014)
- ? - GSAT-11
- PSLV - IRNSS-2 (or 2014)
- ? - GSAT-10R
- ? - GSAT-11S
- ? - GSAT-17
- GSLV MK III -GSAT-11E
- PSLV - SCATSAT
- GSLV Mk II - INSAT-3DR
- PSLV - Resourcesat-2R
- PSLV -Cartosat-2D
NET September - GSLV Mk II - Chandrayaan-2
piggybacked on PSLV: Aditiya-1 (or 2014), IMS(Indian Mini Satellite)/Atmos, IMS-1E, IMS-1F, Alsat-2B
2014
-PSLV - Oceansat-3
- PSLV - CCI-Sat
- PSLV - EnMAP
- PSLV - IRNSS-3
2015
- GSLV - GSAT-13 (to be approved)
- GSLV - GSAT-4R (to be approved)
2016/2017
- GSLV - Manned mission
after 2015
- GSLV - Mars probe
Updated on May 3
Updated on May 13
-
#750
by
input~2
on 03 May, 2011 12:35
-
According to Latvian Radio, Venta-1 is planned to be launched by late October/early November
(
source)
-
#751
by
Salo
on 08 May, 2011 20:08
-
-
#752
by
input~2
on 10 May, 2011 06:04
-
PSLV are workhorses with respectable payloads of about 1600 kg. In 2011, PSLVs will launch GSAT-12, the Megha-Tropiques satellite, GSAT-6 and Radar Imaging Satellite (RISAT-1), all from Sriharikota. Another GSAT would also be launched from Kourou, French Guiana, by an Ariane rocket from Arianespace in June 2011.
Source.
We had
consistent ISRO sources indicating just 3 more PSLV launches until 31 December 2011. BTW, GSAT-6, with a lift-off mass of 2200kg, can't be launched by PSLV
-
#753
by
input~2
on 13 May, 2011 19:42
-
-
#754
by
input~2
on 15 May, 2011 18:35
-
Launch performed in 2011
April 20 0442UTC- PSLV C16 - Resourcesat-2 (includes COM DEV AIS Sat) + X-sat + IMS-1A/Youthsat
May 20 2038UTC - Ariane 5 ECA - GSAT-8 (includes Gagan)
Tentative launch schedule
2011
Mid-July 2nd week- PSLV C17 - GSAT-12
September - PSLV C18 - Megha-Tropiques + LAPAN-A2 + LAPAN-ORARI (A3) + Orbcom AIS-Sat-1(equatorial)
October - PSLV C19 (XL) - RISAT-1+SRMSAT+Jugnu+Venta-1
2012
Q1 - GSLV Mk II (return to flight) - GSAT-6 (Insat-4E)
NET Q2- PSLV C20 - SARAL + SAPPHIRE + NEOSSat+BRITE-Austria (aka TUGSAT-1/CanX-3b) + UniBRITE(aka CanX-3a)
- GSLV MkII - GSAT-7 (Navy Communications Satellite)
- ? - Insat 3D
- PSLV C21 - IRNSS-1 (during FY 2012-2013)
- PSLV - SRE-2, PROTIERS, CanX-4, CanX-5, NLS-9, WNISAT-1
- PSLV - Cartosat-2C
- PSLV - AstroSat-1
- PSLV - SPOT-6 (French remote sensing satellite)
H2 - GSLV Mk II - GSAT-14
- Ariane-5 - GSAT-10 (includes Gagan)
piggybacked on PSLV: IMS-1B
2013
- ? - GSAT-9 (includes Gagan)(during FY 2013-2014)
- ? - GSAT-11
- PSLV - IRNSS-2 (or 2014)
- ? - GSAT-10R
- ? - GSAT-11S
- ? - GSAT-17
- GSLV Mk III - experimental launch
- GSLV MK III -GSAT-11E
- PSLV - SCATSAT
- GSLV Mk II - INSAT-3DR
- PSLV - Resourcesat-2R
- PSLV -Cartosat-2D
piggybacked on PSLV: Aditiya-1 (or 2014), IMS(Indian Mini Satellite)/Atmos, IMS-1E, IMS-1F, Alsat-2B
2014
- GSLV Mk II - Chandrayaan-2
- PSLV - Oceansat-3
- PSLV - CCI-Sat
- PSLV - EnMAP
- PSLV - IRNSS-3
2015
- GSLV - GSAT-13 (to be approved)
- GSLV - GSAT-4R (to be approved)
2016/2017
- GSLV - Manned mission
after 2015
- GSLV - Mars probe
Updated May 16
Updated May 20
Updated May 22
Updated June 2
-
#755
by
input~2
on 15 May, 2011 18:36
-
-
#756
by
input~2
on 16 May, 2011 06:22
-
According to ISRO Chairman, GSLV-MkIII static testing will continue till 2012 (
source), so the experimental launch will not take place before 2013.
PSLV C-17 launch planned in mid-July (
source)
-
#757
by
Salo
on 22 May, 2011 19:06
-
-
#758
by
Salo
on 22 May, 2011 19:53
-
-
#759
by
Salo
on 02 Jun, 2011 14:21
-