-
#1440
by
gongora
on 10 Jul, 2018 04:12
-
As the Commission is aware, BlackSky is under a tight timetable to ship its
Global-1 satellite on July 15, 2018, for a September launch.
Global-1 is on a PSLV flight.
-
#1441
by
TheVarun
on 12 Jul, 2018 15:59
-
If the next PSLV flight is in September, does that mean the other scheduled launches- GSLV Mark 2 with GSAT-7A, GSLV Mark 3 with GSAT-29, PSLV with an IRNSS and the Chandrayaan launch, will also be pushed back? Or more likely, the Chandrayaan mission will go as planned in October, but the other 2-3 will be delayed?
-
#1442
by
Salo
on 20 Jul, 2018 07:46
-
-
#1443
by
Salo
on 20 Jul, 2018 07:50
-
-
#1444
by
Salo
on 20 Jul, 2018 07:53
-
https://indianexpress.com/article/technology/science/isro-to-launch-numerous-rockets-around-years-end-5263157/According to Sivan, in September ISRO will fly a PSLV rocket with two foreign satellites, earning revenue for the country. In October, another PSLV rocket will fly with an Indian remote sensing satellite and several foreign satellites. October will also see India’s heaviest rocket 640-ton GSLV Mk III flying up with GSAT-29 with Ka x Ku multi-beam and optical communication payloads. The mission targets Village Resource Centres (VRC) in rural areas to bridge the digital divide.
In November, ISRO will fly a GSLV Mk II rocket to put into orbit GSAT-7A, to be used by the Indian Air Force (IAF). Earlier, ISRO had launched GSAT-7 or Rukmini satellite for the Indian Navy.
Queried about the 5.8-ton GSAT-11, a communication satellite that was recalled from French Guiana this April, Sivan said: “We expect the satellite to be launched before the end of this year. Discussions with Arianespace are on regarding the time and date of the satellite launch.”
-
#1445
by
gongora
on 21 Jul, 2018 15:14
-
An American cubesat launching on PSLV around December (arranged through Spaceflight):
Analytical Space "Meshbed" 3U CubeSat (0585-EX-CN-2018)
The overall goal of the Meshbed mission, is to test an experimental phased array
communication antenna, model named FUSE.
The satellite will be launched as a secondary payload aboard a Polar Satellite Launch
Vehicle (PSLV) operated by the Indian Space Research Organization (ISRO), from
Sriharikota, India in December 2018, and deployed upon the rocket reaching orbit. It will
be deployed from the rocket in a 550 km circular orbit, on an inclination from the equator
of 97.6 degrees.
-
#1446
by
TheVarun
on 21 Jul, 2018 17:23
-
^^^
So does this mean that there are going to be 3 PSLV launches before the end of the year? The purely commercial one in September, another PSLV with an Indian remote sensing satellite and a few foreign ones, and finally the December mission with an American "Meshbed" satellite.
Or are all these tentative and mixed up, or two of them anyway. The December launch with the US satellite is referring to the same mission as the October one with an Indian Cartosat etc., and the month is still up in the air. Anyone can clarify?
-
#1447
by
input~2
on 22 Jul, 2018 10:05
-
Launch performed in 2018
January 12 03:59 UTC- PSLV C40 (FLP) - Cartosat-2F- INS-1C - Microsat - Telesat LEO-1- Carbonite-2 +26 Nanosats
March 29 11:26 UTC- GSLV F-08 (SLP) - GSAT-6A
April 11 22:34 UTC - PSLV XL C41 (FLP) - IRNSS-1I
Tentative launch schedule
2018
September - PSLV-C42 - SSTL-S1 & NovaSAR-S + foreign small sats
October - PSLV-C43 - "ISRO EO sat" HySIS & 25-30 foreign small sats
October - GSLV Mk III D2 (SLP) - GSAT-29
November - GSLV F12 - GSAT-7A
Late 2018 - PSLV C45 - RISAT-2B
piggybacked on PSLV : IMS(Indian Mini Satellite)/Atmos, IMS-1E, IMS-1F, IinuSat, IMS-B, NEMO-AM (FY 2018-19), PlanetiQ-1, PlanetiQ-2, InnoSat-2 (Malaysia)
NET November 30 - Ariane 5 - GSAT-11
December - Ariane 5 - GSAT-31
2019
NET January 3- GSLV MkIII F10 (SLP) - Chandrayaan-2 (was 2018)
- PSLV - Cartosat-3 (or 2019)
- PSLV - Oceansat-3 (or 2019)
Q2 - PSLV - Cartosat-3A
Q2 - GSLV - GISAT (GEO Imaging SATellite)
May - SSLV Demo 1
August - GSLV MkIII F01 - GSAT-20
- PSLV - HRSAT (3 s/c)
- GSLV ? - GSAT-30
- GSLV MkIII D3? - GSAT-22 (or 2020)
- PSLV - RISAT-1A - PSLV - RISAT-2A
October - SSLV Demo 2
December - PSLV XL - Aditiya-L1
piggybacked on PSLV: HYSIS
2020
Q1 - PSLV - Oceansat-3A
March - PSLV - Cartosat-3B
Q2 - PSLV - Resourcesat-3S
Q2 - PSLV - Resourcesat-3
- PSLV - EnMap (Germany)
- PSLV? - MOM-2
- GSLV - GISAT-1A
2021
Q2 - PSLV - Resourcesat-3SA
Q2 - PSLV - Resourcesat-3A
December - GSLV - NISAR (NASA-ISRO SAR sat)
2022
Q1 - PSLV - Resourcesat-3B
- GSLV - Insat-3DS
>2024
- GSLV MkIII - First manned mission
updated July 25
updated Aug 4
updated Aug 6
updated Aug 12
-
#1448
by
russianhalo117
on 22 Jul, 2018 16:13
-
GSAT-11 entry is out of date: Per the latest from CNES and Arianespace launch currently targeting the November slot:
As posted on the NSF schedule:
2018:
NET November - GSAT-11 - Ariane 5 ECA - Kourou ELA-3
-
#1449
by
Salo
on 24 Jul, 2018 07:50
-
-
#1450
by
abhishek
on 04 Aug, 2018 12:48
-
-
#1451
by
Olaf
on 09 Aug, 2018 12:20
-
-
#1452
by
worldtimedate
on 09 Aug, 2018 19:52
-
https://timesofindia.indiatimes.com/city/chennai/indian-space-research-organisation-plans-to-increase-launch-rate-to-12-a-year/articleshow/65097509.cms
CHENNAI: To keep pace with the rising demands of the country, Indian Space Research Organisation (Isro) will increase its satellite launches to at least 12 a year, said Vikram Sarabhai Space Centre (VSSC) director S Somanath.
"We are also planning to build high data communication satellites (at least 100 Gigabyte per second) and landing on the moon by Chandrayan II by next year," he told reporters after speaking at Sathyabama University's 27th convocation programme on Sunday.
Though such an ambitious plan is desirable by everyone who follows Indian Space Program closely, yet it is rather implausible at the current scenario owing to the two recent mishaps, until the problem pertaining to the quality control in the manufacturing of satellite components are sorted out. ISRO has to tread cautiously before the quality control issue involving the private sector is fixed once for all, by meticulously checking every component manufactured by the growing number of private companies, before the assembly of the satellites.
--- [ --- ]
-
#1453
by
Salo
on 12 Aug, 2018 08:21
-
-
#1454
by
Salo
on 12 Aug, 2018 11:46
-
http://www.newsonair.com/Main-News-Details.aspx?id=351385ISRO will launch 50 satellites in next three years
The Indian Space Research Organisation (ISRO) will launch 50 satellites in the next three years to meet the growing demand for space applications in India.
Chairman of ISRO Dr K Sivan told this to reporters in Bengaluru at the ISRO headquarters after the inauguration of bust of Dr Vikram Sarabhai, the first Chairman of ISRO whose 99th birth anniversary is being celebrated today.
Dr. Sivan said, two launches will be planned every month from February next year, which he said, will be a record in the history of space programme. The Chairman also said, Chandrayaan II mission to moon with a lander is planned in January next year. ISRO will also launch two demonstration flights of Small Satellite Launch Vehicle in mid of next year.
-
#1455
by
Salo
on 12 Aug, 2018 11:59
-
-
#1456
by
input~2
on 12 Aug, 2018 14:35
-
Launch performed in 2018
January 12 03:59 UTC- PSLV C40 (FLP) - Cartosat-2F- INS-1C - Microsat - Telesat LEO-1- Carbonite-2 +26 Nanosats
March 29 11:26 UTC- GSLV F-08 (SLP) - GSAT-6A
April 11 22:34 UTC - PSLV XL C41 (FLP) - IRNSS-1I
Tentative launch schedule
2018
September 15 - PSLV-C42 - SSTL S1-4 & NovaSAR-1 + foreign small sats
October 1-7- GSLV Mk III D2 (SLP) - GSAT-29
October November (or October) - PSLV-C43 - HySIS & 30 foreign small sats
December - GSLV F11 PSLV C44- EMIsat
piggybacked on PSLV : IMS(Indian Mini Satellite)/Atmos, IMS-1E, IMS-1F, IinuSat, IMS-B, NEMO-AM (FY 2018-19), PlanetiQ-1, PlanetiQ-2, InnoSat-2 (Malaysia)
November 30 - Ariane 5 - GSAT-11
December ~15 - Ariane 5 - GSAT-31 (repl. for Insat-4CR)
2019
NET January 3 - GSLV MkIII M1 (SLP) - Chandrayaan-2
January - PSLV C45 - RISAT-2B
Q1? (or November 2018) - GSLV F11 - GSAT-7A
February- PSLV C46 - Cartosat-3 + Nemo-AM
March - PSLV C47 - RISAT-2BR1
Q2 - PSLV - Cartosat-3A
Q2 - GSLV - GISAT (GEO Imaging SATellite)
May (or June) - SSLV Demo 1
August - GSLV MkIII F01 - GSAT-20
October - SSLV Demo 2
October - GSLV - GSAT-32 (repl. for GSAT-6A)
December - PSLV XL - Aditiya-L1
- PSLV - HRSAT (3 s/c)
- GSLV ? - GSAT-30
- GSLV MkIII D3? - GSAT-22 (or 2020)
- PSLV - RISAT-1A
- PSLV - RISAT-2A
- PSLV - IRNSS-1J
- PSLV - Oceansat-3
May - Ariane 5 - GSAT-30 (repl. for Insat-4A)
2020
Q1 - PSLV - Oceansat-3A
March - PSLV - Cartosat-3B
Q2 - PSLV - Resourcesat-3S
Q2 - PSLV - Resourcesat-3
- PSLV - EnMap (Germany)
- PSLV? - MOM-2
- GSLV - GISAT-1A
2021
Q2 - PSLV - Resourcesat-3SA
Q2 - PSLV - Resourcesat-3A
December - GSLV - NISAR (NASA-ISRO SAR sat)
2022
Q1 - PSLV - Resourcesat-3B
- GSLV - Insat-3DS
>2024
- GSLV MkIII - GaganYaan (First manned mission)
updated Aug. 13
updated Aug 16
updated Aug 17
updated August 28
-
#1457
by
input~2
on 12 Aug, 2018 16:08
-
Chandrayaan-2 to be launched in January-March window in 2019"Next year from February to December we plan to have 22 missions with almost two missions per month, which is a very important activity. This tight schedule of programmes we are doing for the first time.
We have set a target.We may not be able achieve but we are targeting it. So many missions in a year is a huge target for the first time in the history of ISRO," Sivan said.
The remaining months of 2018 would also be very hectic for ISRO as it plans to launch at least two missions every month, he said.
"Our next mission is PSLV C42, which will launch NOVASAT and S1-4. These two satellites are commercial satellites from the U.K.It is a commercial mission and is planned in September. Subsequently we have two missions each month," the ISRO chief said.
In October this year ISRO would launch GSAT29 for the Digital India programme and hyper spectrum imaging satellites along with 30 commercial satellites, Sivan said.
The following month GSAT-7A will be launched, while in December there would be two missions,GSLV-F11 launching AMISAT and GSAT-31, a replacement for INSAT 4CR, whose life will get over by January, he said.
ISRO would have two missions Chandrayan-2 by GSLV Mark 3 and the PSLV P45 launching RA-SAT 2B next year.
"AMISAT" is presumably EMIsat and "RA-SAT 2B" presumably RISAT-2B
-
#1458
by
TheVarun
on 12 Aug, 2018 20:52
-
", while in December there would be two missions,GSLV-F11 launching AMISAT and GSAT-31, a replacement for INSAT 4CR, whose life will get over by January, he said."
Whoa, if I read this correctly, the GSLV F-11( and this is the first time we're hearing of it, I'm sure) will launch two satellites, into a geosynchronous orbit. So it will be ISRO's first 'multi-launch' involving the GSLV. Excellent.
-
#1459
by
ZachS09
on 13 Aug, 2018 02:41
-
", while in December there would be two missions,GSLV-F11 launching AMISAT and GSAT-31, a replacement for INSAT 4CR, whose life will get over by January, he said."
Whoa, if I read this correctly, the GSLV F-11( and this is the first time we're hearing of it, I'm sure) will launch two satellites, into a geosynchronous orbit. So it will be ISRO's first 'multi-launch' involving the GSLV. Excellent.
Sorry, but you're wrong. GSat 31 is being launched by Arianespace from French Guiana.