Launch performed in 2018
January 12 03:59 UTC- PSLV C40 (FLP) - Cartosat-2F- INS-1C - Microsat - Telesat LEO-1- Carbonite-2 +26 Nanosats
Tentative launch schedule
2018
late March - GSLV F-08 (SLP) - GSAT-6A
April - PSLV-XL-C41(FLP) - IRNSS-1I
April or October- GSLV F-10 (SLP) - Chandrayaan-2
May - PSLV-C42 (FLP) - tbd
June - GSLV Mk III D2 (SLP) - GSAT-29
- PSLV - Cartosat-3
- PSLV - Oceansat-3
- GSLV F12 - GSAT-7A
piggybacked on PSLV : IMS(Indian Mini Satellite)/Atmos, IMS-1E, IMS-1F, IinuSat, IMS-B, NEMO-AM (FY 2018-19), PlanetiQ-1, PlanetiQ-2, InnoSat-2 (Malaysia)
May Ariane 5 - GSAT-11
2019
Q2 - PSLV - Cartosat-3A
Q2 - GSLV - GISAT (GEO Imaging SATellite)
Q2 - PSLV - RISAT-1A
- PSLV - HRSAT (3 s/c)
- GSLV MkIII - GSAT-22
- PSLV - RISAT-2A
piggybacked on PSLV: HYSIS
2020
Q1 - PSLV - Oceansat-3A
March - PSLV - Cartosat-3B
Q2 - PSLV - Resourcesat-3S
Q2 - PSLV - Resourcesat-3
- PSLV - EnMap (Germany)
- PSLV? - MOM-2
- GSLV - GISAT-1A
- PSLV XL - Aditiya-1
2021
Q2 - PSLV - Resourcesat-3SA
Q2 - PSLV - Resourcesat-3A
- GSLV - NISAR (NASA-ISRO SAR sat)
2022
Q1 - PSLV - Resourcesat-3B
- GSLV - Insat-3DS
>2024
- GSLV MkIII - First manned mission
updated February 3
updated February 8
updated February 23
updated February 25
-
#1403
by
input~2
on 27 Jan, 2018 08:06
-
-
#1404
by
vineethgk
on 03 Feb, 2018 03:31
-
A new SSTL-S1 Satellite EO Data Contract Signed Between SSTL and 21ATSurrey Satellite Technology Ltd. (SSTL) has signed a £25M contract in Beijing with Twenty First Century Aerospace Technology Co., Ltd. (21AT) to provide data from a new Earth Observation (EO) satellite (SSTL-S1) that is due for launch via an ISRO PSLV launch vehicle mid-year.
-
#1405
by
vineethgk
on 05 Feb, 2018 01:19
-
ISRO Chief hints that Chandrayaan-II could be delayed a bit, with GSLV MkIII D2 happening prior to that.
http://www.thehindu.com/sci-tech/science/isro-needs-4-years-to-catch-up-with-satellite-demand-dr-sivan/article22651083.eceAs a part of the three-year short-term action plan, immediate missions that we plan to do this year are the GSLV-F08 that will launch the GSAT-6A communication satellite [around February]. Then we will have a PSLV mission with navigation satellite IRNSS-1I. Then comes the second developmental flight D2 of GSLV-MkIII. It will launch the high throughput satellite GSAT-29. Later, GSAT-11, which will be our heaviest satellite as of now, will be launched from Kourou. The Chandrayaan-2 mission will be launched this year on another GSLV.
-
#1406
by
input~2
on 08 Feb, 2018 10:17
-
-
#1407
by
vineethgk
on 23 Feb, 2018 01:35
-
GSAT-6A launch delayed to last week of March
Source
-
#1408
by
vineethgk
on 25 Feb, 2018 12:17
-
IRNSS-1I launch delayed to April
Source
-
#1409
by
input~2
on 25 Feb, 2018 12:56
-
-
#1410
by
K210
on 26 Feb, 2018 00:38
-
-
#1411
by
zubenelgenubi
on 13 Mar, 2018 13:59
-
GSAT-6A, launching on GSLV Mk. II, SLP
Launch is set for 24th March. GS1 (1st stage) and GS2 (2nd stage) integration have been completed. Cryogenic upper stage has been shipped to launch site and GSAT-6A is fully assembled undergoing final stages of testing.
Article (Telugu): http://andhrabhoomi.net/content/nation-6342
Or
https://twitter.com/rachanareddym/status/969412501577355264
report from twitter on 29 march
GSAT-20, launching on GSLV Mk. III, also from SLP
Launch is targeted for May.
The 5,725-kg satellite, which will carry 40 transponders in the Ku-band and Kaband frequencies, is capable of “providing high bandwidth connectivity” with up to 14 gigabit per second (gbps) data transfer speed. “We will launch Gsat-11 from the European spaceport as it’s a fivetonne satellite. Around the same time in May, Isro will launch Gsat-29 through our GSLV Mk III rocket from Sriharikota. We also plan to launch Gsat-20 from India by next year,” the Isro chief said.
Source: https://epaper.timesgroup.com/Olive/ODN/TimesOfIndia/shared/ShowArticle.aspx?doc=TOIM%2F2018%2F02%2F26&entity=Ar01116&sk=3163C87C&mode=text
I think that this means that
Chandrayaan-2 won't launch from the SLP until AFTER these two flights? Notwithstanding any delays internal to the
Chandrayaan-2 program?
Do the
GSAT-6A and
GSAT-20 launches have the priority?
Chandrayaan-II likely delayed to October
India’s second mission to the moon, Chandrayaan-2, is likely to be launched only in October. Further delays cannot be ruled out if systems are not yet in place by then.
An Isro official told TOIseveral tests have to be done and arrangements need to be made.
The original plan envisaged the launch between April and November with the real target focussed for April. Top Isro officials had expressed confidence that the takeoff will happen in April.
But on Friday, it was stated the lunar mission was not yet ready for an April lift-off and much still needs to be done.
Source
-
#1412
by
input~2
on 14 Mar, 2018 08:06
-
Launch performed in 2018
January 12 03:59 UTC- PSLV C40 (FLP) - Cartosat-2F- INS-1C - Microsat - Telesat LEO-1- Carbonite-2 +26 Nanosats
March 29 11:26 UTC- GSLV F-08 (SLP) - GSAT-6A
Tentative launch schedule
2018
NET mid-April 12 11 22:34 UTC - PSLV-XL-C41(FLP) - IRNSS-1I
[May - PSLV-C42 (FLP) - tbd] tbd
NET June - GSLV Mk III D2 (SLP) - GSAT-29
April or October- GSLV F10 (SLP) - Chandrayaan-2
- PSLV - Cartosat-3
- PSLV - Oceansat-3
- GSLV F12 - GSAT-7A
piggybacked on PSLV : IMS(Indian Mini Satellite)/Atmos, IMS-1E, IMS-1F, IinuSat, IMS-B, NEMO-AM (FY 2018-19), PlanetiQ-1, PlanetiQ-2, InnoSat-2 (Malaysia)
May 18 - Ariane 5 - GSAT-11
2019
Q2 - PSLV - Cartosat-3A
Q2 - GSLV - GISAT (GEO Imaging SATellite)
Q2 - PSLV - RISAT-1A
- PSLV - HRSAT (3 s/c)
- GSLV MkIII D3 - GSAT-22
- PSLV - RISAT-2A
piggybacked on PSLV: HYSIS
2020
Q1 - PSLV - Oceansat-3A
March - PSLV - Cartosat-3B
Q2 - PSLV - Resourcesat-3S
Q2 - PSLV - Resourcesat-3
- PSLV - EnMap (Germany)
- PSLV? - MOM-2
- GSLV - GISAT-1A
- GSLV MkIII F01 - GSAT-20
- PSLV XL - Aditiya-1
2021
Q2 - PSLV - Resourcesat-3SA
Q2 - PSLV - Resourcesat-3A
December - GSLV - NISAR (NASA-ISRO SAR sat)
2022
Q1 - PSLV - Resourcesat-3B
- GSLV - Insat-3DS
>2024
- GSLV MkIII - First manned mission
updated March 21
updated March 23
updated March 29
updated March 31
updated April 6
-
#1413
by
gongora
on 21 Mar, 2018 13:35
-
BlackSky will have a satellite on two PSLV launches.
-
#1414
by
starbase
on 23 Mar, 2018 13:26
-
-
#1415
by
vineethgk
on 23 Mar, 2018 13:28
-
Official confirmation that Chandrayaan-II has been delayed to October.
Source
-
#1416
by
TheVarun
on 24 Mar, 2018 12:35
-
Are the other scheduled launches, of GSLV Mark 3 with GSAT-29, a second GSLV Mark 2 with GSAT 7, plus PSLV missions with Oceansat-3 and Risat-1A, all on course?
-
#1417
by
K210
on 26 Mar, 2018 12:16
-
-
#1418
by
K210
on 26 Mar, 2018 12:18
-
Are the other scheduled launches, of GSLV Mark 3 with GSAT-29, a second GSLV Mark 2 with GSAT 7, plus PSLV missions with Oceansat-3 and Risat-1A, all on course?
From what i know GSLV MK-3 with GSAT-29 is still on track for june-july launch. There will be a second GSLV MK-2 launch this year but it will carry Chandraayan-2 not GSAT-7A. GSAT-7A is set for launch sometime next year.
As for PSLV isro has been very quiet on missions beyond C41 so no clue.
-
#1419
by
TheVarun
on 26 Mar, 2018 13:19
-
GSAT-11 dispatched from isro satellite center to ariane launch pad.
Source: https://www.isac.gov.in/flagoff-gsat-11.jsp
Eagerly awaiting this launch, the largest Indian made satellite. 5 tonnes, almost as compelling as a PSLV or GSLV launch. May be historic in the sense that it is possibly the last Indian satellite to be sent up by Arianespace.