#620
by
DaveS
on 16 Jan, 2008 23:46
-
Preliminary STS-122/1E NASA TV coverage items:
February 4, Monday
10 a.m. - STS-122 Countdown Status Briefing - KSC (Public and Media Channels)
1 p.m. - NASA Administrator's Budget Briefing - HQ (Public and Media Channels)
2:30 p.m. - Replay of STS-122 Crew Arrival - KSC (Public and Media Channels)
Feb. 5, Tuesday
10 a.m. - STS-122 Countdown Status Briefing - KSC (Public and Media Channels)
4 p.m. - STS-122 Launch Readiness News Conference - KSC (Public and Media Channels)
Feb. 6, Wednesday
10 a.m. - STS-122 Countdown Status Briefing - KSC (Public and Media Channel)
1 p.m. - ESA Columbus Module Briefing - KSC (Public and Media Channel)
Feb. 7, Thursday
5:30 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)
-
#621
by
ChrisGebhardt
on 17 Jan, 2008 04:23
-
According to Bill's launch windows chart, Feb 8 is a FD-4 rendezvous only. Does this mean that they won't attempt a launch that day because of the limited consumables onboard Atlantis and the desire to get those extra days on orbit for the SARJ inspection?
-
#622
by
Chris Bergin
on 17 Jan, 2008 06:53
-
We might get some good additional data today, given it's the next big PRCB.
-
#623
by
Chris Bergin
on 17 Jan, 2008 18:03
-
Everything looking great as per today's PRCB. Have an article to come (sorry for the delay, working on a major story at the same time).
-
#624
by
Chris Bergin
on 17 Jan, 2008 19:46
-
-
#625
by
AntiKev
on 17 Jan, 2008 21:14
-
Chris Bergin - 17/1/2008 2:03 PM
(sorry for the delay, working on a major story at the same time).
Does the major story have to do with Constellation or the SARJ? Or something different?
-
#626
by
Flightstar
on 17 Jan, 2008 21:41
-
Constellation
-
#627
by
AntiKev
on 17 Jan, 2008 21:43
-
That's why I need to get L2.
-
#628
by
ShuttleFan75
on 17 Jan, 2008 23:59
-
-
#629
by
Chris Bergin
on 18 Jan, 2008 03:29
-
-
#630
by
Andy USA
on 18 Jan, 2008 21:01
-
-
#631
by
Chris Bergin
on 18 Jan, 2008 22:12
-
-
#632
by
ChrisC
on 19 Jan, 2008 04:14
-
The schedule laid out a couple weeks ago said that they would make a go/nogo decision by Jan 21st as to whether they would be doing a tanking test. That was going to determine whether they aimed for a Feb 2nd launch (no to test) or a Feb 8th launch (yes to test). Of course, more recently they've consulted with their "Russian friends" and determined that they will launch NET Feb 7th to stay out of the way of a Progress launch.
So, does this mean that they will do a tanking test? I'm aware that doing a tanking isn't free (you use up another cycle on the foam design life). Has there been a decision made already on this, either way, or are we still waiting on Monday for that decision?
Prior to the MSFC results it was deemed "very likely", but more recently it seemed like they were developing rational to skip the test.
-
#633
by
Chris Bergin
on 19 Jan, 2008 08:51
-
That's correct. However, as we've reported, they've already decided against a tanking test.
The decision was based on benefit of the test vs putting the tank through another cryo cycles (potential of TPS foam cracking).
-
#634
by
jacqmans
on 19 Jan, 2008 09:01
-
Mission: STS-122 - 24th International Space Station Flight - Columbus
laboratory
Vehicle: Atlantis (OV-104)
Location: Launch Pad 39A
Launch Date: Targeting Feb. 7
Crew: Frick, Poindexter, Schlegel, Eyharts, Love, Melvin, Walheim
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles
Launch Pad 39A
- Engine cutoff (ECO) sensor external feedthrough connector
installation is complete
- Aft ECO instrumentation wiring removal and retest was completed
- All sensors have been tested successfully
- ECO sensor feedthrough foaming work on the external J-Box and solid
rocket booster PAL ramp continues through the weekend
- Annual slidewire basket pad evacuation system maintenance and
checkout continues through the weekend
- Solid rocket booster hydraulic retesting was completed Monday
- Liquid oxygen storage tank pressurization and relief valve testing
was successfully completed Tuesday
-
#635
by
jok
on 19 Jan, 2008 09:02
-
http://i4.tinypic.com/82ucitz.gif" width="320" border="0" />
spraying BX-265
-
#636
by
Chris Bergin
on 19 Jan, 2008 09:06
-
Superb Jok!! :cool:
-
#637
by
dsmillman
on 19 Jan, 2008 12:15
-
The KSC shuttle status is mentioning troubleshooting on Fuel Cell #2 (IPR 0113). Do we have any information on this?
-
#638
by
DaveS
on 19 Jan, 2008 13:35
-
dsmillman - 19/1/2008 7:15 AM
The KSC shuttle status is mentioning troubleshooting on Fuel Cell #2 (IPR 0113). Do we have any information on this?
And for the L2 status reports: We don't get them during the weekends, so we're kinda in the dark right now.
-
#639
by
STSFan10
on 19 Jan, 2008 17:58
-
dsmillman - 19/1/2008 7:15 AM
The KSC shuttle status is mentioning troubleshooting on Fuel Cell #2 (IPR 0113). Do we have any information on this?
What page is that? URL?