« Reply #180 on: 03/21/2008 08:55 pm »
Quote
Chris Bergin - 19/3/2008  5:21 PM

Quote
10W29 - 20/3/2008  9:03 PM

ET-127 is the LON (STS-326) tank for STS-124, not ET-129.

That is what I orginally thought, but according to the FAWG. ET-129 with Endeavour - and she's got STS-326:

(ET-127 with STS-125 and does not have a LON mission).

Or maybe I'm going mad, but I'm specifically told the ET issue relates directly to STS-124 onwards.


Very good information for me.
ET-127 with STS-125 and does not have a LON mission, because STS-125 does not have ODS.
Can't support the ISS LON mission.

Offline Chris Bergin

RE: STS-124 Processing Latest
« Reply #181 on: 03/21/2008 09:06 pm »
Quote
Fuji - 21/3/2008  9:55 PM

Quote
Chris Bergin - 19/3/2008  5:21 PM

Quote
10W29 - 20/3/2008  9:03 PM

ET-127 is the LON (STS-326) tank for STS-124, not ET-129.

That is what I orginally thought, but according to the FAWG. ET-129 with Endeavour - and she's got STS-326:

(ET-127 with STS-125 and does not have a LON mission).

Or maybe I'm going mad, but I'm specifically told the ET issue relates directly to STS-124 onwards.


Very good information for me.
ET-127 with STS-125 and does not have a LON mission, because STS-125 does not have ODS.
Can't support the ISS LON mission.


Correct, but 10W29 is right with the way the flow works for the stacks (minus the orbiter) - upon checking the Ground Ops Documents on L2. I was going on the FAWG manifest. (Doesn't change the situation as it's not one tank specific).

I.e. If the launch dates are in the right alignment with the processing flows, and STS-124 was thrown into safe haven at the ISS. ET-127, stacked in the VAB for 125, becomes the nearest tank, so - in an emergancy - they would stack Endeavour with ET-127 (which is not the plan for STS-126) and launch LON that way.

Complicated I know!
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

RE: STS-124 Processing Latest
« Reply #182 on: 03/24/2008 02:03 pm »
http://www.nasaspaceflight.com/content/?cid=5388 - Shannon is continuing to push for May, but MAF meeting will decide next week. Mitigation involves boosting CSCS.

Note, the issue at MAF is NOT just "sheer amount of work" though related. The reason for the sheer amount of work is the actual issue. We'll report that when MAF/Lockheed give us permission to use documentation.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Analyst

  • Senior Member
  • *****
  • Posts: 3337
  • Liked: 4
  • Likes Given: 21
RE: STS-124 Processing Latest
« Reply #183 on: 03/24/2008 02:56 pm »
Quote
Chris Bergin - 24/3/2008  5:03 PM

.. is the actual issue.

Do we know anything about this "issue". Or can't you report this?

Analyst

Offline Chris Bergin

RE: STS-124 Processing Latest
« Reply #184 on: 03/24/2008 03:25 pm »
Quote
Analyst - 24/3/2008  3:56 PM

Quote
Chris Bergin - 24/3/2008  5:03 PM

.. is the actual issue.

Do we know anything about this "issue". Or can't you report this?

Analyst

Not yet.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline ChrisGebhardt

  • Assistant Managing Editor
  • Senior Member
  • *****
  • Posts: 7842
  • ad astra scientia
  • ~1 AU
  • Liked: 7877
  • Likes Given: 853
Re: STS-124 Processing Latest
« Reply #185 on: 03/24/2008 06:30 pm »
With Shannon pushing for May still, can it be assumed then that this issue does not pertain to Discovery's tank... just the tanks down stream?  Or am I way off base here?

Thanks.

Offline psloss

  • Veteran armchair spectator
  • Senior Member
  • *****
  • Posts: 17992
  • Liked: 4065
  • Likes Given: 2111
Re: STS-124 Processing Latest
« Reply #186 on: 03/24/2008 06:49 pm »
Leroy Cain was asked about the tanks during today's STS-123 briefing after the shuttle MMT...he says that they'll process the 124 hardware and go down to the FRR in mid-May and set a launch date.

Offline psloss

  • Veteran armchair spectator
  • Senior Member
  • *****
  • Posts: 17992
  • Liked: 4065
  • Likes Given: 2111
Re: STS-124 Processing Latest
« Reply #187 on: 03/24/2008 06:52 pm »
Quote
psloss - 24/3/2008  3:49 PM

Leroy Cain was asked about the tanks during today's STS-123 briefing after the shuttle MMT...he says that they'll process the 124 hardware and go down to the FRR in mid-May and set a launch date.
He also mentioned a couple of areas on the tanks in general that are in discussion...if I heard it correctly, one was an intertank to LO2 tank flange (???) and one was I think a closeout on an aft longeron...

Offline psloss

  • Veteran armchair spectator
  • Senior Member
  • *****
  • Posts: 17992
  • Liked: 4065
  • Likes Given: 2111
Re: STS-124 Processing Latest
« Reply #188 on: 03/24/2008 06:57 pm »
Quote
psloss - 24/3/2008  3:49 PM

Leroy Cain was asked about the tanks during today's STS-123 briefing after the shuttle MMT...he says that they'll process the 124 hardware and go down to the FRR in mid-May and set a launch date.
Just asked specifically about the LON tank vs. CSCS, and he said he doesn't anticipate a delay to STS-124 based on the LON tank schedule.

Offline Bubbinski

Re: STS-124 Processing Latest
« Reply #189 on: 03/24/2008 07:47 pm »
That's good news.  If they launch on May 25, with 3 month CSCS, then I would assume ET-127 delivery by late July/early August, to support a LON launch in late August, would this be correct?
I'll even excitedly look forward to "flags and footprints" and suborbital missions. Just fly...somewhere.

Offline psloss

  • Veteran armchair spectator
  • Senior Member
  • *****
  • Posts: 17992
  • Liked: 4065
  • Likes Given: 2111
Re: STS-124 Processing Latest
« Reply #190 on: 03/24/2008 08:00 pm »
Quote
Bubbinski - 24/3/2008  4:47 PM

That's good news.  If they launch on May 25, with 3 month CSCS, then I would assume ET-127 delivery by late July/early August, to support a LON launch in late August, would this be correct?
Not sure.  I haven't seen any of those numbers.  If they press ahead to the FRR, we'd probably have a good idea then (mid-May or thereabouts).  And in between, I'm sure Chris will have many updates.

Offline Chris Bergin

RE: STS-124 Processing Latest
« Reply #191 on: 03/25/2008 09:46 pm »
SSP make an opening realignment to May 29 NET.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline faustod

  • Full Member
  • ***
  • Posts: 323
  • Italy
  • Liked: 0
  • Likes Given: 0
Re: STS-124 Processing Latest
« Reply #192 on: 03/26/2008 11:47 am »
Can anyone confirm the arrival of ET-128 at the Kennedy Space Center?

Offline psloss

  • Veteran armchair spectator
  • Senior Member
  • *****
  • Posts: 17992
  • Liked: 4065
  • Likes Given: 2111
Re: STS-124 Processing Latest
« Reply #193 on: 03/26/2008 11:52 am »
Quote
faustod - 26/3/2008  8:47 AM

Can anyone confirm the arrival of ET-128 at the Kennedy Space Center?
I think this is a strong implication of its impending arrival:

Offline psloss

  • Veteran armchair spectator
  • Senior Member
  • *****
  • Posts: 17992
  • Liked: 4065
  • Likes Given: 2111
RE: STS-124 Processing Latest
« Reply #194 on: 03/26/2008 01:24 pm »
Tank barge now almost there...


Offline faustod

  • Full Member
  • ***
  • Posts: 323
  • Italy
  • Liked: 0
  • Likes Given: 0
RE: STS-124 Processing Latest
« Reply #195 on: 03/26/2008 01:36 pm »
Quote
psloss - 26/3/2008  9:24 AM

Tank barge now almost there...


Thanks for the good news!

Offline Lawntonlookirs

  • Veteran
  • Full Member
  • ****
  • Posts: 1418
  • Liked: 0
  • Likes Given: 0
Re: STS-124 Processing Latest
« Reply #196 on: 03/26/2008 02:47 pm »
The barge has arrived at KSC.
Everyman is my superior in that I may learn from him.  Albert Einstein

Offline Lawntonlookirs

  • Veteran
  • Full Member
  • ****
  • Posts: 1418
  • Liked: 0
  • Likes Given: 0
Re: STS-124 Processing Latest
« Reply #197 on: 03/26/2008 03:34 pm »
ET 128 Starting to move
Everyman is my superior in that I may learn from him.  Albert Einstein

Offline Lawntonlookirs

  • Veteran
  • Full Member
  • ****
  • Posts: 1418
  • Liked: 0
  • Likes Given: 0
Re: STS-124 Processing Latest
« Reply #198 on: 03/26/2008 03:36 pm »
Appears to have stopped for a while.  Maybe it got stuck. :laugh:
Everyman is my superior in that I may learn from him.  Albert Einstein

Offline Lawntonlookirs

  • Veteran
  • Full Member
  • ****
  • Posts: 1418
  • Liked: 0
  • Likes Given: 0
Re: STS-124 Processing Latest
« Reply #199 on: 03/26/2008 03:45 pm »
Cleared the barge and now to the VAB.
Everyman is my superior in that I may learn from him.  Albert Einstein

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0