"That looks ugly"
Sure does.
In some angles, the broken and twisted cells are obvious.
Scott saying a big piece of wire may be floating around after the cutting.
rdale - 3/11/2007 2:37 PM Did EV2 get any of the get-ahead tasks taken care of before SAW work started?
No, I think those were to be done, if time permitted, after the repairs (if you're referring to the PDGF and handrails in Harmony) Anyways, they went straight towards the SAW tasks.
The panels really jumped back to their usual position when he cut the wire.
He just bent the hinge wire to a 90º position.