05.02.2008 Baikonur: Work according to the program "ground-based start"
http://www.roscosmos.ru/NewsDoSele.asp?NEWSID=2856 At the spaceport Baikonur continues the work according to the program "ground-based start". Program provides for conducting it is starting space rocket "zenith -.3SLB" ("zenith -3M").
From RN "the zenith -2" given carrier rocket is characterized by the new numerical systems of control and on-board computer, and also use of a starting block "DM -.SLB" as the third of step RN. This modification they make it possible to place communication satellites in geostationary orbit.
The autonomous checkings of space head part were completed on the past week, after which it was transported on area ? 42 into the assembly and testing housing of the preparation of carrier rocket.
Today calculations BY FKTS "Baikonur", KB of transport machine building, RKK "energy" of the name Of s.P.Koroleva "and of other enterprises began docking operations of space head part with the carrier rocket.
After the completion of jointing and joint reviews, the space rocket "zenith -.3SLB" with the starting block "DM -.SLB" will be exported to the launching system of the area of ?yashch for conducting of fitting, finalizing of the cyclogram of launch preparation (including of servicing starting block with propellant components).
After the completion of works according to the program of the technological of removal, rocket it is returned to the assembly housing, and the calculations of space branch will approach the direct preparation for the first launching RN "zenith -.3SLB" from the spaceport Baikonur.
The launch of space rocket "zenith -.3SLB" with the starting block "DM -.SLB" as the third step and by the Israeli telecommunication satellite AMOS 3 is planned to the spring 2008.