Re: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #240 on: 10/28/2007 02:35 pm »
Had to step out.  Was the PDGF install fully completed?

Offline eeergo

Re: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #241 on: 10/28/2007 02:37 pm »
Making a pull test of the PDGF, so I assume the installation was fully completed.
-DaviD-

Offline eeergo

RE: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #242 on: 10/28/2007 02:37 pm »
Beautiful shot of the ingress:
-DaviD-

Offline Avron

  • Canadian Member
  • Senior Member
  • *****
  • Posts: 4930
  • Liked: 156
  • Likes Given: 160
RE: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #243 on: 10/28/2007 02:37 pm »
Not great lighting back at the airlock

Offline dawei

  • Member
  • Full Member
  • ****
  • Posts: 974
  • Liked: 51
  • Likes Given: 237
Re: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #244 on: 10/28/2007 02:39 pm »
Quote
eeergo - 29/10/2007  12:37 AM

Making a pull test of the PDGF, so I assume the installation was fully completed.

Thanks!  Anybody with a list of uncompleted tasks?  Missed enough that I couldn't check everything off accurately.

Seems like they did pretty good today given the additions and the struggles with the MBSU.

Offline jarthur

  • Member
  • Full Member
  • *
  • Posts: 117
  • Liked: 0
  • Likes Given: 0
Re: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #245 on: 10/28/2007 02:39 pm »
With the exception of the RPCM R&R, what were they not able to accomplish?

Offline eeergo

Re: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #246 on: 10/28/2007 02:41 pm »
I was making myself the same question about the unfinished tasks. I wasn't paying many attention to the Node outfitting, but some of the sub-tasks there included were surely not completed: gap spanners, trunnion covers, and removal of CBM pip pins and petal restraints.

RPCM R&R wans't completed either, but that was more or less expected.
-DaviD-

Offline Avron

  • Canadian Member
  • Senior Member
  • *****
  • Posts: 4930
  • Liked: 156
  • Likes Given: 160
Re: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #247 on: 10/28/2007 02:41 pm »
Quote
dawei - 28/10/2007  11:39 AM

Quote
eeergo - 29/10/2007  12:37 AM

Making a pull test of the PDGF, so I assume the installation was fully completed.

Thanks!  Anybody with a list of uncompleted tasks?  Missed enough that I couldn't check everything off accurately.

Seems like they did pretty good today given the additions and the struggles with the MBSU.

What happened with the ca belling to the PDGF?

Offline ShuttleDiscovery

  • NASA's first teenage astronaut
  • Senior Member
  • *****
  • Posts: 2125
  • UK
    • Shuttle Discovery's Space Page
  • Liked: 0
  • Likes Given: 0
Re: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #248 on: 10/28/2007 02:42 pm »
It's like a maze getting back to the airlock!

Offline eeergo

RE: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #249 on: 10/28/2007 02:43 pm »

Z1 without anything on top after so many years!

"Looking forward to T-RAD! Should be a great experiment!"

-DaviD-

Offline Avron

  • Canadian Member
  • Senior Member
  • *****
  • Posts: 4930
  • Liked: 156
  • Likes Given: 160
Re: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #250 on: 10/28/2007 02:44 pm »
Quote
ShuttleDiscovery - 28/10/2007  11:42 AM

It's like a maze getting back to the airlock!

Offline Avron

  • Canadian Member
  • Senior Member
  • *****
  • Posts: 4930
  • Liked: 156
  • Likes Given: 160
RE: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #251 on: 10/28/2007 02:45 pm »

Offline eeergo

Re: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #252 on: 10/28/2007 02:46 pm »

It's wonderful to see the complexity and size the Station is getting! What a great accomplishment we're building, little by little.

Sightseeing the US from 350 miles high :)

-DaviD-

Offline dawei

  • Member
  • Full Member
  • ****
  • Posts: 974
  • Liked: 51
  • Likes Given: 237
Re: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #253 on: 10/28/2007 02:47 pm »
"too bad about those Cubbies."   "there is always next century."

Offline jarthur

  • Member
  • Full Member
  • *
  • Posts: 117
  • Liked: 0
  • Likes Given: 0
Re: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #254 on: 10/28/2007 02:48 pm »
Quote
eeergo - 28/10/2007  9:41 AM

I was making myself the same question about the unfinished tasks. I wasn't paying many attention to the Node outfitting, but some of the sub-tasks there included were surely not completed: gap spanners, trunnion covers, and removal of CBM pip pins and petal restraints.

RPCM R&R wans't completed either, but that was more or less expected.

I disagree, I am 99% sure they got the gap spanners, trunnion covers and CBM pip pins (the aft one was the last one to get, and houston has Scott do it after the PDGF was finished). I am not sure about the petal restraints though.

Offline Avron

  • Canadian Member
  • Senior Member
  • *****
  • Posts: 4930
  • Liked: 156
  • Likes Given: 160
RE: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #255 on: 10/28/2007 02:49 pm »
Headstands at the airlock

Offline Wisi

  • Veteran
  • Full Member
  • ***
  • Posts: 310
  • Liked: 0
  • Likes Given: 1
Re: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #256 on: 10/28/2007 02:49 pm »
Quote
jarthur - 28/10/2007  5:39 PM

With the exception of the RPCM R&R, what were they not able to accomplish?

Per SpaceFlightNow.com:

"Replacement of a faulty circuit breaker and electrically hooking up the new robot arm grapple base will be pushed off to an EVA on another day."

Offline eeergo

Re: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #257 on: 10/28/2007 02:50 pm »

Quote
jarthur - 28/10/2007 5:48 PM

Quote
eeergo - 28/10/2007 9:41 AM

I was making myself the same question about the unfinished tasks. I wasn't paying many attention to the Node outfitting, but some of the sub-tasks there included were surely not completed: gap spanners, trunnion covers, and removal of CBM pip pins and petal restraints. RPCM R&R wans't completed either, but that was more or less expected.

I disagree, I am 99% sure they got the gap spanners, trunnion covers and CBM pip pins (the aft one was the last one to get, and houston has Scott do it after the PDGF was finished). I am not sure about the petal restraints though.

You're probably right; as I said I wasn't paying much attention at that time (I was having lunch! :laugh: ) Not a big deal of unfinished tasks, in any case.

-DaviD-

Offline Avron

  • Canadian Member
  • Senior Member
  • *****
  • Posts: 4930
  • Liked: 156
  • Likes Given: 160
Re: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #258 on: 10/28/2007 02:51 pm »
Quote
Wisi - 28/10/2007  11:49 AM

Quote
jarthur - 28/10/2007  5:39 PM

With the exception of the RPCM R&R, what were they not able to accomplish?

Per SpaceFlightNow.com:

"Replacement of a faulty circuit breaker and electrically hooking up the new robot arm grapple base will be pushed off to an EVA on another day."

Thanks.. so the PDGF is not operational yet

Offline Avron

  • Canadian Member
  • Senior Member
  • *****
  • Posts: 4930
  • Liked: 156
  • Likes Given: 160
RE: LIVE: STS-120 Flight Day 6 - EVA-2
« Reply #259 on: 10/28/2007 02:52 pm »
Getting back in ... 6h 20 secs

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0