I've had a brain fart, but given this thread will cover it as much as we get coverage, what date is the IDA-2 removal ops set for?

Offline miki

  • Member
  • Posts: 14
  • Serbia
  • Liked: 24
  • Likes Given: 8
I believe removal is planned for August 16th, followed by EVA (Jeff and Kate) on August 18th.

Offline russianhalo117

  • Senior Member
  • *****
  • Posts: 5043
  • AR USA / Berlin, DE / Moscow, RF
  • Liked: 1387
  • Likes Given: 599
I believe removal is planned for August 16th, followed by EVA (Jeff and Kate) on August 18th.
Beginning of August 16th GMT is EVR Ops start and August 17th is the EVR backup date incase of any SSRMS/SPDM issues. Some issues that have popped up over the last several EVR events have resulted in the EVR activities being moved to the left to allow for the additional EVR day. Previously it was stated that the PMA-2 power-up and systems checkout is to occur the day before the EVR and will be powered up again before the start of the EVA.

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 3961
  • near hangar 18
  • Liked: 1053
  • Likes Given: 513
The end effector camera on the SSRMS appears to be doing a survey of PMA-2 to verify it's condition after years of leading the ISS through space without any use since the retirement of the Shuttle.
« Last Edit: 07/27/2016 04:15 pm by Targeteer »
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 3961
  • near hangar 18
  • Liked: 1053
  • Likes Given: 513
The SSRMS is headed back to Dragon