Author Topic: LIVE: SCATSat-1/Alsat-2B - PSLV C35 - September 26, 2016 (03:42 UTC)  (Read 59181 times)

Offline sanjaykumar

  • Member
  • Posts: 70
  • USA
  • Liked: 9
  • Likes Given: 8

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19592
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7455
  • Likes Given: 997
Coverage has started.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19592
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7455
  • Likes Given: 997
Our commentators.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19592
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7455
  • Likes Given: 997
About four minutes to engine start.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online ZachS09

Briefly discussing the secondary payloads.
This is Recovery; the center core has landed. All landing operators, proceed to Procedure 11.000 on ECRY and ECF9 Net.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19592
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7455
  • Likes Given: 997
T+2 hours 10 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online ZachS09

T+2 hours, 11 minutes, 47 seconds.

Fourth stage has restarted again. This last burn will be 19.44 seconds long.
This is Recovery; the center core has landed. All landing operators, proceed to Procedure 11.000 on ECRY and ECF9 Net.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19592
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7455
  • Likes Given: 997
T+2 hours 11 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online ZachS09

T+2 hours, 12 minutes, 6 seconds.

Fourth stage shutdown confirmed. Powered flight is complete.
This is Recovery; the center core has landed. All landing operators, proceed to Procedure 11.000 on ECRY and ECF9 Net.

Online ZachS09

T+2 hours, 12 minutes, 43 seconds.

The Dual Launch Adapter has been jettisoned. Standing by for the seven secondary payloads to jettison.
This is Recovery; the center core has landed. All landing operators, proceed to Procedure 11.000 on ECRY and ECF9 Net.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19592
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7455
  • Likes Given: 997
PS4 3rd ignition.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online ZachS09

We have one breakwire and AlSat-Nano separation.

We have another breakwire and CanX 7 separation.
This is Recovery; the center core has landed. All landing operators, proceed to Procedure 11.000 on ECRY and ECF9 Net.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19592
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7455
  • Likes Given: 997
T+2 hours 13 minutes. First two sats away!
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19592
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7455
  • Likes Given: 997
T+2 hours 14 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19592
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7455
  • Likes Given: 997
Next three sats separated.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19592
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7455
  • Likes Given: 997
Pathfinder 1 separated. Mission success!
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online ZachS09

Pratham, PISat, AlSat 2B, AlSat 1B, and BlackSky Pathfinder 1 have all been jettisoned. Thanks to successful breakwires.

Congrats to ISRO, ASAL, BlackSky Global, IIT Bombay, the Crucible of Research and Innovation Laboratory of PESIT, the UK Space Agency, and UTIAS on the successful execution of PSLV C35's 2.25-hour long ride into polar orbit.
This is Recovery; the center core has landed. All landing operators, proceed to Procedure 11.000 on ECRY and ECF9 Net.

Online ZachS09

A.S. Kiran Kumar now giving a post-launch speech.
This is Recovery; the center core has landed. All landing operators, proceed to Procedure 11.000 on ECRY and ECF9 Net.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19592
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7455
  • Likes Given: 997
All separation times. Satellite plot. ISRO chairman.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online ZachS09

Dr. K. Sivan now giving a few words.
This is Recovery; the center core has landed. All landing operators, proceed to Procedure 11.000 on ECRY and ECF9 Net.

Tags: