NASASpaceFlight.com Forum
International Space Station (ISS) => ISS Section => Topic started by: Chris Bergin on 08/18/2011 10:39 pm
-
ISS Managers Conduct Expedition 29 FRR, Prepare Station for Post-Shuttle Ops:
http://www.nasaspaceflight.com/2011/08/iss-managers-expedition-29-frr-prepare-station-post-shuttle-operations/
Superb article by Pete Harding via ISS presentations and Increment 29, Soyuz 26/28 FRR Presentations (August 17) available on L2.
-
Awesome job Pete. Impressed!
-
Another great article Pete.
I figured I'd highlight this one specific note: “Take away: The elephant is still in the room. If there are major problems with the X2_R10 (EPIC) MDM upgrade resulting in rollback to X2_R9, there could be a large effort rebuilding production to support the SpaceX Demo and Orbital Demo missions” concluded the presentation."
And this one is missing a bit of context (not sure if we want to pull the reason from L2 or not, we were given a valid reason): "The transition will include a 7 day “dwell” in a “mixed configuration” of EPIC and non-EPIC C&C and GNC MDMs, in order to buy more time for problem solving in the event that the EPIC cards present issues."
Another important note: "The plan to ground-control all VV robotics was detailed in a recent Canadian Joint Operations Panel (CJOP) presentation, available to download on L2."
-
Wonderful article Pete. You really are Mr ISS :)
-
Always look forward to your articles on the ISS, Pete. Wasn't disappointed by this one. Great work.
-
Thanks for the compliments Phil, Robert, Martin and Peter. Much appreciated!
(And BTW Peter, shouldn't you change your location to "HEOMD" now?) ;)
-
(And BTW Peter, shouldn't you change your location to "HEOMD" now?) ;)
I "should"...........
;)