NASASpaceFlight.com Forum
NASA Shuttle Specific Sections => Atlantis (Post STS-135, T&R) => Topic started by: Chris Bergin on 01/27/2006 03:37 pm
-
ET-118 in Horizontal Final Assembly, Position 1
Developmental Flight Instrumentation (DFI)
Currently working engineering for LH2 and LO2 DFI.
Longeron Closeout R&R
Preparations for longeron proficiency sprays continue. ET-118 surface preps continue.
PAL Ramp
Removal of LH2 PAL ramp completed week of 1/16. Completed zone layout for the LO2 PAL ramp removal.