NASA Shuttle Specific Sections => Atlantis (Post STS-135, T&R) => Topic started by: Chris Bergin on 01/27/2006 03:37 pm

Title: ET-118 latest
Post by: Chris Bergin on 01/27/2006 03:37 pm
ET-118 in Horizontal Final Assembly, Position 1

Developmental Flight Instrumentation (DFI)
 Currently working engineering for LH2 and LO2 DFI.
Longeron Closeout R&R
Preparations for longeron proficiency sprays continue.  ET-118 surface preps continue.
PAL Ramp
Removal of LH2 PAL ramp completed week of 1/16. Completed zone layout for the LO2 PAL ramp removal.