[Scheduled to be broadcast] 5/8 14:00~ Press briefing on the development status of the H3 rocket and the H3 rocket No. 6 (30 forms) 1-stage actual tank stage combustion test (CFT)A press briefing on the development status of the H3 rocket and the status of preparations for the launch of the H3 Launch Vehicle No. 6 (Type 30 Test Vehicle), including an overview of the test outline of the H3 Launch Vehicle (Type 30) Tank Stage Combustion Test (CFT), will be live-streamed.(Google Translate from Japanese)
* “BRO-x” (Unseen Labs, France, 8U cubesat)
The Captive Firing Test for the H3 rocket Type 30 test vehicle is being adjusted after the launch of the H-2A rocket F50. The date will be announced as soon as it is decided. #nvslive
@JAXA_en has performed what looks like a nominal Static Fire Test of their H3-30 rocket first stage, as part of the certification process for launch later this year, the 6th overall flight of the H3, and the first in the 3 LE-9 engine configuration. 📹 JAXA
The launch schedule of the 6th H3 Launch Vehicle (Type 30 Test Vehicle) will be announced once confirmed.
This launch is almost certainly going to slip to NET November per the announcement today of HTV-X1 launching on H3 s/n F7 on October 21:QuoteThe launch schedule of the 6th H3 Launch Vehicle (Type 30 Test Vehicle) will be announced once confirmed.
In addition, JAXA plans to launch the sixth H3 rocket without SRBs by March 2026.
In July's CFT, JAXA fund the tank repress was lower than expected. H3-30 will be need another CFT, so launch was slipped 2026.https://www.sankei.com/article/20250929-7E654NF2CZP7XMZOZ6M5BTXRHU/
This is an issue specific to the 3-0 configuration, and will not affect the No. 7 rocket,