Author Topic: EM-2/Artemis 2 Orion Construction and Processing Updates  (Read 74458 times)

Offline whitelancer64

"A first look inside NASA_Orion that will take @astro_reid, @astrovicglover, @astro_christina and @astro_jeremy to the Moon!"

*yeet tweet*

its quite laughable that only a certified tech is allowed to touch what looks like piece of styrofoam protecting the windows. no wonder costs have skyrocketed. inefficiencies like these add up. either simplify the procedures and not need a specialised "window tech" to do a simple removal or design the window to do the same!

It's not styrofoam, they're hard plastic impact panels to prevent any damage to the windows while work is being done to the interior systems. They're attached by screws to the window's frame, which is why only someone certified can remove them - the screws need to be turned at a certain torque to prevent damage to the frame.
"One bit of advice: it is important to view knowledge as sort of a semantic tree -- make sure you understand the fundamental principles, ie the trunk and big branches, before you get into the leaves/details or there is nothing for them to hang on to." - Elon Musk
"There are lies, damned lies, and launch schedules." - Larry J

Online catdlr

  • Member
  • Senior Member
  • *****
  • Posts: 13454
  • Enthusiast since the Redstones
  • Marina del Rey, California, USA
  • Liked: 11167
  • Likes Given: 9061
Re: EM-2/Artemis 2 Orion Construction and Processing Updates
« Reply #81 on: 04/02/2024 09:43 pm »
https://twitter.com/NASASpaceflight/status/1775248553742414301

Quote
NASA is working with Orion spacecraft prime contractor Lockheed Martin to resolve a handful of issues that came up late last year during ground testing, forcing the delay of Artemis II to September 2025.

Philip Sloss overviews:

Article link:  https://www.nasaspaceflight.com/2024/04/resolving-artemis-ii-issues/
It's Tony De La Rosa, ...I don't create this stuff, I just report it.

Offline deltaV

  • Senior Member
  • *****
  • Posts: 2636
  • Change in velocity
  • Liked: 957
  • Likes Given: 3621
Re: EM-2/Artemis 2 Orion Construction and Processing Updates
« Reply #82 on: 04/03/2024 12:12 am »
Quote
NASA is working with Orion spacecraft prime contractor Lockheed Martin to resolve a handful of issues that came up late last year during ground testing, forcing the delay of Artemis II to September 2025.

This delay was announced back in January (https://www.nasa.gov/news-release/nasa-shares-progress-toward-early-artemis-moon-missions-with-crew/), as were delays of Artemis III to September 2026 (same press release) and Artemis IV to September 2028 (https://spacepolicyonline.com/news/nasa-delays-next-artemis-missions-to-2025-and-2026/). So the new thing in the NSF article is more details about the cause of the delay, not the fact of the delay itself.

Online catdlr

  • Member
  • Senior Member
  • *****
  • Posts: 13454
  • Enthusiast since the Redstones
  • Marina del Rey, California, USA
  • Liked: 11167
  • Likes Given: 9061
Re: EM-2/Artemis 2 Orion Construction and Processing Updates
« Reply #83 on: 04/04/2024 08:16 pm »
https://twitter.com/NASA_Orion/status/1775953334387503255

Quote
Orion Spacecraft

@NASA_Orion
New Orion pics👀✨

At @NASAKennedy, teams moved the #Artemis II stack into a vacuum chamber, where it will undergo electromagnetic compatibility and interference testing to confirm Orion can safely fly through harsh electric fields.
It's Tony De La Rosa, ...I don't create this stuff, I just report it.

Online catdlr

  • Member
  • Senior Member
  • *****
  • Posts: 13454
  • Enthusiast since the Redstones
  • Marina del Rey, California, USA
  • Liked: 11167
  • Likes Given: 9061
Re: EM-2/Artemis 2 Orion Construction and Processing Updates
« Reply #84 on: 04/12/2024 08:42 am »
Artemis II Orion Vac Chamber Lift and Load Operations April 2024

Quote
Apr 11, 2024
On April 4, 2024, a team lifts the Artemis II Orion spacecraft into a vacuum chamber inside the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, where it will undergo electromagnetic compatibility and interference testing.



Picture of the facility at KSC:  GEO Tag
« Last Edit: 04/12/2024 08:48 am by catdlr »
It's Tony De La Rosa, ...I don't create this stuff, I just report it.

Online catdlr

  • Member
  • Senior Member
  • *****
  • Posts: 13454
  • Enthusiast since the Redstones
  • Marina del Rey, California, USA
  • Liked: 11167
  • Likes Given: 9061
Re: EM-2/Artemis 2 Orion Construction and Processing Updates
« Reply #85 on: 09/05/2024 02:29 pm »
https://twitter.com/SciGuySpace/status/1831687728997556512

Quote
An exploration program based on SLS and Orion has long been criticized as being hardware-poor. Being hardware-rich means you can test a lot. Being hardware-poor forces you into difficult corners like this:

Article
It's Tony De La Rosa, ...I don't create this stuff, I just report it.

Online catdlr

  • Member
  • Senior Member
  • *****
  • Posts: 13454
  • Enthusiast since the Redstones
  • Marina del Rey, California, USA
  • Liked: 11167
  • Likes Given: 9061
Re: EM-2/Artemis 2 Orion Construction and Processing Updates
« Reply #86 on: 09/06/2024 04:48 pm »
Moon Minute: Orion Testing, Underway Recovery Testing, + Egress Basket Testing



Quote
Sep 6, 2024  #NASA #Artemis #OrionWant the latest update for NASA's Artemis campaign? Learn about how the Orion spacecraft is experiencing vacuum chamber testing, Artemis II astronauts complete an underway recovery test, and the emergency egress baskets undergo drop testing.

Credit: NASA
It's Tony De La Rosa, ...I don't create this stuff, I just report it.

Online catdlr

  • Member
  • Senior Member
  • *****
  • Posts: 13454
  • Enthusiast since the Redstones
  • Marina del Rey, California, USA
  • Liked: 11167
  • Likes Given: 9061
Re: EM-2/Artemis 2 Orion Construction and Processing Updates
« Reply #87 on: 09/19/2024 08:36 pm »
cross-post for Artemis II heatshield issues:

Phillip Sloss Report:

Artemis II alternatives for Orion heat shield issue


https://forum.nasaspaceflight.com/index.php?topic=58223.msg2625904#new
It's Tony De La Rosa, ...I don't create this stuff, I just report it.

Online catdlr

  • Member
  • Senior Member
  • *****
  • Posts: 13454
  • Enthusiast since the Redstones
  • Marina del Rey, California, USA
  • Liked: 11167
  • Likes Given: 9061
Re: EM-2/Artemis 2 Orion Construction and Processing Updates
« Reply #88 on: 09/22/2024 12:12 pm »
cross-post for Artemis II heatshield issues:

Phillip Sloss Report:

Quote
Waiting for Artemis II Orion heatshield decision, Starship sidetracked by regulations power play?

01:14 Orion environment test article to finish crew-rating abort certifications

https://forum.nasaspaceflight.com/index.php?topic=58223.msg2626669#msg2626669
It's Tony De La Rosa, ...I don't create this stuff, I just report it.

Online Rocket Rancher

  • Member
  • Full Member
  • *
  • Posts: 124
  • Merritt Island, FL
  • Liked: 52
  • Likes Given: 56
Re: EM-2/Artemis 2 Orion Construction and Processing Updates
« Reply #89 on: 09/22/2024 12:34 pm »
Moon Minute: Orion Testing, Underway Recovery Testing, + Egress Basket Testing



Quote
Sep 6, 2024  #NASA #Artemis #OrionWant the latest update for NASA's Artemis campaign? Learn about how the Orion spacecraft is experiencing vacuum chamber testing, Artemis II astronauts complete an underway recovery test, and the emergency egress baskets undergo drop testing.

Credit: NASA

Has anyone ever ridden in an egress basket? All the testing I can remember back in the shuttle days and now are unmanned.

Online catdlr

  • Member
  • Senior Member
  • *****
  • Posts: 13454
  • Enthusiast since the Redstones
  • Marina del Rey, California, USA
  • Liked: 11167
  • Likes Given: 9061
Re: EM-2/Artemis 2 Orion Construction and Processing Updates
« Reply #90 on: 09/22/2024 12:51 pm »
Moon Minute: Orion Testing, Underway Recovery Testing, + Egress Basket Testing


Quote
Sep 6, 2024  #NASA #Artemis #OrionWant the latest update for NASA's Artemis campaign? Learn about how the Orion spacecraft is experiencing vacuum chamber testing, Artemis II astronauts complete an underway recovery test, and the emergency egress baskets undergo drop testing.

Credit: NASA

Has anyone ever ridden in an egress basket? All the testing I can remember back in the shuttle days and now are unmanned.

Two weeks ago. But I will admit that, through clever editing, the departure of the test team might have been staged after the testers were transferred down by elevator to the baskets below, and then filming resumed. I agree. I have seen many video tests of these, all without a person on board. I'm sure someone here will prove me wrong.

« Last Edit: 09/22/2024 12:55 pm by catdlr »
It's Tony De La Rosa, ...I don't create this stuff, I just report it.

Online Rocket Rancher

  • Member
  • Full Member
  • *
  • Posts: 124
  • Merritt Island, FL
  • Liked: 52
  • Likes Given: 56
Re: EM-2/Artemis 2 Orion Construction and Processing Updates
« Reply #91 on: 09/22/2024 04:02 pm »
During my time on the Shuttle program, I remember individuals, who had been working the program from almost the start, say that NASA deemed the baskets to be too dangerous for someone to ride during test. Was someone injured in the early days and testing was limited to mass simulators? All hear say on my part. But ... if people are suppose to ride these in an emergency egress of the tower, if its not safe for people to test ride, how is it safe to ride in an emergency? Curious people want to know  ;)

Online DanClemmensen

  • Senior Member
  • *****
  • Posts: 6568
  • Earth (currently)
  • Liked: 5292
  • Likes Given: 2228
Re: EM-2/Artemis 2 Orion Construction and Processing Updates
« Reply #92 on: 09/22/2024 04:08 pm »
During my time on the Shuttle program, I remember individuals, who had been working the program from almost the start, say that NASA deemed the baskets to be too dangerous for someone to ride during test. Was someone injured in the early days and testing was limited to mass simulators? All hear say on my part. But ... if people are suppose to ride these in an emergency egress of the tower, if its not safe for people to test ride, how is it safe to ride in an emergency? Curious people want to know  ;)
Similar to ejection seats on a fighter or the LAS on a capsule. Fairly high risk of injury, but better than certain death of not using the system.

Tags:
 

Advertisement NovaTech
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
1