Forums
L2 Sign Up
SLS/Orion
SpaceX
Commercial
ISS
International
Other
Shop
Home
Help
Tags
Calendar
Login
Register
Forums
»
NASA Shuttle Specific Sections
»
Atlantis (Post STS-135, T&R)
»
ET-118 latest
Print
Pages: [
1
]
Go Down
Author
Topic: ET-118 latest (Read 3182 times)
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 138668
Liked: 133652
Likes Given: 25457
ET-118 latest
«
on:
01/27/2006 03:37 pm »
ET-118 in Horizontal Final Assembly, Position 1
Developmental Flight Instrumentation (DFI)
Currently working engineering for LH2 and LO2 DFI.
Longeron Closeout R&R
Preparations for longeron proficiency sprays continue. ET-118 surface preps continue.
PAL Ramp
Removal of LH2 PAL ramp completed week of 1/16. Completed zone layout for the LO2 PAL ramp removal.
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
Print
Pages: [
1
]
Go Up
Tags:
Forums
»
NASA Shuttle Specific Sections
»
Atlantis (Post STS-135, T&R)
»
ET-118 latest
Advertisement
Tweets by NASASpaceflight
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
1