Ouch

-snip-

This isn't an SLS problem, this is a hydrogen problem.

With Shuttle Back in Space, NASA Returns to Leak Problem
HYDROGEN LEAKS TORMENT NASA

Pretty much.

To make clear: no actual leak has been identified. The top risk identified by SLS program officials concerns the possibility of such a leak occuring when the CS is fueled during tanking tests or for the Green Run.
NASA has plenty of experience with Hydrogen leaks. Hydrogen leaks have pestered them ever since the Saturn days, with a near-constant vigilance required during the 30-year run of shuttle.

So yeah, NASA understands the trouble with hydrogen, which is exactly why a leak occuring during fueling is considered an open top risk. Not until the tanking tests and Green Run have taken place will we know if this risk has been sufficiently retired.

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 42875
  • UK
    • Plan 28
  • Liked: 73187
  • Likes Given: 32871
I dug out the leak quote from the report (p82):

Quote
Program officials indicated that one of the top remaining technical risks to the green run test is that the core stage may develop leaks when it is filled with fuel. According to these officials, they have conducted extensive scaled testing of the gaskets and seals used in the core stage; however, it is difficult to precisely predict how this large volume of liquid hydrogen will affect the stage.

So, if I understand correctly, you can’t do a full scale test until you do a full scale test?!

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 9807
  • US
  • Liked: 12992
  • Likes Given: 5626
« Last Edit: 06/23/2022 05:51 pm by gongora »

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 9807
  • US
  • Liked: 12992
  • Likes Given: 5626
And 2021 since I forgot it last year.

https://www.gao.gov/products/gao-21-306

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 9807
  • US
  • Liked: 12992
  • Likes Given: 5626
Just realized I never posted the excerpts I started putting together yesterday.

Quote
Gateway - Deep Space Logistics : SpaceX may be given authority to proceed on first mission in late 2023.  First Dragon XL flight currently planned for 2027, delivering Gateway External Robotic System (GERS).

HALO : "preliminary launch schedule from July 2025 to February 2026" "As of February 2022, the co-manifested vehicle is above the Falcon Heavy launch vehicle’s mass limit. If the mass is too high, it could affect the vehicle’s ability to reach the correct lunar orbit. The project is taking steps to reduce mass, including evaluating whether it needs to potentially off-load some components for initial launch."

HLS : "The program is reviewing initial schedules from SpaceX, and expects to establish cost and schedule baselines in August 2022."

Dragonfly : "NASA’s Launch Services Program provided the project with performance information on the candidate heavy-lift launch vehicles: Falcon Heavy, Vulcan 6s, and New Glenn."

CCP : Crewed Flight Test. CCP and Boeing have multiple items to complete to be ready for the crewed flight test. While launch vehicle components have been delivered and Boeing requested a launch window, the service module production will be a key schedule driver. Boeing will fly the service module originally slated for its first service mission on its crewed flight test. CCP and Boeing’s readiness for the crewed flight test will be determined by how quickly they complete the significant certification work that remains. The CCP program manager said the program approved 50 percent of Boeing’s certification products for the crewed flight test as of January 2022. However, because the program limited the scope of uncrewed flight test-2 to reduce the program’s certification workload, the program manager said the remaining certification work for the crewed flight test includes challenging items such as Boeing’s parachutes, landing loads, and abort systems.

In addition, the CCP and ISS programs are concerned that operational staff may not be able to safely operate Boeing’s crewed spacecraft if there are any issues with Boeing’s flight software. CCP reported that Boeing’s approach to software development and testing created a significant backlog of software problem reports. Program officials said the operations team is being trained on operational workarounds to complete functions manually that software would normally automate. Several teams reported little capacity to safely accommodate additional operational workload that may be needed if there are any problems with Boeing’s flight software. To mitigate this issue, CCP plans to provide operational teams 6 months of training time with released software and closely monitor workload.

One of CCP’s top risks for the crewed flight test is that quality issues with hardware may pose unknown risks to the mission or to crew safety. CCP had previously discovered deficiencies in Boeing’s quality management of its suppliers. Boeing made changes to its quality management processes, which NASA determined to be sufficient through multiple audits. However, CCP plans to conduct technical assessments of certain systems to better understand the risk level to the mission or crew safety.

Europa Clipper : Launching on a Falcon Heavy during the project’s target launch date of October 2024 will require that Europa Clipper fly first around Mars and Earth—leveraging the planets’ gravities to increase the spacecraft’s speed in a maneuver known as a gravity assist—before entering Jupiter’s orbit in April 2030. If the project does not meet the target launch date, the next launch opportunity begins in October 2025. This later date would require Europa Clipper to execute two Earth and one Mars gravity assists before entering Jupiter’s orbit in July 2031.
« Last Edit: 06/24/2022 08:42 pm by gongora »

Offline Comga

  • Senior Member
  • *****
  • Posts: 6356
  • Liked: 4415
  • Likes Given: 4673
Another quote ftom the GAO report:
Quote
Psyche uses two specialized cameras, or imagers, for science imaging and spacecraft navigation. The imagers include parts such as a telescope and camera electronics. The imagers continue to face technical challenges, and one is further in development than the other. The fundamental problem is the sensitivity of the primary mirror within the telescope to distortions in the mirror’s surface caused by external stresses over temperature.  For example, the structure and bond materials that hold the mirror in place could distort the surface of the mirror, resulting in poor performance. In addition, one imager did not behave the way models predicted. Because of these issues, the telescopes had to be disassembled and reassembled several times. The project is working to mitigate these issues by replacing hardware and using different materials and bonding techniques.

This is a great example of why its to hard to control costs on NASA projects.
The problem of building an ultra-lightweight, athermal, Vis-NIR imager for extremely cold operations in deep space was solved two decades ago specifically by avoiding ”different materials and bonding techniques”.  But the NASA centers have to do it themselves. Ralph on OSIRIS-Rex and L’Ralph on Lucy were “brought in-house” instead of going back to the industrial partnership that built Ralph for New Horizons, but even those would have been better starting points than a blank sheet.
And while the programs want to constrain costs the Centers want to rack up the head counts in ways only a few companies can get away with.  You can fire a commercial vendor or hold them to a fixed price contract but what can you do with a NASA Center?

Also, check out how many programs are still having problems with momentum wheels. Shades of Kepler.
« Last Edit: 06/25/2022 06:50 pm by Comga »
What kind of wastrels would dump a perfectly good booster in the ocean after just one use?

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 9807
  • US
  • Liked: 12992
  • Likes Given: 5626

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0