SSU as in Sequential Shunt Unit for P6 Ammonia Cables or is this at P3/P4 junction??
07/09/13..............US EVA (tentative)
What is the UM module that will be launched in November 2014 and attach itself to the MLM?
ISS orbit's reboosts are planned on March 21st
http://www.nasa.gov/pdf/737534main_exp35-36_press_kit.pdf
...and install cables for the fixed grapple bar’s module’s power and data grapple fixture.
Quote from: anik on 03/28/2013 01:24 pm...and install cables for the fixed grapple bar’s module’s power and data grapple fixture.I think here they are referring to the FGB "Functional Cargo Block" PDGF, but have confused it with the "Fixed Grapple Bar" (which do not have PDGFs).