Author Topic: Exploration Enterprise Workshop Day 1 and Day 2 Presentations released  (Read 25685 times)

Offline hutchel

  • Overzealous Enthusiast
  • Full Member
  • *
  • Posts: 107
  • Washington, DC
  • Liked: 18
  • Likes Given: 38
On page 13 of the Inflatable Module Mission document.

Node 4 (Option).


So what are we looking at to actually develop this (time/ cost) - since there are numerous documents and comments talking about inflatable and other new ISS modules on the US side.  It's obvious that this is needed (tug and Node 4) and the HTV and ATV demonstrate it's possible but obviously they have the payloads built into the vehicles.  For the future it's obvious that this is just as important as a US human rated vehicle (capsule, etc)

Offline 2552

  • Full Member
  • ****
  • Posts: 486
  • Liked: 42
  • Likes Given: 522
Bump. Videos of the Day 1 presentations and Panel Q&A are up.
« Last Edit: 07/14/2010 07:38 am by 2552 »

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
1