Author Topic: ISS U.S. EVA-50 - May 16, 2018  (Read 16682 times)

Offline Olaf

  • Full Member
  • ****
  • Posts: 1583
  • Germany
  • Liked: 443
  • Likes Given: 218
ISS U.S. EVA-50 - May 16, 2018
« on: 05/01/2018 03:57 PM »
https://www.nasa.gov/multimedia/nasatv/schedule.html
Quote
2 p.m., Tuesday, May 8 - U.S. Spacewalk Briefing
Quote
6:30 a.m., Wednesday, May 16 - U.S. Spacewalk # 50 Coverage (Feustel and Arnold; spacewalk begins at 8:10 a.m. EDT, scheduled to last appx. 6 ½ hours)
« Last Edit: 05/14/2018 02:44 PM by eeergo »

Offline Olaf

  • Full Member
  • ****
  • Posts: 1583
  • Germany
  • Liked: 443
  • Likes Given: 218
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #1 on: 05/01/2018 03:58 PM »
https://blogs.nasa.gov/stationreport/2018/04/
Quote
Today the crew initiated a Metox canister regeneration cycle in preparation for the upcoming US EVA Pump Flow Control System (PFCS) Relocate currently planned on May 16th. 

Online catdlr

  • Member
  • Senior Member
  • *****
  • Posts: 5504
  • Viewed launches since the Redstones
  • Marina del Rey, California, USA
  • Liked: 2122
  • Likes Given: 1482
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #2 on: 05/02/2018 08:54 PM »
May 02, 2018
MEDIA ADVISORY M18-072

NASA to Preview Pair of Upcoming US Spacewalks, Provide Live Coverage


Two NASA astronauts are scheduled to venture outside the International Space Stationfor a pair of six-and-a-half-hour spacewalks May 16 and 30. Experts from NASA will preview the work to be done during the spacewalks in a briefing at 2 p.m. EDT Tuesday, May 8, at NASA’s Johnson Space Center in Houston.

Live coverage of the briefing and spacewalks will air on NASA Television and the agency’s website.

Expedition 55 Flight Engineers Drew Feusteland Ricky Arnoldwill put on spacesuits for what will be the 210th and 211th spacewalks in support of station assembly, maintenance and upgrades. These spacewalks will be the eighth and ninth of Feustel’s career, and the fourth and fifth of Arnold’s. The primary objectives are to finish upgrading cooling system hardware and install new and updated communications equipment for future dockings of commercial crew spacecraft.

Media wishing to participate in the May 8 briefing in person must request credentials from the Johnson newsroom no later than 4 p.m. Monday, May 7. Media interested in participating by phone must contact the newsroom by 1:45 p.m. May 8.

Participating in the briefing are:

Kenneth Todd, NASA’s International Space Station Operations integration manager
Anthony Vareha, NASA spacewalk flight director
Jordan Lindsey, U.S. spacewalk 50 officer at NASA
Keith Johnson, U.S. spacewalk 51 officer at NASA

The first spacewalk will begin about 8:10 a.m. Wednesday, May 16. NASA TV coverage will begin at 6:30 a.m. Feustel and Arnold will move a component called a Pump Flow Control Subassembly (PFCS) from a spare parts platform on the station’s truss “backbone” to the Special Purpose Dexterous Manipulator (Dextre) robotic arm. The PFCS drives and controls the flow of ammonia through the exterior portions of the station’s cooling system. Robotics controllers on Earth will use Canadarm2 and Dextre to perform final installation on the port-side truss for checkout. The spacewalkers will remove a failed PFCS and return it to the spare parts depot. They’ll also replace a camera system on the Destiny Laboratory and a communications receiver. This also be the 50th spacewalk originating from the station’s Quest airlock. Other assembly and maintenance spacewalks have begun from space shuttle and Russian airlocks.

The second spacewalk is planned for Wednesday, May 30, but the exact timing is dependent on the anticipated May 24 arrival of the Orbital ATK Cygnus cargo resupply spacecraft. The ninth Cygnus cargo mission is scheduled to launch May 20 from NASA’s Wallops Flight Facility in Virginia.

During the May 30 spacewalk, Arnold and Feustel will install a pair of brackets and high-definition cameras on the Harmony module that will help commercial crew vehicles align with the international docking adapter the forward end of Harmony. The cameras also will provide wireless data network access for experiments and facilities mounted on the ESA (European Space Agency) Columbus laboratory and Japan Aerospace Exploration Agency Kibo laboratory. The crew also will replace a camera on the station’s starboard truss.

For more information about the International Space Station, its research and crew, visit:

https://www.nasa.gov/station

-end-
Tony De La Rosa

Offline jacqmans

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 17700
  • Houten, The Netherlands
  • Liked: 3345
  • Likes Given: 195
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #3 on: 05/04/2018 01:58 PM »
ISS Daily Summary Report – 5/03/2018

Extravehicular Mobility Unit (EMU) Loop Scrub and Conductivity Test:  As part of the preparation activities needed to support the upcoming US EVA Pump Flow Control System (PFCS) Relocate currently planned on May 16th, the crew performed EMU water loop scrubs and tested water samples for conductivity.  During the maintenance activities, the crew noted that EMU 3006 was making an unexpected noise.  While suit telemetry appeared nominal, and no hardware issues were noted throughout the activities, a recording of the anomalous sound was provided to engineering teams for review.

External TV Camera Group (ETVCG) Assembly: Today the crew completed assembly of an ETVCG for use in the upcoming US EVA on 16-May. This new ETVCG was constructed using the Light Assembly that was recently repaired by the crew on-orbit.  Despite multiple attempts, the crew was unable to confirm full engagement of the locking mechanism that holds the External High Definition Camera (EHDC) onto the Color TV Camera (CTVC). Engineering teams are currently reviewing photos and ground test data to determine whether or not additional action is required prior to the EVA.


Offline Joachim

  • Full Member
  • *
  • Posts: 184
  • Mainz, Germany
    • SPACEFACTS
  • Liked: 68
  • Likes Given: 238
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #4 on: 05/07/2018 06:12 AM »
Which EMU will Feustel and Arnold wear?

Online Targeteer

  • Senior Member
  • *****
  • Posts: 3872
  • near hangar 18
  • Liked: 982
  • Likes Given: 478
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #5 on: 05/07/2018 04:10 PM »
The space-walkers are in the airlock testing the suits now with help from Neemo
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #6 on: 05/07/2018 11:01 PM »
The space-walkers are in the airlock testing the suits now with help from Neemo
Ricky Arnold and Drew Feustel with assistance from Norishige Kanai, conducted an EMU OFV "On-Orbit Fit Verification" to confirm the correct sizing of suits.
« Last Edit: 05/07/2018 11:05 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #7 on: 05/07/2018 11:07 PM »
Seems that Arnold is doing a second check...
« Last Edit: 05/07/2018 11:10 PM by centaurinasa »

Offline Rondaz

  • Full Member
  • **
  • Posts: 248
  • Liked: 58
  • Likes Given: 103
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #8 on: 05/08/2018 03:24 PM »
ISS Daily Summary Report – 5/07/2018

Extravehicular Activity (EVA) Preparations:  Today the crew initiated a charge of the Extravehicular Mobility Unit (EMU) Long Life Batteries (LLB) and also initiated an automated Charge-Discharge-Charge cycle on the EVA batteries in the Battery Stowage Assembly (BSA) using the Battery Charger Assembly.  After preparing the Equipment Lock and EMUs for suit donning, the crew completed an On-Orbit Fitcheck Verification (OFV) to verify correct EMU sizing for the upcoming US EVA Pump Flow Control System (PFCS) relocate EVA, currently planned on 16-May.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #9 on: 05/08/2018 05:56 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #10 on: 05/08/2018 06:03 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #11 on: 05/08/2018 06:03 PM »
« Last Edit: 05/08/2018 06:05 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #12 on: 05/08/2018 06:05 PM »
« Last Edit: 05/08/2018 06:09 PM by centaurinasa »

Offline Joachim

  • Full Member
  • *
  • Posts: 184
  • Mainz, Germany
    • SPACEFACTS
  • Liked: 68
  • Likes Given: 238
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #13 on: 05/08/2018 06:07 PM »
Do we know the EMU No now?

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #14 on: 05/08/2018 06:10 PM »
Not yet....

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #15 on: 05/08/2018 06:16 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #16 on: 05/08/2018 06:19 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #17 on: 05/08/2018 06:20 PM »
Time to EVA-50's animation, now

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #18 on: 05/08/2018 06:33 PM »
Various PFCS "Pump Flow Control Subassembly"  Nicknames  :)

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #19 on: 05/08/2018 06:36 PM »
Ammonia jumper

Offline deruch

  • Senior Member
  • *****
  • Posts: 2305
  • California
  • Liked: 1840
  • Likes Given: 3993
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #20 on: 05/09/2018 12:42 AM »
Various PFCS "Pump Flow Control Subassembly"  Nicknames  :)

I was bummed they didn't color in the text for "MOTLEY" in actual motley.
Shouldn't reality posts be in "Advanced concepts"?  --Nomadd

Offline Olaf

  • Full Member
  • ****
  • Posts: 1583
  • Germany
  • Liked: 443
  • Likes Given: 218
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #21 on: 05/09/2018 08:11 AM »
Various PFCS "Pump Flow Control Subassembly"  Nicknames  :)
Does someone know, which PFCS has which nickname?

Online FutureSpaceTourist

  • Senior Member
  • *****
  • Posts: 6548
  • UK
    • Plan 28
  • Liked: 6253
  • Likes Given: 1882
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #22 on: 05/09/2018 07:09 PM »

Online russianhalo117

  • Senior Member
  • *****
  • Posts: 4696
  • AR USA / Berlin, DE / Moscow, RF
  • Liked: 1195
  • Likes Given: 594
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #23 on: 05/09/2018 08:23 PM »
Various PFCS "Pump Flow Control Subassembly"  Nicknames  :)
Does someone know, which PFCS has which nickname?
The one on that was on P6 was called Leaky and the one on ESP-1 is Frosty.
« Last Edit: 05/10/2018 02:00 AM by russianhalo117 »

Offline deruch

  • Senior Member
  • *****
  • Posts: 2305
  • California
  • Liked: 1840
  • Likes Given: 3993
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #24 on: 05/10/2018 12:04 AM »
Various PFCS "Pump Flow Control Subassembly"  Nicknames  :)
Does someone know, which PFCS has which nickname?

Motley is the new one that just went up in the CRS-14 trunk.  And Trippy was the one that was just deorbited when Dragon left the station.
« Last Edit: 05/10/2018 12:05 AM by deruch »
Shouldn't reality posts be in "Advanced concepts"?  --Nomadd

Offline Rondaz

  • Full Member
  • **
  • Posts: 248
  • Liked: 58
  • Likes Given: 103
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #25 on: 05/10/2018 02:46 PM »
ISS Daily Summary Report – 5/08/2018

Extravehicular Activity (EVA) Preparations:  Today the crew reviewed the EVA Systems Briefing Package for the upcoming US EVA Pump Flow Control System (PFCS) relocate EVA currently planned on 16-May.  The briefing contains crew reminders, an emergency briefing, helpful tips, and specific procedures for the upcoming EVA; this information was reviewed, and crew questions addressed, during this afternoon’s Procedures Conference with EVA ground specialists.  After completion of this conference, the crew configured EVA tools per the briefing package and continued with Extravehicular Mobility Unit (EMU) Long Life Batteries (LLB) charging operations.

Offline jcm

  • Senior Member
  • *****
  • Posts: 2977
  • Jonathan McDowell
  • Somerville, Massachusetts, USA
    • Jonathan's Space Report
  • Liked: 553
  • Likes Given: 387
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #26 on: 05/11/2018 02:05 AM »
Various PFCS "Pump Flow Control Subassembly"  Nicknames  :)
Does someone know, which PFCS has which nickname?

Motley is the new one that just went up in the CRS-14 trunk.  And Trippy was the one that was just deorbited when Dragon left the station.

I'm still unclear about Trippy and Leaky. I assume Leaky is S/N 0004, the one that was swapped out in the 2013 EVA and was originally on the P6 2B channel, but has been sitting in one of the two EATCS slots since 2013 for storage.
Which P6 channel was Trippy - was it the 4B PFCS, or the 'new' 2B PFCS that was swapped in in 2013?
Or do I have it all wrong?
There are a total of 12 PFCS launched to date including the late lamented Trippy

Also, is Leaky already on the EOTP somehow, or is that robotics work still to be done prior to EVA?

« Last Edit: 05/11/2018 03:01 AM by jcm »
-----------------------------

Jonathan McDowell
http://planet4589.org

Offline Olaf

  • Full Member
  • ****
  • Posts: 1583
  • Germany
  • Liked: 443
  • Likes Given: 218
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #27 on: 05/11/2018 05:47 AM »
Also, is Leaky already on the EOTP somehow, or is that robotics work still to be done prior to EVA?
It was installed in the night from 9th to 10th May.
https://blogs.nasa.gov/stationreport/2018/05/
Quote
Last night, Robotics Ground Controllers maneuvered the Space Station Remote Manipulator System (SSRMS) and the Special Purpose Dexterous Manipulator (SPDM) in position to extract the failed Pump Flow Control Assembly (PFCS) also known as ‘Leaky’.  They extracted the PFCS and stowed it on the Enhanced ORU Temporary Platform (EOTP) side 3.
« Last Edit: 05/11/2018 06:00 AM by Olaf »

Offline Olaf

  • Full Member
  • ****
  • Posts: 1583
  • Germany
  • Liked: 443
  • Likes Given: 218
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #28 on: 05/11/2018 07:25 AM »
I'm still unclear about Trippy and Leaky. I assume Leaky is S/N 0004, the one that was swapped out in the 2013 EVA and was originally on the P6 2B channel, but has been sitting in one of the two EATCS slots since 2013 for storage.
Which P6 channel was Trippy - was it the 4B PFCS, or the 'new' 2B PFCS that was swapped in in 2013?
Or do I have it all wrong?
There are a total of 12 PFCS launched to date including the late lamented Trippy
I would suppose, that the PFCS, which was going down in SpX-14, was the one, that was changed out in 2013, because it was unserviceable. It makes no sense, to send one down which is still serviceable.
On the other hand I suppose, that Leaky is the spare which was used in the EETCS and was then as a spare on P6. It will now changed for what or ever reason with the spare on ESP-1.
The other two PFCS on P6 are in use on Channel 4B and on 2B(from the former EETCS, which was changed in in 2013), so actually no reason for changing.
But those are just my assumptions, no source.
« Last Edit: 05/11/2018 07:26 AM by Olaf »

Offline Rondaz

  • Full Member
  • **
  • Posts: 248
  • Liked: 58
  • Likes Given: 103
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #29 on: 05/11/2018 12:02 PM »
ISS Daily Summary Report – 5/10/2018

Extravehicular Activity (EVA) Preparations: In preparation for next week’s US EVA 50 Pump and Flow Control Subassembly (PFCS) Relocate, the crew used computer-aided simulations to review EVA procedures via Dynamic Onboard Ubiquitous Graphics (DOUG) and the Robotics Onboard Trainer (ROBoT).  They also used Virtual Reality to review procedures associated with the Simplified Aid for EVA Rescue (SAFER).  In addition to this training, the crew completed a checkout of the SAFER units, continued with Extravehicular Mobility Unit (EMU) Long Life Battery (LLB) charging operations, and configured various cameras used during EVA

Robotic Operations:  Last night, Robotics Ground Controllers maneuvered the Space Station Remote Manipulator System (SSRMS) and the Special Purpose Dexterous Manipulator (SPDM) in position to extract the failed Pump Flow Control Assembly (PFCS) also known as ‘Leaky’.  They extracted the PFCS and stowed it on the Enhanced ORU Temporary Platform (EOTP) side 3.  After initial release, the SSRMS rebounded in the X and Y directions and contacted structure; survey of the P6 interface did not indicate any damage.  The Mobile Transporter (MT) was translated from Worksite 8 to Worksite 6 to complete last night’s operations.

It is going to be a busy night tonight outside the ISS.  Ground controllers in Houston will continue to configure the MSS for the PFCS EVA. The SPDM, will install PFCS ‘Leaky’ on the EOTP, after which the SSRMS will be moved to the EVA starting position. Later in the evening Ground controllers in Tsukuba, Japan will maneuver Japanese Experiment Module Remote Manipulator System (JEMRMS) from the Stowed Position to the Small Satellite Deploy Position in preparation for Japanese Small Satellite Orbital Demonstration (JSSOD)-8 satellite deploys tomorrow morning.

Offline Olaf

  • Full Member
  • ****
  • Posts: 1583
  • Germany
  • Liked: 443
  • Likes Given: 218
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #30 on: 05/11/2018 03:37 PM »
I'm still unclear about Trippy and Leaky. I assume Leaky is S/N 0004, the one that was swapped out in the 2013 EVA and was originally on the P6 2B channel, but has been sitting in one of the two EATCS slots since 2013 for storage.
Which P6 channel was Trippy - was it the 4B PFCS, or the 'new' 2B PFCS that was swapped in in 2013?
Or do I have it all wrong?
There are a total of 12 PFCS launched to date including the late lamented Trippy
I would suppose, that the PFCS, which was going down in SpX-14, was the one, that was changed out in 2013, because it was unserviceable. It makes no sense, to send one down which is still serviceable.
On the other hand I suppose, that Leaky is the spare which was used in the EETCS and was then as a spare on P6. It will now changed for what or ever reason with the spare on ESP-1.
The other two PFCS on P6 are in use on Channel 4B and on 2B(from the former EETCS, which was changed in in 2013), so actually no reason for changing.
But those are just my assumptions, no source.

I have to correct myself. In the briefing it would mentioned, that Leaky is the one, which was swapped out in 2013.
So forget my assumptions.

Offline Yellowstone10

Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #31 on: 05/11/2018 05:59 PM »
Which P6 channel was Trippy - was it the 4B PFCS, or the 'new' 2B PFCS that was swapped in in 2013?
Or do I have it all wrong?

I did some digging through the station reports and found a mention of some electrical troubleshooting on the outboard spare PFCS on the P6 Long Spacer in August 2017.

https://blogs.nasa.gov/stationreport/2017/08/02/

EVA-21 planning graphics indicate that the inboard spare PFCS was used to replace Leaky, so Trippy appears to be (er... have been) the other spare PFCS that was initially part of the EETCS.
« Last Edit: 05/11/2018 06:00 PM by Yellowstone10 »

Offline Rondaz

  • Full Member
  • **
  • Posts: 248
  • Liked: 58
  • Likes Given: 103
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #32 on: 05/14/2018 02:36 PM »
ISS Daily Summary Report – 5/11/2018

Extravehicular Activity (EVA) Preparations: In preparation for next week’s US EVA 50 Pump and Flow Control Subassembly (PFCS) Relocate, the crew utilized Dynamic Onboard Ubiquitous Graphics (DOUG) Software to review crew translation paths and Space Station Remote Manipulator System (SSRMS) movement during the EVA. Once complete with this simulation, the crew continued reviewing the EVA Systems Briefing Package before conducting a second EVA Procedures Conference with ground specialists.  A checkout of the Rechargeable EVA Battery Assembly (REBA), used to power the glove heaters on the Extravehicular Mobility Units (EMUs), concluded the list of today’s EVA prep activities

Mobile Servicing System (MSS) Operations: Last night, the Robotics Ground Control team powered up the MSS and maneuvered the Space Station Remote Manipulator System (SSRMS) to stow the Special Purpose Dexterous Manipulator (SPDM), with the “Leaky” Pump/Flow Control Subassembly (PFCS), on the LAB Power Data Grapple Fixture (PDGF).  The SSRMS then released the SPDM and maneuvered to the start position in support for the EVA scheduled next week. MSS performance was nominal.

Offline Rondaz

  • Full Member
  • **
  • Posts: 248
  • Liked: 58
  • Likes Given: 103
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #33 on: 05/15/2018 02:50 PM »
ISS Daily Summary Report – 5/14/2018

Extravehicular Activity (EVA) Preparations: In preparation for Wednesday’s US EVA 50 Pump and Flow Control Subassembly (PFCS) Relocate, the crew completed additional EVA tool configuration and performed an Extravehicular Mobility Unit (EMU) 3003 and 3006 water recharge and ullage dump.

Offline SMS

  • Regular
  • Full Member
  • ****
  • Posts: 840
    • Astronauts & their spaceflights
  • Liked: 217
  • Likes Given: 147
---
SMS ;-).

Offline Joachim

  • Full Member
  • *
  • Posts: 184
  • Mainz, Germany
    • SPACEFACTS
  • Liked: 68
  • Likes Given: 238
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #35 on: 05/15/2018 07:17 PM »
Feustel 3006
Arnold  3003
Correct?

Offline SMS

  • Regular
  • Full Member
  • ****
  • Posts: 840
    • Astronauts & their spaceflights
  • Liked: 217
  • Likes Given: 147
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #36 on: 05/15/2018 07:32 PM »
Yes, it's correct ;)
---
SMS ;-).

Offline SMS

  • Regular
  • Full Member
  • ****
  • Posts: 840
    • Astronauts & their spaceflights
  • Liked: 217
  • Likes Given: 147
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #37 on: 05/16/2018 06:41 AM »


Quote
U.S. EVA 50 - Animation of Tasks - Jordan Lindsey
---
SMS ;-).

Online Targeteer

  • Senior Member
  • *****
  • Posts: 3872
  • near hangar 18
  • Liked: 982
  • Likes Given: 478
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #38 on: 05/16/2018 07:15 AM »
pre-breathe started
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #39 on: 05/16/2018 10:37 AM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #40 on: 05/16/2018 10:37 AM »
« Last Edit: 05/16/2018 10:41 AM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #41 on: 05/16/2018 10:39 AM »
SAFER "Simplified Aid for EVA Rescue"
« Last Edit: 05/16/2018 10:51 AM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #42 on: 05/16/2018 10:56 AM »
The two spacewalkers are now in crew lock section...

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #43 on: 05/16/2018 10:58 AM »
And internal hatch closed

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #44 on: 05/16/2018 11:05 AM »
EV-1 & 2 comm checks

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #45 on: 05/16/2018 11:12 AM »
Below 10 psi...

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #46 on: 05/16/2018 11:15 AM »
Below 8 psi, now….

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #47 on: 05/16/2018 11:21 AM »
5 psi, Leak check...

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #48 on: 05/16/2018 11:23 AM »
4psi now….
« Last Edit: 05/16/2018 11:24 AM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #49 on: 05/16/2018 11:25 AM »
2,5 psi...

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #50 on: 05/16/2018 11:27 AM »
Tethers configuration check.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #51 on: 05/16/2018 11:29 AM »
2 psi, "Butch" Wilmore now in charge….

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #52 on: 05/16/2018 11:39 AM »
"Go for opening the hatch"
« Last Edit: 05/16/2018 11:40 AM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #53 on: 05/16/2018 11:41 AM »
Below 1,5 psi, Batteries in internal power, Official start of EVA-50 at 11.39 UTC

Online Chris Bergin

Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #54 on: 05/16/2018 11:42 AM »
Article by Pete Harding. Will update as we go! Thanks again to centaurinasa for being here for coverage!

https://www.nasaspaceflight.com/2018/05/eva-50-feustel-arnold-spacewalk-double-may/

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #55 on: 05/16/2018 11:45 AM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #56 on: 05/16/2018 11:47 AM »
Some ice coming out from the hatch

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #57 on: 05/16/2018 11:48 AM »
Go for egress: EV-1 out first follow by EV-2

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #58 on: 05/16/2018 11:50 AM »
Securing safety tether.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #59 on: 05/16/2018 11:52 AM »
Some checks to making sure that the ice is not coming from EMUs.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #60 on: 05/16/2018 11:53 AM »
"Go for hatch thermal cover close"

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #61 on: 05/16/2018 11:53 AM »
As usual, Body check, now...

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #62 on: 05/16/2018 11:55 AM »
HAP "helmet absorption pad" check, now

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #63 on: 05/16/2018 11:57 AM »
EV-2 translation to ESP-1 worksite (where PFCS "Pump and Flow Control Subassembly" is stow) to temp stow his crew lock bag

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #64 on: 05/16/2018 11:59 AM »
EV-1 transtale to ESP-1, by nadir way...
« Last Edit: 05/16/2018 12:01 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #65 on: 05/16/2018 12:03 PM »
EV-1: Drew Feustel (red stripes and helmet cam 17)
EV-2: Ricky Arnold (no stripes and helmet cam 18)

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #66 on: 05/16/2018 12:06 PM »
At ESP-1 worksite, EV-1 configure APFR for future ingress and EV-2 set up "bolt stack assembly" (for PFSC temp stow)
« Last Edit: 05/16/2018 12:12 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #67 on: 05/16/2018 12:07 PM »
Removing MLI "Multi-Layers Insulation" from PFCS

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #68 on: 05/16/2018 12:13 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #69 on: 05/16/2018 12:17 PM »
EV-2 retrieve gap spanner and install it between two handrails

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #70 on: 05/16/2018 12:19 PM »
"Sunrise gentlemen !"

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #71 on: 05/16/2018 12:22 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #72 on: 05/16/2018 12:23 PM »
EV-1 retrieve S0 jumper (stow on EVA-49) and mate it on FSE "Flight Support Equipment"
« Last Edit: 05/16/2018 12:24 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #73 on: 05/16/2018 12:25 PM »
EV-2 close the flood quick disconnect on PFCS
« Last Edit: 05/16/2018 12:28 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #74 on: 05/16/2018 12:25 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #75 on: 05/16/2018 12:26 PM »
EV-1 ingress APFR and install two scoops with EV-2 help.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #76 on: 05/16/2018 12:31 PM »
PET 51 mn

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #77 on: 05/16/2018 12:35 PM »
Some photo of jumper installation
« Last Edit: 05/16/2018 12:37 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #78 on: 05/16/2018 12:36 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #79 on: 05/16/2018 12:45 PM »
Seems like NASA TV audio is down…..  :-\

Online Chris Bergin

Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #80 on: 05/16/2018 12:47 PM »
Seems like NASA TV audio is down…..  :-\

Ok for me here:

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #81 on: 05/16/2018 12:47 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #82 on: 05/16/2018 12:48 PM »

Offline freda

  • Member
  • Posts: 25
  • USA
  • Liked: 19
  • Likes Given: 4
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #83 on: 05/16/2018 12:48 PM »
Callout was "no SD" when they press the button on GoPro. Sounds like forgot to put a SD card in the GoPro camera before the EVA.

Online Orbiter

  • Senior Member
  • *****
  • Posts: 2216
  • Florida
  • Liked: 412
  • Likes Given: 926
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #84 on: 05/16/2018 12:51 PM »
Minor fact: Drew Feustel also ventured outside on an EVA on this day 9 years ago during the STS-125 mission.
Attended space missions: STS-114, STS-124, STS-128, STS-135, Atlas V "Curiosity", Delta IV Heavy NROL-15, Atlas V MUOS-2, Delta IV Heavy NROL-37, Falcon 9 CRS-9, Falcon 9 JCSAT-16, Atlas V GOES-R, Falcon 9 SES-11, Falcon Heavy Demo.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #85 on: 05/16/2018 12:53 PM »
EV-1 now egress from  APFR

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #86 on: 05/16/2018 01:00 PM »
The "magic" PGT "Pistol Grip Tool"

Online Chris Bergin

Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #87 on: 05/16/2018 01:02 PM »
It's out! :)

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #88 on: 05/16/2018 01:02 PM »
PFCS "Leaky" now released...
« Last Edit: 05/16/2018 01:07 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #89 on: 05/16/2018 01:11 PM »
Now, They transfert the failed PFCS on temp sto location  bolt stack assembly.
« Last Edit: 05/16/2018 01:12 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #90 on: 05/16/2018 01:19 PM »
Next, removing "Frosty" PFCS from ESP-1 by releasing two bolds on this spare unit

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #91 on: 05/16/2018 01:20 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #92 on: 05/16/2018 01:21 PM »
Now extract, EV-2 photodocument and inspect the bottom side of the spare unit
« Last Edit: 05/16/2018 01:25 PM by centaurinasa »

Online Chris Bergin

Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #93 on: 05/16/2018 01:25 PM »
Frosty and Leaky :)

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #94 on: 05/16/2018 01:29 PM »
Now EV-1 and 2 move the spare PFCS to EOTP's SPDM
« Last Edit: 05/16/2018 01:32 PM by centaurinasa »

Online Chris Bergin

Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #95 on: 05/16/2018 01:33 PM »
"Frosty" has been on the ISS since arriving on Shuttle in 2001 - STS-100, Shuttle Endeavour. "Motley" arrived on SpaceX's CRS-14 Dragon mission.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #96 on: 05/16/2018 01:37 PM »
Now securing "Frosty" on EOTP "Enhanced ORU Temporary Platform"

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #97 on: 05/16/2018 01:40 PM »
PET two hours now….

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #98 on: 05/16/2018 01:43 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #99 on: 05/16/2018 01:46 PM »
Regular HAP & gloves check...

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #100 on: 05/16/2018 01:47 PM »
"Frosty" now in place !

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #101 on: 05/16/2018 01:52 PM »
Back to the ESP-1 worksite
EV-1 ingress APFR
EV-2 remove the degraded unit "Leaky"
The two EVs install the PFCS on FSE, remove the coops et replace the MLI
« Last Edit: 05/16/2018 01:56 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #102 on: 05/16/2018 02:02 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #103 on: 05/16/2018 02:04 PM »
Removing scoop...

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #104 on: 05/16/2018 02:05 PM »
Replacing MLI

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #105 on: 05/16/2018 02:07 PM »
APFR reconfig.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #106 on: 05/16/2018 02:08 PM »
Then EV2 retrieve APFR and translate to SSRMS S0  location, for his next Task

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #107 on: 05/16/2018 02:13 PM »
Tools inventory for EV-1

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #108 on: 05/16/2018 02:14 PM »
and always for EV-1,... cleanup ESP-1 worksite (retrieve crew lock bag and WIF ("Worsite InterFace") extender

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #109 on: 05/16/2018 02:17 PM »
View of EV-2 ready to install his APFR on SSRMS's End Effector
« Last Edit: 05/16/2018 02:18 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #110 on: 05/16/2018 02:19 PM »
Scott Tingle (SSRMS Operator) and Norishige Kanai is at robotic work station in Cupola
« Last Edit: 05/16/2018 02:41 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #111 on: 05/16/2018 02:26 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #112 on: 05/16/2018 02:27 PM »
EV-1 back to the airlock (where he stow the WIF extender and crew lock bag)
Then, he retrieve ORU bag with spare camera group and scoop

Offline Rondaz

  • Full Member
  • **
  • Posts: 248
  • Liked: 58
  • Likes Given: 103
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #113 on: 05/16/2018 02:35 PM »
ISS Daily Summary Report – 5/15/2018

Extravehicular Activity (EVA) Preparations: In preparation for tomorrow’s US EVA 50 Pump and Flow Control Subassembly (PFCS) Relocate, the crew printed off their suit cuff checklists and finalized their EVA tool configurations. Once completed, the crew performed an audit of their EVA tool configuration and reviewed the EVA briefing package which includes a detailed timeline of their scheduled activities and procedures for dealing with off-nominal situations.  The crew also participated in a conference with ground EVA specialists and discussed their review of the briefing packet.  The crew is scheduled to egress the airlock at 7:15 AM CDT tomorrow morning.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #114 on: 05/16/2018 02:39 PM »
APFR "Articulating Portable Foot Restraint"

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #115 on: 05/16/2018 02:42 PM »
Robotic transfert to Camera Port 13 worksite
« Last Edit: 05/16/2018 02:47 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #116 on: 05/16/2018 02:52 PM »
« Last Edit: 05/16/2018 02:54 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #117 on: 05/16/2018 02:57 PM »
EV-2 install scoop on failed Camera groupand then remove and temp sto the camera group unit on the lab

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #118 on: 05/16/2018 03:03 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #119 on: 05/16/2018 03:06 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #120 on: 05/16/2018 03:10 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #121 on: 05/16/2018 03:18 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #122 on: 05/16/2018 03:21 PM »
EV-1 return to the airlock for temp stowing the failed camera in equipment lock
Meanwile EV-2 bolt the new camera group in place

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #123 on: 05/16/2018 03:25 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #124 on: 05/16/2018 03:27 PM »
« Last Edit: 05/16/2018 03:30 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #125 on: 05/16/2018 03:29 PM »
ORU bag

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #126 on: 05/16/2018 03:34 PM »
Butch: "Good install, you can stow your PGT"

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #127 on: 05/16/2018 03:38 PM »
PET 4 hours...

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #128 on: 05/16/2018 03:41 PM »
EVA-50 officer Jordan Lindsey at console

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #129 on: 05/16/2018 03:42 PM »
Tool inventory for EV-2
« Last Edit: 05/16/2018 03:43 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #130 on: 05/16/2018 03:47 PM »
EV-1 at Z1 truss, for SGTRC "Space to Ground Transmission Receiver controller" R&R task.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #131 on: 05/16/2018 03:49 PM »

Online Chris Bergin

Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #132 on: 05/16/2018 03:54 PM »
Arm in motion.
« Last Edit: 05/16/2018 03:54 PM by Chris Bergin »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #133 on: 05/16/2018 03:55 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #134 on: 05/16/2018 03:57 PM »
From EV-2 helmet cam

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #135 on: 05/16/2018 03:58 PM »
EV-2 transtalion at the end of SSRMS back to SO location

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #136 on: 05/16/2018 04:02 PM »
EV-2 out of APFR

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #137 on: 05/16/2018 04:13 PM »
EV 1 & 2 are in the process of completing their respective tasks

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #138 on: 05/16/2018 04:16 PM »
View of the two spacewalkers at their respective worksites
« Last Edit: 05/16/2018 04:18 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #139 on: 05/16/2018 04:25 PM »
MCC-H thinking about some get-ahead tasks….
« Last Edit: 05/16/2018 04:28 PM by centaurinasa »

Online Chris Bergin

Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #140 on: 05/16/2018 04:28 PM »
All Primary EVA-50 tasks have been completed.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #141 on: 05/16/2018 04:30 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #142 on: 05/16/2018 04:35 PM »
EV-2 at his ELC-2 worksite
« Last Edit: 05/16/2018 04:44 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #143 on: 05/16/2018 04:40 PM »
Butch at work, EVAs are Always "team job"...

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #144 on: 05/16/2018 04:47 PM »
Meanwile EV-1 install some handrail, Radiator Grapple Bar (RGB)....
« Last Edit: 05/16/2018 04:49 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #145 on: 05/16/2018 04:56 PM »
EV-2 "unbolt" MLI cover on spare DCSU at ELC-2 platform
« Last Edit: 05/16/2018 05:03 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #146 on: 05/16/2018 05:02 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #147 on: 05/16/2018 05:05 PM »
DCSU's MLI now in bag
« Last Edit: 05/16/2018 05:05 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #148 on: 05/16/2018 05:08 PM »
The two EVers at the final step of their Get ahead task...
« Last Edit: 05/16/2018 05:09 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #149 on: 05/16/2018 05:19 PM »
DCSU without thermal cover.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #150 on: 05/16/2018 05:21 PM »
« Last Edit: 05/16/2018 05:27 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #151 on: 05/16/2018 05:49 PM »
All primary task and get-ahead complete, back to the airlock

Online Chris Bergin

Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #152 on: 05/16/2018 05:53 PM »
*Knocking on the hatch window:

"Anyone home! ANYONE HOME! Trick or Treat"

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #153 on: 05/16/2018 05:56 PM »
UAI "Umbilical Interface Assembly " Inside Quest airlock
« Last Edit: 05/16/2018 05:58 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #154 on: 05/16/2018 05:59 PM »
Norishige Inside Equipment lock

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #155 on: 05/16/2018 06:00 PM »
EV-1 at the porch...

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #156 on: 05/16/2018 06:08 PM »
External hatch closed
« Last Edit: 05/16/2018 06:09 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #157 on: 05/16/2018 06:11 PM »

Online Chris Bergin

Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #158 on: 05/16/2018 06:14 PM »
EVA-50 Concludes, almost exactly 6 hirs 30 mins!

ARTICLE:
https://www.nasaspaceflight.com/2018/05/eva-50-feustel-arnold-spacewalk-double-may/ - by Pete Harding

Amazing work from centaurinasa.

I want to see over 2000 likes on that profile by the end of the day!

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #159 on: 05/16/2018 06:15 PM »
Repressurization underway

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #160 on: 05/16/2018 06:21 PM »
EVA-50 duration 6 hours 31 minutes, end at 18h10 UTC

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #161 on: 05/16/2018 06:22 PM »
...Amazing work from centaurinasa...
  :-[ and  :)

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #162 on: 05/16/2018 06:23 PM »
6.5 psi

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #163 on: 05/16/2018 06:31 PM »
Passing 14 psi

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #164 on: 05/16/2018 06:33 PM »
Equalization complete.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #165 on: 05/16/2018 06:33 PM »
Now opening the hatch

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #166 on: 05/16/2018 06:35 PM »
EV-2 first out...

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #167 on: 05/16/2018 06:36 PM »
Undonnig SAFER.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #168 on: 05/16/2018 06:37 PM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #169 on: 05/16/2018 06:39 PM »
Now, EV-1...
« Last Edit: 05/16/2018 06:40 PM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #170 on: 05/16/2018 06:45 PM »
Photographic documentation of gloves.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #171 on: 05/16/2018 06:57 PM »
End of NASA TV coverage and thanks to Gary Jordan , our PAO !

Online catdlr

  • Member
  • Senior Member
  • *****
  • Posts: 5504
  • Viewed launches since the Redstones
  • Marina del Rey, California, USA
  • Liked: 2122
  • Likes Given: 1482
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #172 on: 05/17/2018 06:11 AM »
NASA astronaut totally forgot his GoPro SD in space

Source:  https://www.cnet.com/news/nasa-astronaut-totally-forgot-his-gopro-sd-card-in-space/


KING OF TWITCH
Published on May 16, 2018
Astronaut forgets SD card for GoPro OMEGALUL
If you enjoyed the video, give us a thumbs up!
Subscribe for more amazing videos!
Clip Details :
- Streamer : nasa (https://www.twitch.tv/nasa)
- Game : Reality
- Clipped by HarveyWEINSTElN

Twitch video: https://www.twitch.tv/videos/261957944?t=2h9m7s

YouTube Clip:

https://www.youtube.com/watch?v=8XAibqA-BTc?t=001



« Last Edit: 05/17/2018 06:18 AM by catdlr »
Tony De La Rosa

Offline Lewis007

  • Full Member
  • ****
  • Posts: 1328
  • the Netherlands
  • Liked: 310
  • Likes Given: 90
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #173 on: 05/17/2018 07:15 AM »
Video of the entire EVA (except ingress)



Video of Arnold & Feustel back inside Quest airlock



Offline Lewis007

  • Full Member
  • ****
  • Posts: 1328
  • the Netherlands
  • Liked: 310
  • Likes Given: 90
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #174 on: 05/17/2018 07:22 AM »
Some EVA pics posted by Artemyev.

More can be found here:
http://artemjew.ru/en/2018/05/16/eva-50-preparation/

Offline Rondaz

  • Full Member
  • **
  • Posts: 248
  • Liked: 58
  • Likes Given: 103
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #175 on: 05/17/2018 02:06 PM »
ISS Daily Summary Report – 5/16/2018

US EVA 50 Pump and Flow Control Subassembly (PFCS) Relocate: Today Drew Feustel (EV-1) and Ricky Arnold (EV-2) executed US EVA #50. The following tasks were accomplished during the EVA:

A swap of the Pump/Flow Control Subassemblies (PFCS) between the Enhanced ORU Transfer Platform (EOTP) and External Stowage Platform (ESP)-1 locations
Removal and Replacement (R&R) of the Camera Port #13 (CP13) External Television Camera Group (ETVCG)
R&R of the degraded Space to Ground Transmitter Receiver Controller (SGTRC)
Installation of the S1 forward and aft RGB T-handles
S1-FHRC strut preps
ELC2 spare DCSU MLI removal and MLI skirt tie backs
The Phase Elapsed Time (PET) for US EVA #50 was 6h 31m.

Mobile Servicing System (MSS) Operations: This afternoon & evening, robotics controllers are performing post-EVA operations to unstow the Special Purpose Dexterous Manipulator (SPDM) with the Space Station Remote Manipulator System (SSRMS).  Once the SPDM is unstowed, the MT will be translated from Worksite (WS) 6 to WS 8 in preparation for tomorrow night’s transfer and install of the spare Pump Flow and Control Subsystem (PFCS) from the SPDMs Enhanced ORU Temporary Platform (EOTP) to the P6 long spacer.  These activities will allow ground controllers to gain insight into the PFCS to perform a firmware update and a Flow Control Valve (FCV) functional checkout.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1575
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #176 on: 05/17/2018 05:53 PM »
Post EVA Ops (A/L deconfig/restow, EMU Water recharge, debrief)

Offline Joachim

  • Full Member
  • *
  • Posts: 184
  • Mainz, Germany
    • SPACEFACTS
  • Liked: 68
  • Likes Given: 238
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #177 on: 05/18/2018 05:27 AM »
From Oleg

Offline Rondaz

  • Full Member
  • **
  • Posts: 248
  • Liked: 58
  • Likes Given: 103
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #178 on: 05/18/2018 01:55 PM »
ISS Daily Summary Report – 5/17/2018

Post-Extravehicular Activity (EVA) Crew Activities:  Today the crew performed Post-EVA medical evaluations, airlock reconfigurations, and a water recharge on the Extravehicular Mobility Units (EMUs) used during the EVA.  They also conducted an EVA debrief with ground specialists.

Mobile Servicing System (MSS) Operations: Overnight, robotics controllers supported post-EVA operations by unstowing the Special Purpose Dexterous Manipulator (SPDM) with the Space Station Remote Manipulator System (SSRMS) and translating the Mobile Transporter (MT) from Worksite (WS) 6 to WS 8. Today, ground controllers used the MSS to transfer and install of the spare Pump Flow and Control Subsystem (PFCS) to the P6 long spacer.  After the PFCS has was transferred, the ground robotics team began a series of follow-on tasks to get the MSS ready for OA-9 capture and berthing on Thursday, May 24.

Post-Extravehicular Activity (EVA) Hardware Checkouts: Once the ground robotics flight controllers completed relocating the spare PFCS to the P6 long spacer, ground controllers were able to regain insight into the PFCS and perform a firmware prefresh. A checkout of the ammonia Flow Control Valve (FCV) is planned for tomorrow. Ground controllers were also able to verify proper functionality of the new Space to Ground Transmitter Receiver Controller (SGTRC) and the Camera Port #13 (CP13) External Television Camera Group (ETVCG).

Offline Rondaz

  • Full Member
  • **
  • Posts: 248
  • Liked: 58
  • Likes Given: 103
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #179 on: 05/21/2018 06:30 PM »
ISS Daily Summary Report – 5/18/2018

Mobile Servicing System (MSS) Operations: Overnight, robotics controllers completed relocation of the Pump Flow and Control Subsystem (PFCS) to the P6 long spacer and began the follow up tasks required to get the MSS ready for OA-9 capture on Thursday, May 24. The Space Station Remote Manipulator System (SSRMS) and Special Purpose Dexterous Manipulator (SPDM) were translated on the Mobile Transporter (MT) from Work Site (WS) 8 to WS 4 where the SPDM was stowed on the Mobile Base Station (MBS) #2 and the SSRMS was walked off to the Node 2 Power Data Grapple Fixture (PDGF). The Node 2 PDGF is the SSRMS base location used for capturing ISS visiting vehicles that are berthed to either the Node 2 or Node 1 Nadir CBMs.

Offline SMS

  • Regular
  • Full Member
  • ****
  • Posts: 840
    • Astronauts & their spaceflights
  • Liked: 217
  • Likes Given: 147
Re: ISS U.S. EVA-50 - May 16, 2018
« Reply #180 on: 05/22/2018 08:46 PM »
Some photos hi-res from EVA-50 (by NASA Johnson):

Quote
iss055e071274 (May 16, 2018) --- Astronaut Drew Feustel takes an out-of-this-world selfie, or "space-selfie," during a spacewalk on May 16 to swap thermal control gear.

iss055e071274a (May 16, 2018) --- Astronaut Ricky Arnold takes an out-of-this-world selfie, or "space-selfie," during a spacewalk on May 16 to swap thermal control gear.

iss055e071438 (May 16, 2018) --- Astronaut Drew Feustel is pictured outside of the Tranquility module during a spacewalk on May 16 to swap thermal control gear.

iss055e071458 (May 16, 2018) --- Astronaut Drew Feustel is pictured outside of the International Space Station during a spacewalk on May 16 to swap thermal control gear.

iss055e071501 (May 16, 2018) --- Astronaut Drew Feustel is pictured outside of the International Space Station during a spacewalk on May 16 to swap thermal control gear.

iss055e071506 (May 16, 2018) --- Astronaut Ricky Arnold takes an out-of-this-world selfie, or "space-selfie," during a spacewalk on May 16 to swap thermal control gear.
« Last Edit: 05/22/2018 08:51 PM by SMS »
---
SMS ;-).

Tags: