12:43 a.m. EDT (0443 UTC)T+plus 28 minutes, 27 seconds. The second main engine cutoff, or MECO-2, is confirmed for Centaur, completing the next step towards the targeted orbit to deploy AEHF-4. The rocket now begins a three-hour coast away from Earth to reach the proper point in space for the morning’s third burn by the upper stage to optimize the orbit for payload release.