https://twitter.com/r_isro/status/1490414279496978436
Two official communiqué from Institute of Plasma Research, Gandhinagar and CSIR-CEERI, Pilani suggest PSLV-C54 would carry Technology Demonstration Satellite 01 (TDS-01) which is supposed to host demonstrators for Electric Propulsion system, indigenous atomic clock and Travelling Wave Tube Amplifier (TWTA).
https://pib.gov.in/PressReleseDetailm.aspx?PRID=1814043QuoteDr Jitendra Singh today gave the details of the upcoming ISRO space missions planned in 2022 in a written reply to a question in the Lok Sabha as follows: a) 2 Polar Satellite Launch Vehicle (PSLV) missions including 1 dedicated commercial mission and 1 mission for launching the EOS-06 earth observation satellite b) 2 developmental flights of ISRO’s Small Satellite Launch Vehicle (SSLV) c) 1 Geosynchronous Satellite Launch Vehicle (GSLV) mission for launching NVS-01 navigation satellite for NavIC d) 1 communication satellite mission (GSAT-24) through procured launch for commercial customer e) 1 Geosynchronous Satellite Launch Vehicle – Mark III (GSLV Mk-III) mission, which is a dedicated commercial mission
Dr Jitendra Singh today gave the details of the upcoming ISRO space missions planned in 2022 in a written reply to a question in the Lok Sabha as follows: a) 2 Polar Satellite Launch Vehicle (PSLV) missions including 1 dedicated commercial mission and 1 mission for launching the EOS-06 earth observation satellite b) 2 developmental flights of ISRO’s Small Satellite Launch Vehicle (SSLV) c) 1 Geosynchronous Satellite Launch Vehicle (GSLV) mission for launching NVS-01 navigation satellite for NavIC d) 1 communication satellite mission (GSAT-24) through procured launch for commercial customer e) 1 Geosynchronous Satellite Launch Vehicle – Mark III (GSLV Mk-III) mission, which is a dedicated commercial mission
Is this the commercial mission referred to in a)?Might this launch also be a commercial rideshare mission?
In 2nd dedicated mission, NSIL to launch 3 Singapore satellites by the end of June [June 14]Quotethree satellites from Singapore, including the main earth observation satellite, will together weigh a little more than 500kg...launch will be on the PSLV-C53 mission
three satellites from Singapore, including the main earth observation satellite, will together weigh a little more than 500kg...launch will be on the PSLV-C53 mission
IN-SPACe launch manifesto has been released:QuoteQ4 FY 2023-24: (1 January 2024 - 30 March 2024)- PSLV C58 / ISRO Payload XPoSat + POEM-3 with 9 payloads- GSLV F14 / ISRO Payload Insat-3DS- AGNIBAAN-SORTeD (Suborbital mission)- SSLV D3 / ISRO Primary Payload, Space Rickshaw & IITMSatFY 2024-25 Commercial Missions:Q1: (1 April 2024 - 30 June 2024)- PSLV C59 / NSIL Primary Payload, SCOT, CGUSAT, LEAP-1- VIKRAM-1: TBDQ2: (1 July 2024 - 30 September 2024)- LVM3 M5 / NSIL Payload- VIKRAM-1: TBDQ3: (1 October 2024 - 31 December 2024)- PSLV C62 / PROBA-3- PSLV N1 / TDS-01- SSLV S1 / TBD, PARIKSHIT- VIKRAM-1: TBD- AGNIBAAN: TBDQ4: (1 January 2025 - 30 March 2025)- PSLV N2 / TBD, Aadyah, DRISHTI, Sanskardhaam, DS P30- SSLV S2 / TBD, Azista60°- VIKRAM-1: TBD- AGNIBAAN: TBDFY 2024-25 ISRO/User-funded Missions: (No specific quarters given)- PSLV C60 / ISRO Payload + POEM-4- GSLV F15 / ISRO Payload- PSLV C61 / ISRO Payload- GSLV F16 / ISRO Payload- PSLV C63 / ISRO Payloads- GSLV F17 / ISRO PayloadNote:[...]- In addition, seven test launches pertaining to Gaganyaan are also scheduled during the period.[...]
Q4 FY 2023-24: (1 January 2024 - 30 March 2024)- PSLV C58 / ISRO Payload XPoSat + POEM-3 with 9 payloads- GSLV F14 / ISRO Payload Insat-3DS- AGNIBAAN-SORTeD (Suborbital mission)- SSLV D3 / ISRO Primary Payload, Space Rickshaw & IITMSatFY 2024-25 Commercial Missions:Q1: (1 April 2024 - 30 June 2024)- PSLV C59 / NSIL Primary Payload, SCOT, CGUSAT, LEAP-1- VIKRAM-1: TBDQ2: (1 July 2024 - 30 September 2024)- LVM3 M5 / NSIL Payload- VIKRAM-1: TBDQ3: (1 October 2024 - 31 December 2024)- PSLV C62 / PROBA-3- PSLV N1 / TDS-01- SSLV S1 / TBD, PARIKSHIT- VIKRAM-1: TBD- AGNIBAAN: TBDQ4: (1 January 2025 - 30 March 2025)- PSLV N2 / TBD, Aadyah, DRISHTI, Sanskardhaam, DS P30- SSLV S2 / TBD, Azista60°- VIKRAM-1: TBD- AGNIBAAN: TBDFY 2024-25 ISRO/User-funded Missions: (No specific quarters given)- PSLV C60 / ISRO Payload + POEM-4- GSLV F15 / ISRO Payload- PSLV C61 / ISRO Payload- GSLV F16 / ISRO Payload- PSLV C63 / ISRO Payloads- GSLV F17 / ISRO PayloadNote:[...]- In addition, seven test launches pertaining to Gaganyaan are also scheduled during the period.[...]
Cross-post; document attached to the original post.What is the significance of PSLV N1?Quote from: GewoonLukas_ on 02/08/2024 01:33 pmIN-SPACe launch manifesto has been released:QuoteQ4 FY 2023-24: (1 January 2024 - 30 March 2024)- PSLV C58 / ISRO Payload XPoSat + POEM-3 with 9 payloads- GSLV F14 / ISRO Payload Insat-3DS- AGNIBAAN-SORTeD (Suborbital mission)- SSLV D3 / ISRO Primary Payload, Space Rickshaw & IITMSatFY 2024-25 Commercial Missions:Q1: (1 April 2024 - 30 June 2024)- PSLV C59 / NSIL Primary Payload, SCOT, CGUSAT, LEAP-1- VIKRAM-1: TBDQ2: (1 July 2024 - 30 September 2024)- LVM3 M5 / NSIL Payload- VIKRAM-1: TBDQ3: (1 October 2024 - 31 December 2024)- PSLV C62 / PROBA-3- PSLV N1 / TDS-01- SSLV S1 / TBD, PARIKSHIT- VIKRAM-1: TBD- AGNIBAAN: TBDQ4: (1 January 2025 - 30 March 2025)- PSLV N2 / TBD, Aadyah, DRISHTI, Sanskardhaam, DS P30- SSLV S2 / TBD, Azista60°- VIKRAM-1: TBD- AGNIBAAN: TBDFY 2024-25 ISRO/User-funded Missions: (No specific quarters given)- PSLV C60 / ISRO Payload + POEM-4- GSLV F15 / ISRO Payload- PSLV C61 / ISRO Payload- GSLV F16 / ISRO Payload- PSLV C63 / ISRO Payloads- GSLV F17 / ISRO PayloadNote:[...]- In addition, seven test launches pertaining to Gaganyaan are also scheduled during the period.[...]
QuoteGOVERNMENT OF INDIA DEPARTMENT OF SPACE LOK SABHA UNSTARRED QUESTION NO. 426 TO BE ANSWERED ON WEDNESDAY, JULY 24, 2024426. SMT. APARAJITA SARANGI: Will the PRIME MINISTER be pleased to state: that the details of the India's space programmes and missions to be launched in the year 2024? ANSWER MINISTER OF STATE IN THE MINISTRY OF PERSONNEL, PUBLIC GRIEVANCES & PENSIONS AND IN THE PRIME MINISTER’S OFFICE (DR. JITENDRA SINGH): *** Following are the space programmes & missions planned in the year 2024. i. Three PSLV missions, two of which are technology demonstration missions (TDS-01 & SPADEX) and one dedicated commercial mission for NewSpace India Limited (NSIL) ii. One GSLV mission to launch NVS-02 Navigation Satellite iii. One SSLV mission, to launch a technology demonstration Satellite (EOS-08). iv. First unmanned flight under Gaganyaan Programme (HLVM3-G1) [...]
GOVERNMENT OF INDIA DEPARTMENT OF SPACE LOK SABHA UNSTARRED QUESTION NO. 426 TO BE ANSWERED ON WEDNESDAY, JULY 24, 2024426. SMT. APARAJITA SARANGI: Will the PRIME MINISTER be pleased to state: that the details of the India's space programmes and missions to be launched in the year 2024? ANSWER MINISTER OF STATE IN THE MINISTRY OF PERSONNEL, PUBLIC GRIEVANCES & PENSIONS AND IN THE PRIME MINISTER’S OFFICE (DR. JITENDRA SINGH): *** Following are the space programmes & missions planned in the year 2024. i. Three PSLV missions, two of which are technology demonstration missions (TDS-01 & SPADEX) and one dedicated commercial mission for NewSpace India Limited (NSIL) ii. One GSLV mission to launch NVS-02 Navigation Satellite iii. One SSLV mission, to launch a technology demonstration Satellite (EOS-08). iv. First unmanned flight under Gaganyaan Programme (HLVM3-G1) [...]
(ISRO) chairman S Somanath announced during the Sardar Patel Lecture at Akashvani that the first Technology Demonstrator Satellite, TDS-01, featuring indigenously developed electric thrusters, will be launched this December.
Is this launch still scheduled for 2024? Or, has it been delayed into 2025?Edit/add: If there are no GSLV MkII launches scheduled for the remainder of the year, then one of the three PSLV launches scheduled in December could launch from the SLP.
[NVS-02] Scheduled for NET December 31st, but could delay into January:QuoteTOI Isro gears up for multiple launchesNov 24, 2024[...]Somanath said that a third launch, that of a GSLV, carrying India’s navigation satellite NVS-2, is being targeted for Dec 31.“This GSLV was originally for Nisar. It was supposed to be launched and we couldn’t make the launch so then we got the NVS-2 NavIc satellite ready.It’s almost completed now. We need to complete this mission building another GSLV for Nisar, which is now scheduled for next year. We are aiming for Dec 31 (NavIC mission), but we’ll take a call a bit later on this. It could even be Jan,” Somanath said.
TOI Isro gears up for multiple launchesNov 24, 2024[...]Somanath said that a third launch, that of a GSLV, carrying India’s navigation satellite NVS-2, is being targeted for Dec 31.“This GSLV was originally for Nisar. It was supposed to be launched and we couldn’t make the launch so then we got the NVS-2 NavIc satellite ready.It’s almost completed now. We need to complete this mission building another GSLV for Nisar, which is now scheduled for next year. We are aiming for Dec 31 (NavIC mission), but we’ll take a call a bit later on this. It could even be Jan,” Somanath said.
NSIL signed contract with M/s HAL [Lead Partner of M/s HAL and L&T consortia] for End-to-End production of 5 Nos. of Polar Satellite Launch Vehicle (PSLV). The 1st fully Indian Industry manufactured PSLV is envisaged to be launched during Q2 of 2025.
Any new news? Has this launch been delayed beyond Q2 (end of June)?
Quote from: zubenelgenubi on 05/17/2025 05:48 amAny new news? Has this launch been delayed beyond Q2 (end of June)?I'm sure that this (and the other) PSLV launches are delayed by the investigation of the May 18 third stage failure.
SSLV acquisition strategic, we’ll look at redesign in future: HALJul 6, 2025[...]Meanwhile, HAL-L&T work on the PSLV is expected to achieve a milestone later this year. The first rocket built entirely by industry is expected to launch around Oct-Nov 2025. The contract is purely for fabrication, using Isro’s design and established supply chain. Even so, it has seen initial delays.[...]