...Rad hard video games...
Here is a list - feel free to add to it:2015-2025+ Basic missions - chemical propulsion - no rad shielding - no artificial gravity required - single (or dual) launch:1. LEO demonstration missions (30 days - 900 days) (e.g. long-term hab mission demo)2. lunar swing-by mission (7 days)3. lunar orbital mission (10 days)4. EML-1 and EML-2 (maybe even other Earth-Moon Lagrange points) (20 days)5. SML-1 and SML-2 (30-60 days)2020 - 2030+ Advanced missions - chemical propulsion - solar radiation event storm shelter partially required - no enhanced GCR shielding required but recommended - no artificial gravity required - dual launch minimum:6. NEO (meteoroids) missions to small rocks -5 to 20m diameter (100-200 days)7. Lunar sorties (14 days)8. Lunar extended stays (30-60 days)9. Mars flyby (450 days)10. Mars orbital mission - opposition class - to Deimos/Phobos (500 days)11. Mars orbital mission with Venus flyby (gravity assist) on flight back (500 days)2025-2040+ Advanced++ missions - advanced propulsion techniques recommended not required - solar radiation event storm shelter required - enhanced GCR shielding not required but recommended - no artificial gravity required but recommended if feasible - multiple launch scenario or depots required:12. Mars short-term 20-60 days surface expedition - opposition class mission (500 days)13. Lunar outpost mission (180 days)14. Advanced NEO (asteroids) missions to larger NEOs (>50m) (250-500 days)15. Long-term conjunction Phobos or Deimos mission (900 days) (GCR shielding probably required - AG maybe required)16. Venus orbital missions with upper atmosphere excursion module (500 days)2035-2050+ Expert missions - advanced propulsion techniques required - solar radiation event storm shelter required - enhanced GCR shielding required - artificial gravity recommended, maybe even required - multiple launch scenario or depots required:17. Extended 500 days on Martian surface mission (900 days or less with advanced propulsion)18. Ceres mission (1000 days or less with advanced propulsion)19. Other asteroid belt missions (Vesta, Pallas, Hygeia etc.) (1000 days or less with advanced propulsion)20. Expert NEO (comet) missions - high delta-v required (length depending on availability)21. Mercury orbital and landing mission - high delta-v required (600 days)
9. Mars flyby (450 days)
This allowed two Mars expedition spacecraft to travel in convoy on the mission together, providing Von Braun's preferred mutual support and back-up.
My problem with Flexible Path is it appears to ignore the radiation issues. If we have not solved it, you can't send a crew on a 200 day mission to a NEO, or much anyplace else other than the moon.
It would be nice if one of those NEO missions was a technology demonstrator in possible deflection techniques.P
How feasible is biological remediation of radiation damage?....
It would be nice if one of those NEO missions was a technology demonstrator in possible deflection techniques.