ISS Daily Summary Report – 3/19/2018EVA Tool Gather and Configuration: The crew gathered and configured tools and hardware for US Extravehicular Activity (EVA) 49: N3 Enhanced Wireless Communication (EWC) & Camera Port (CP) 8 and US EVA 50: Pump Flow and Control Subsystem (PFCS) Relocate.
ISS Daily Summary Report – 3/21/2018Radiator Beam Valve Module (RBVM) Reposition: Today ground specialists repositioned the RBVM P1-3-2 from the Closed to Vent position in order to purge any remaining ammonia in the P1-3-2 Radiator flow path in preparation for next week’s US EVA 49. The P1-3-2 RBVM supply and return jumpers are tasked to be removed during the EVA and brought inside ISS for future return to Earth.
https://blogs.nasa.gov/stationreport/2018/03/QuoteISS Daily Summary Report – 3/19/2018EVA Tool Gather and Configuration: The crew gathered and configured tools and hardware for US Extravehicular Activity (EVA) 49: N3 Enhanced Wireless Communication (EWC) & Camera Port (CP) 8 and US EVA 50: Pump Flow and Control Subsystem (PFCS) Relocate. Do we have a specific date for US EVA 50?The question is, which PFCS they will relocate. The new one , which will go in the SpX-14 trunk to the ISS, or the used one, which will go down in SpX-14.