Re: Indian launch schedule
« Reply #1840 on: 08/14/2024 02:22 pm »
NVS-02 to be launched by GSLV by the end of 2024
source

Offline input~2

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 6828
  • Liked: 1563
  • Likes Given: 564

Offline zubenelgenubi

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 12945
  • Arc to Arcturus, then Spike to Spica
  • Sometimes it feels like Trantor in the time of Hari Seldon
  • Liked: 8705
  • Likes Given: 85511
Re: Indian launch schedule
« Reply #1842 on: 10/28/2024 07:11 pm »
Four remaining 2024 orbital launches; other launches presumably delayed to 2025:
<snip>
There are three remaining PSLV launches this (chronological) year.

No explicit mention [of Anvesha] here; [NVS-02 launches on GSLV MkII; EOS-08 launched on August 16 UTC]; document attached to original post:
Quote
GOVERNMENT OF INDIA DEPARTMENT OF SPACE LOK SABHA UNSTARRED QUESTION NO. 426 TO BE ANSWERED ON WEDNESDAY, JULY 24, 2024

426. SMT. APARAJITA SARANGI:
Will the PRIME MINISTER be pleased to state: that the details of the India's space programmes and missions to be launched in the year 2024?

ANSWER
MINISTER OF STATE IN THE MINISTRY OF PERSONNEL, PUBLIC GRIEVANCES & PENSIONS AND IN THE PRIME MINISTER’S OFFICE (DR. JITENDRA SINGH):
***
Following are the space programmes & missions planned in the year 2024.
i. Three PSLV missions, two of which are technology demonstration missions (TDS-01 & SPADEX) and one dedicated commercial mission for NewSpace India Limited (NSIL)
ii. One GSLV mission to launch NVS-02 Navigation Satellite
iii. One SSLV mission, to launch a technology demonstration Satellite (EOS-08).
iv. First unmanned flight under Gaganyaan Programme (HLVM3-G1)
[...]

PROBA-3:
Quote
Proba-3 double satellites set for launch following last test
04/10/2024

[...]

Now its testing is complete, Proba-3 will now be shipped to the Satish Dhawan Space Centre in India on 21 October for a planned launch by PSLV-XL launcher on 29 November.

[...]

SPADEX:
Goal is to launch this mission No Later Than December 15th:
Quote from: Chetan Kumar tweet
…Currently Spadex satellites are under integration. It will be completed in a month’s time. Then it will go for full-fledged testing, demonstration of simulation and everything. We’re hoping to have a launch before Dec 15.” [Oct 14]

TDS-01; aboard PSLV N1:
Quote
(ISRO) chairman S Somanath announced during the Sardar Patel Lecture at Akashvani that the first Technology Demonstrator Satellite, TDS-01, featuring indigenously developed electric thrusters, will be launched this December.
source [Oct 26]

HLVM3-G1 delayed; document attached to original post:
Delayed to February-March 2025 according to a tender by ISRO TELEMETRY TRACKING AND COMMAND NETWORK (ISTRAC)  for communications with the ships supporting the mission.

[zubenelgenubi: See document Paragraph 10.34]



See here for discussion of less-discussed and to be launched GSAT satellites:
https://forum.nasaspaceflight.com/index.php?topic=32023.msg2612637#msg2612637

GSAT-21 may be extinct.
GSAT N3 = GSAT-32 = replacement for GSAT-6.
« Last Edit: 10/28/2024 07:53 pm by zubenelgenubi »
Support your local planetarium! (COVID-panic and forward: Now more than ever.) My current avatar is saying "i wants to go uppies!" Yes, there are God-given rights. Do you wish to gainsay the Declaration of Independence?

Online GewoonLukas_

  • Full Member
  • ****
  • Posts: 1737
  • Lukas C. H.
  • Netherlands
  • Liked: 4252
  • Likes Given: 2019
Re: Indian launch schedule
« Reply #1843 on: 11/15/2024 06:05 am »
ISRO has been contracted to launch the 1st BlueBird Block 2 satellite using their LVM3 rocket:

Quote
AST SpaceMobile leans on Blue Origin to ramp up satellite launches
November 14, 2024

AST SpaceMobile said Nov. 14 it has booked rockets from Blue Origin and others to deploy [...] satellites between 2025 and 2026 [...].

[...]

Founder Abel Avellan, AST SpaceMobile’s CEO and chair, said during an earnings call with analysts that India’s GSLV is first up and will launch a single Block 2 BlueBird.

He said two SpaceX Falcon 9 rockets carrying four Block 2 BlueBirds each would probably come next, followed by successive Blue Origin New Glenn rockets, which have a fairing big enough to deploy eight of the satellites at a time to low Earth orbit (LEO).

[...]

The launch window for this satellite was previously reported to be December 2024 - March 2025.
« Last Edit: 11/15/2024 12:18 pm by GewoonLukas_ »
Lukas C. H. • Hobbyist Mission Patch Artist 🎨 • May the force be with you my friend, Ad Astra Per Aspera ✨️

Offline input~2

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 6828
  • Liked: 1563
  • Likes Given: 564
Re: Indian launch schedule
« Reply #1844 on: 11/19/2024 04:23 pm »
Launched in 2024
January 1, 0340 UTC - PSLV-DL C58 - XPoSat - FLP
Feb 17, 1205 UTC - GSLV F14 - Insat-3DS - SLP
August 16 0347 UTC - SSLV D3  - EOS-08 & SR-0 Demosat - FLP
Dec 5, 1034Z - PSLV XL C59 - FLP - Proba-3 (2 S/C)

Planned launches
Dec 20, 2024 - PSLV - Spadex (2 S/C)
Jan 6, 2025 - GSLV - NVS-02 (IRNSS-1K)
2025 - PSLV - TDS-01
March 2025 - HLVM3-G1 - GaganYaan Demo 1
2025 - PSLV - THEOS-2A
2025 - PSLV-XL C60 - EOS-09 (RISAT-1B) - FLP
      - GSLV - EOS-05 (aka GISAT-2) 
     - PSLV - Resourcesat-3B
2025-02 - GSLV - NISAR (NASA-ISRO SAR sat)
2025 - HLVM3-G2 - GaganYaan Demo 2
     - PSLV - Cartosat-3A
     - PSLV - RISAT-2A
     - GSLV - GSAT-7R (Indian Navy)
     - GSLV - GSAT-7B (IAF)
     - GSLV MkIII - IDRSS-1
2025-H1 - GSLV - GSAT-32 (repl. for GSAT-6A)
2025 - PSLV - Resourcesat-3
2025-11 - PSLV - Oceansat-3A
2025 - PSLV - Resourcesat-3S
2026 - PSLV - Resourcesat-3A
2026 - PSLV - Resourcesat-3SA
      - GSLV MkIII - IDRSS-2     
     - PSLV - HRSAT (3 s/c)
     - PSLV - Cartosat-3B
     - Vikram-1 - test launch
2026-SSLV - Optimus (for Australia)
2026-12 - tbd - Trishna
2026 - HLVM3-H1 - GaganYaan (manned mission)
2028-03 - LVM-3 - Venus Orbiter Mission

Updated November 25
Updated November 28
Updated December 4
Updated December 5
Updated December 7
« Last Edit: 12/07/2024 02:53 pm by input~2 »

Tags: ISRO PSLV 
 

Advertisement NovaTech
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
1