3 more PSLV launches are to be performed before the end of this year
http://www.aprsaf.org/data/aprsaf17_data/D3-1045_P_S_Roy.pdf
http://www.isro.org/rep2011/citizens.htm#
In the last update of the launch schedule, GSAT-14 appears as being approved. Does this mean the spacecraft is now under construction?
El primer satélite letón Venta-1 será lanzado hasta finales de 2011desde un cosmódromo en la India, informaron hoy fuentes del Centro Internacional de Radioastronomía de Ventspils (VIRAC).
http://www.rian.ru/science/20110421/366869045.html
Hi MA,According to the 2010-2011 ISRO annual report GSAT-14 is planned to be launched by GSLV with indigenous cryogenic upper stage.As the satellite appears in ISRO last mission profile for a launch in FY 2011/2012, we can assume it has been approved and is under construction! GSAT-14 seems to be the candidate for GSLV-MKII (i.e. with Indian-made cryogenic upper stage) return to flight after the April 2010 failure; this launch is now tentatively announced for the second part of 2012.
Quote from: input~2 on 04/21/2011 04:22 pmHi MA,According to the 2010-2011 ISRO annual report GSAT-14 is planned to be launched by GSLV with indigenous cryogenic upper stage.As the satellite appears in ISRO last mission profile for a launch in FY 2011/2012, we can assume it has been approved and is under construction! GSAT-14 seems to be the candidate for GSLV-MKII (i.e. with Indian-made cryogenic upper stage) return to flight after the April 2010 failure; this launch is now tentatively announced for the second part of 2012. From the Mission Profile posted above, there is only GSLV D4 flying in the FY 2011-12. This, ISRO, Chairman said will fly with a Russian cryo to check out the vehicle design. So, the GSAT-14 would likely fly on a GSLV Mk-I. - Pradeep
GSAT-14The spacecraft weighs around 2050 kg and is planned to be launched by GSLV with indigenous cryogenic upper stage.
ISRO is planning to undertake the next developmental flight of GSLV (GSLV-D4) using the Indigenous Cryogenic Stage. The mission aims at flight testing of Indigenous Cryogenic engine & Stage. The launch of GSLV-D4 is planned for 1st quarter 2012.FEBRUARY 23, 2011