Re: Gateway Updates Thread
« Reply #80 on: 05/28/2021 08:39 pm »
KEY ACHIEVEMENTS PLANNED FOR FY 2022
A Gateway Program PDR Sync Review is planned for Q2 of FY 2022 in preparation for KDP-I. An Agency Baseline Commitment (ABC) and a Program Commitment Agreement (PCA) will be established at this KDP.
The HALO and PPE elements will conduct their Critical Design Reviews in Q2 of FY 2022.
A CMV launch vehicle Mission-Specific Preliminary Design Review is targeted for Q3 of FY 2022.
Thales Alenia Space Italy will be delivering the habitable element for HALO in Q4 of FY 2022, which will enable the start of the Assembly, Integration, and Testing cycle for HALO.  :)
A CMV (PPE & HALO) Sync Point #2 is targeted for Q4 of FY 2022.

Offline yg1968

  • Senior Member
  • *****
  • Posts: 19268
  • Liked: 8667
  • Likes Given: 3517
Re: Gateway Updates Thread
« Reply #81 on: 06/02/2021 01:01 pm »

Offline FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 57753
  • UK
    • Plan 28
  • Liked: 94842
  • Likes Given: 44764
Re: Gateway Updates Thread
« Reply #82 on: 07/09/2021 03:26 pm »
https://www.nasa.gov/press-release/nasa-northrop-grumman-finalize-moon-outpost-living-quarters-contract/

Quote
Jul 9, 2021
RELEASE 21-092

NASA, Northrop Grumman Finalize Moon Outpost Living Quarters Contract

NASA and Northrop Grumman of Dulles, Virginia, have finalized a contract to develop the Habitation and Logistics Outpost (HALO) for Gateway, which will be a critical way station and outpost in orbit around the Moon as part of NASA’s Artemis program.

NASA and its commercial and international partners are building Gateway to support science investigations and enable surface landings at the Moon, which will help prepare astronauts for future missions to Mars.

The firm, fixed-price contract is valued at $935 million. Under the contract, Northrop Grumman will be responsible for attaching and testing the integrated HALO with the Power and Propulsion Element (PPE), being built by Maxar Technologies. Northrop Grumman will also lead the integrated PPE and HALO spacecraft turnover and launch preparation with SpaceX, and support activation and checkout of HALO during the flight to lunar orbit. NASA is targeting November 2024 to launch the integrated spacecraft on a SpaceX Falcon Heavy rocket.

“NASA is building the infrastructure to expand human exploration further out into the solar system than ever before, including Gateway, the lunar space station that will help us make inspirational scientific discoveries at and around the Moon. Just as importantly, these investments will help NASA carry out the United States’ horizon goal: to further develop and test the technology and science needed for a human trip to Mars,” said NASA Administrator Bill Nelson. “The HALO is a critical component of Gateway, and this exciting announcement today brings us one step closer to landing American boots on both the Moon and Mars.”

HALO is where astronauts will live and conduct research while visiting the Gateway. The pressurized living quarters will provide command and control systems for the lunar outpost, and docking ports for visiting spacecraft, such as NASA’s Orion spacecraft, lunar landers, and logistics resupply craft. The HALO module will serve as the backbone for command and control and power distribution across Gateway and will perform other core functions, including hosting science investigations via internal and external payload accommodations and communicating with lunar surface expeditions. HALO also will enable the aggregation of additional habitable elements to expand Gateway capabilities. Immediately after launch, the Heliophysics Environmental and Radiation Measurement Experiment Suite, built by NASA’s Goddard Space Flight Center in Greenbelt, Maryland, will begin conducting research outside of the integrated spacecraft.

“This is a major step on the path for Artemis, not just for NASA, but for the combined team, including our commercial and international partners,” said Kathy Lueders, NASA associate administrator for Human Explorations and Operations. “Gateway will provide unprecedented access to the Moon and symbolizes the expansion of our partnerships into deep space.”

The integrated PPE and HALO will be the Gateway’s foundation, enabling humanity’s first permanent outpost in orbit around the Moon. Located tens of thousands of miles from the lunar surface at its farthest point and within easy range of lunar landers at its closest, the Gateway will be in a near-rectilinear halo orbit. This orbit will allow NASA and its international and commercial partners to conduct unprecedented deep space science and technology investigations, and conduct sustainable lunar exploration.

“This action puts in place the final contract component of a diverse, multi-faceted team –distributed across the country and within some international partner facilities – working together to create and implement the initial Gateway capability. We are excited to work with Northrop Grumman and all the partners to deliver the cornerstone of sustainable human exploration in cis-lunar space,” said Dr. Jon Olansen, NASA’s manager of the HALO project.

HALO leverages contributions from the Gateway international partners for robust capabilities. Batteries provided by the Japan Aerospace Exploration Agency (JAXA) will power HALO until PPE solar arrays can be deployed and during eclipse periods. Robotic interfaces provided by the Canadian Space Agency will host payloads and provide base points for Canadarm3 robotic operations. ESA (European Space Agency) will provide a lunar communications system to enable high-data-rate communications between the lunar surface and Gateway. With three docking ports, HALO will be the hub for international Gateway expansion in the future, including an international habitat that ESA and JAXA will provide, and an ESA-provided refueling module. The docking ports also will host a human landing system for lunar surface expeditions and logistics resupply spacecraft. As the Gateway hub, HALO will provide power, data, airflow to each of these ports, as well as thermal conditioning to assist future elements and spacecraft in controlling the temperature of their equipment and habitable environment.

“Leveraging our success with our Cygnus spacecraft, Northrop Grumman is perfectly positioned to deliver the HALO module, a critical piece for NASA’s Artemis program and our journey to the Moon and beyond,” said Frank DeMauro, vice president and general manager for tactical space systems at Northrop Grumman. “After recently completing a successful preliminary design review, we now look forward to completing the detailed design efforts and eventually bringing HALO to life in our Gilbert, Arizona, facility while also providing integration services for the final, combined vehicle before launch.”

HALO’s design is based on Northrop Grumman’s Cygnus spacecraft, which has completed 15 resupply missions to the International Space Station to date. A previous contract for HALO, awarded in June 2020, funded work through preliminary design review, one of a series of checkpoints for the complex engineering project. The review process for the module, completed in May, assessed all of the spacecraft’s design to ensure the overall system is safe and reliable for flight and meets NASA’s mission requirements.

Explore more details about NASA’s Gateway program at:

http://www.nasa.gov/gateway

-end-

Offline yg1968

  • Senior Member
  • *****
  • Posts: 19268
  • Liked: 8667
  • Likes Given: 3517
Re: Gateway Updates Thread
« Reply #83 on: 07/09/2021 04:42 pm »
As background information, there was already a cost-plus contract for HALO (see link below). NASA was negotiating with NG to change it into a fixed price contract. So the negotiation has now been finalized for a $935M fixed price contract which is obviously good news for the Gateway.

https://www.nasa.gov/press-release/nasa-awards-northrop-grumman-artemis-contract-for-gateway-crew-cabin
« Last Edit: 07/09/2021 08:54 pm by yg1968 »

Offline yg1968

  • Senior Member
  • *****
  • Posts: 19268
  • Liked: 8667
  • Likes Given: 3517
Re: Gateway Updates Thread
« Reply #84 on: 07/09/2021 08:39 pm »
If we recap, the total cost for NASA of Gateway (excluding the spacesuits, Dragon XL and international contributions) is about $2.3B:

PPE $457M (1)
Advanced Electric Propulsion System (AEPS) $335.6M (2)
HALO $240.4M plus $935M (1) and (3)
FH Mission to launch PPE and HALO $331.8M (4)

(1) See page 11 of the IG Report on Gateway:
https://oig.nasa.gov/docs/IG-21-004.pdf

(2) See page 65 of the GAO Report (p. 73 of the PDF):
https://www.gao.gov/assets/gao-21-306.pdf

(3) https://www.nasa.gov/press-release/nasa-northrop-grumman-finalize-moon-outpost-living-quarters-contract

(4) https://www.nasa.gov/press-release/nasa-awards-contract-to-launch-initial-elements-for-lunar-outpost

* edit: I have added AEPS.
« Last Edit: 07/10/2021 02:15 pm by yg1968 »

Offline pochimax

  • Full Member
  • ****
  • Posts: 611
  • spain
  • Liked: 283
  • Likes Given: 136
Re: Gateway Updates Thread
« Reply #85 on: 07/10/2021 10:19 am »
I think you have to add the cost for the AEPS engines, provided by NASA from a different contract if I am correct.
Plus the canadian, european and japanese contributions to this module.

Offline yg1968

  • Senior Member
  • *****
  • Posts: 19268
  • Liked: 8667
  • Likes Given: 3517
Re: Gateway Updates Thread
« Reply #86 on: 07/10/2021 02:01 pm »
I think you have to add the cost for the AEPS engines, provided by NASA from a different contract if I am correct.
Plus the canadian, european and japanese contributions to this module.

Thanks, I have now added AEPS and specified that it doesn't include international contributions.

Offline yg1968

  • Senior Member
  • *****
  • Posts: 19268
  • Liked: 8667
  • Likes Given: 3517

Offline pochimax

  • Full Member
  • ****
  • Posts: 611
  • spain
  • Liked: 283
  • Likes Given: 136
Re: Gateway Updates Thread
« Reply #88 on: 07/14/2021 03:13 pm »
Is this 3 AEPS engines on PPE, now?  ???


Offline yg1968

  • Senior Member
  • *****
  • Posts: 19268
  • Liked: 8667
  • Likes Given: 3517
Re: Gateway Updates Thread
« Reply #89 on: 07/14/2021 04:27 pm »
Quote from: Marcia Smith
Canadian Space Agency's  Ken Podwalski says aiming for launch of Canadarm3 in early 2027. #Glenn2021

https://twitter.com/SpcPlcyOnline/status/1415340964928004099
« Last Edit: 07/14/2021 04:28 pm by yg1968 »

Offline yg1968

  • Senior Member
  • *****
  • Posts: 19268
  • Liked: 8667
  • Likes Given: 3517
Re: Gateway Updates Thread
« Reply #90 on: 07/14/2021 04:29 pm »
Quote from: Marcia Smith
JAXA's Fumiya Tsutsui: we're providing ECLSS for iHab and logistics support. #Glenn2021

https://twitter.com/SpcPlcyOnline/status/1415344829194776587

Offline yg1968

  • Senior Member
  • *****
  • Posts: 19268
  • Liked: 8667
  • Likes Given: 3517
Re: Gateway Updates Thread
« Reply #91 on: 07/14/2021 04:47 pm »
Quote from: Marcia Smith
[I posted Q asking for update on efforts to get Russia to provide airlock. Moderator simply asked what are plans for an airlock.]

NASA's Sean Fuller: airlock key component. Need in 2028 time frame. NASA in preliminary discussions with "potential future partners" #Glenn2021

https://twitter.com/SpcPlcyOnline/status/1415348902027530246
« Last Edit: 07/14/2021 06:00 pm by yg1968 »

Offline yg1968

  • Senior Member
  • *****
  • Posts: 19268
  • Liked: 8667
  • Likes Given: 3517
Re: Gateway Updates Thread
« Reply #92 on: 07/14/2021 04:53 pm »
Quote from: Marcia Smith
ESA's Frank De Winne update on ESA contributions to Gateway: ESPRIT comm system NET Nov 2024; iHab module NET mid-2026; ESPIRT Refuelling Module, end 2027 but undergoing capability enhancement definition bc cld be co-manifested w/Orion, get extra 2000 kg of launch mass #Glenn2021

https://twitter.com/SpcPlcyOnline/status/1415340556939632647

Offline Scintillant

  • Full Member
  • **
  • Posts: 242
  • Liked: 630
  • Likes Given: 197
Re: Gateway Updates Thread
« Reply #93 on: 08/04/2021 05:59 am »
On the latest episode of the MECO podcast, Eric Berger states that he has good sources that Russia is out of Gateway and will not be producing the airlock module.

Quote from: Eric Berger
Now, I did hear definitively this week, by the way, that the Russians are out of Gateway - uh, the Lunar Gateway program. I mean, they sort of had been making noise about the Artemis Accords but they were still nominally on board to build the airlock - they're out. They're out of the program.

Source: https://mainenginecutoff.com/podcast/195, approx. 39:50 into the podcast (transcribed by me)

Offline yg1968

  • Senior Member
  • *****
  • Posts: 19268
  • Liked: 8667
  • Likes Given: 3517
Re: Gateway Updates Thread
« Reply #94 on: 08/04/2021 03:47 pm »
On the latest episode of the MECO podcast, Eric Berger states that he has good sources that Russia is out of Gateway and will not be producing the airlock module.

Quote from: Eric Berger
Now, I did hear definitively this week, by the way, that the Russians are out of Gateway - uh, the Lunar Gateway program. I mean, they sort of had been making noise about the Artemis Accords but they were still nominally on board to build the airlock - they're out. They're out of the program.

Source: https://mainenginecutoff.com/podcast/195, approx. 39:50 into the podcast (transcribed by me)

NASA said a few months ago that they were looking at alternatives for the airlock. They didn't really expand on what these alternatives were.

https://twitter.com/joroulette/status/1369730064707911685
« Last Edit: 08/04/2021 04:56 pm by yg1968 »

Offline AU1.52

  • Full Member
  • ****
  • Posts: 659
  • Life is like riding a bicycle - Einstein
  • Ohio, USA, AU1
  • Liked: 671
  • Likes Given: 721
Re: Gateway Updates Thread
« Reply #95 on: 08/05/2021 04:44 pm »
Who built the airlock on the US side of ISS?

Offline bobthemonkey

  • Extreme Veteran
  • Full Member
  • ****
  • Posts: 1083
  • Liked: 32
  • Likes Given: 36
Re: Gateway Updates Thread
« Reply #96 on: 08/05/2021 07:46 pm »
Who built the airlock on the US side of ISS?

Boeing, with the crew lock (smaller diameter section) based on the shuttle external airlock design.

Offline PahTo

  • Full Member
  • ****
  • Posts: 1723
  • Port Angeles
  • Liked: 290
  • Likes Given: 1338
Re: Gateway Updates Thread
« Reply #97 on: 08/05/2021 11:45 pm »
Who built the airlock on the US side of ISS?

Boeing, with the crew lock (smaller diameter section) based on the shuttle external airlock design.

It should be noted that the Boeing that built that airlock was based in Seattle (and a mgmt structure and culture built on engineering, not govt contracts).  Since the McD takeover, not so much...

Offline Jim

  • Night Gator
  • Senior Member
  • *****
  • Posts: 38675
  • Cape Canaveral Spaceport
  • Liked: 23535
  • Likes Given: 436
Re: Gateway Updates Thread
« Reply #98 on: 08/06/2021 12:20 am »
Who built the airlock on the US side of ISS?

Boeing, with the crew lock (smaller diameter section) based on the shuttle external airlock design.

It should be noted that the Boeing that built that airlock was based in Seattle (and a mgmt structure and culture built on engineering, not govt contracts).  Since the McD takeover, not so much...

No,  not Seattle, but Huntsville (based on govt contracts)
« Last Edit: 08/06/2021 12:21 am by Jim »

Offline PahTo

  • Full Member
  • ****
  • Posts: 1723
  • Port Angeles
  • Liked: 290
  • Likes Given: 1338
Re: Gateway Updates Thread
« Reply #99 on: 08/06/2021 12:41 am »
Who built the airlock on the US side of ISS?

Boeing, with the crew lock (smaller diameter section) based on the shuttle external airlock design.

It should be noted that the Boeing that built that airlock was based in Seattle (and a mgmt structure and culture built on engineering, not govt contracts).  Since the McD takeover, not so much...

No,  not Seattle, but Huntsville (based on govt contracts)

Yes Jim--Boeing was based in Seattle at the time of the construction of that module.  I did not state where it was built, but the culture upon which is was constructed.

Tags:
 

Advertisement NovaTech
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0