UmmmThe Danish authorities have been happy to let these guys play with their rockets for the time being but if they ever actually get to the point that they are going to put a live person on a rocket and shoot them int space will the Danish authorities let them? Isn't Denmark like every where else where there is a mountain of red tape to go through?
Apparently the nannys have already tried to have them shut down. They quickly approached their local representative, gave him a tour, told him their plans and got some political support.
UmmmThe Danish authorities have been happy to let these guys play with their rockets for the time being but if they ever actually get to the point that they are going to put a live person on a rocket and shoot them int space will the Danish authorities let them? Isn't Denmark like every where else where there is a mountain of red tape to go through?cheers Peter
Quote from: pberrett on 07/13/2012 02:16 amUmmmThe Danish authorities have been happy to let these guys play with their rockets for the time being but if they ever actually get to the point that they are going to put a live person on a rocket and shoot them int space will the Danish authorities let them? Isn't Denmark like every where else where there is a mountain of red tape to go through?Apparently the nannys have already tried to have them shut down. They quickly approached their local representative, gave him a tour, told him their plans and got some political support.
Thank you, Morten, for the information -- much appreciated. Will be watching (and hoping for the best).
I underestimated this company and their abilities. I'm gladly eating my words. Love the sounding rocket and further work on the manned suborbital capsule and engine design. Hoping for a positive future outlook.
Space Port Nexoe Update: Launch Schedule for 27th-29th JulyPosted on July 18, 2012 by Jens WoesteThe following overall launch plan has been communicated from the Flight Director:Tuesday 24 July Equipment + vanguard departing from HAB with Space Port Nexoe as destination Thursday, 26 July Remaining personnel arrive at the Space Port Nexoe Stacking of rockets Refuelling of N2O Friday the 27th July 10:00 to 15:00 LES / Tycho Deep Space 1 (aka Beautiful Betty) launched from ESD139 Saturday 28 JulyReconfiguration of the MLP Sputnik (SMARAGD start ramp installed, etc..)Sunday 29 July 10:00 to 15:00 SMARAGD launched from ESD139 We will make sure to publish more detailed information on individual activities as soon as they become available.There will in launches (Friday and Sunday) will be Mission Control in the Tycho Brahe Planetarium, as well as live stream TV CSS. We are currently working. on the final details about when the doors opened mm.Stay tuned!
LES propellant tank pressure test failure. LES/Capsule test postponed, next launch window in August. SMARAGD-1 rocket still go July 27-29..
T 00.00 sec: LES engine ignite. 80 kN thrust. Liftoff.T +04.50 sec: LES motor burnout.T +14.00 sec: LES-engine separation; explosive bolts firedT +14.02 sec: LES-tower separation motor firing for 2 seconds with 10 kN thrust and remove LES tower.T +16.00 sec: TDS topdome separation and drogue parachute unfoldingT +20.00 sec: TDS drogue parachute separation. Main parachute begin extraction within their deploymentbags.T + 28.00 sec: TDS main parachute unfolded. Full-bearing after 8 seconds.T + 28.00 plus: TDS hangs under the main parachuteT + 28.00 plus: TDS splashdown. Recovery started.