Quote from: ParabolicSnark on 09/08/2020 02:54 pmA 2021 launch is also a lot to ask for a company that's only done a gas generator and a turbine test. They need to complete their turbopump, hotfire a chamber, integrate those two, and then run the complete engine with the stage. On top of that, there's permitting issues they need to resolve. Perhaps someone more familiar with European launch regulations can chime in on how they compare to NASA/AF/FAA/range qualification.Not a European expert but just looking at what others have done, like Rocket Lab, Firefly and Virgin, that date is laughable from this early status.
A 2021 launch is also a lot to ask for a company that's only done a gas generator and a turbine test. They need to complete their turbopump, hotfire a chamber, integrate those two, and then run the complete engine with the stage. On top of that, there's permitting issues they need to resolve. Perhaps someone more familiar with European launch regulations can chime in on how they compare to NASA/AF/FAA/range qualification.
That's a lot of employees for their stage in development and establishes a high burn rate. 100 people is probably in the neighborhood of $25-30M/year. Assuming a linear ramp during that year, you can cut that in half for Dec-2019 through Dec-2020 which matches well with their goal for another funding round this year.
I wouldn‘t expect their expenditures for personnel to be that high. It‘s about 100k € for a young engineer/year including overhead costs.
A competition organized by the German Aerospace Center shows how important politicians rate the development of German small rockets. The jury is chaired by Thomas Jarzombek, the German government's space coordinator. A total of 25 million euros have been awarded to two start-ups in particular for developing and qualifying their rockets.Jarzombek even called for more money to be given to start-ups in the budget negotiations at the ESA Ministerial Conference in 2022 than to invest another million euros in the further development of the large European Ariane launcher . "We don't need Ariane 7".
Isar Aerospace has 100 employees, which are to be increased to 160 in 2021.
I'm a big fan of using cryogenic propane, I think its high density when sub-cooled, low coking properties, and higher ISP than RP-1 make propane an ideal choice if one had to build a clean sheet small-medium lift partially-reusable launch vehicle.
Seems like there's a lot of political pressure in Germany to foster the new space environment. Isar is most notable, but they made mention of Rocket Factory Augsburg and HyImpulse, neither of which I've heard of before.
Quote from: Pueo on 10/05/2020 08:14 pmI'm a big fan of using cryogenic propane, I think its high density when sub-cooled, low coking properties, and higher ISP than RP-1 make propane an ideal choice if one had to build a clean sheet small-medium lift partially-reusable launch vehicle.Wasn't HMXHMX always saying if he had another go at it, he would pick LOx/Propane?Quote from: ParabolicSnark on 09/17/2020 12:13 amSeems like there's a lot of political pressure in Germany to foster the new space environment. Isar is most notable, but they made mention of Rocket Factory Augsburg and HyImpulse, neither of which I've heard of before.Would this suggest Germany is hedging against EU/ESA problems?
Unfortunately I'm a relative newcomer to the forum, what's HMXHMX's background?
https://www.heise.de/news/Bundesregierung-prueft-Konzept-fuer-Raketenstartplatz-in-der-Nordsee-4932590.html
Isar Aerospace, which is building a micro-satellite launcher significantly smaller and thus lower in price than bigger launchers on the market today, has picked up €75 million ($91 million) in funding. It plans to use the money to continue its research, development and production en route to its first commercial launches, planned for early 2022.The round, a Series B, is being led by Lakestar, with previous backers Earlybird and Vsquared Ventures also contributing significantly, the company said. Earlybird and strategic backer Airbus Ventures led Isar’s previous round of $17 million in December 2019.
Just in German news: Porsche buys a single digit share of Isar Aerospace.
Quote from: TorenAltair on 07/28/2021 10:09 amJust in German news: Porsche buys a single digit share of Isar Aerospace.A total of $75 million in this round of funding, bringing their total to date up to $180 million.
But Germany hasn't had a launch site since either WW2, or perhaps the OTRAG-era in Zaire, has it? Also, do they have a legal framework today to allow a German rocket to be licensed to launch, apart from the standard (minimalist) UN OST adherence everybody has?