Space Intelligence@SpaceIntel101·Transport to and arrival in the VAB.
Space Intelligence@SpaceIntel101After the HTV-X1 spacecraft was mated with the H3🚀, a "Late Access Door" in one of its fairings allows for the loading of final cargo.
Launch Postponement of New unmanned cargo transfer spacecraft1(HTV-X1) aboard the 7th H3 Launch Vehicle (H3 F7)October 19, 2025 (JST)Japan Aerospace Exploration AgencyThe launch of New unmanned cargo transfer spacecraft1(HTV-X1) aboard the 7th H3 Launch Vehicle (H3 F7) which was scheduled on October 21, 2025(JST), has been postponed due to a bad weather forecast on this date.Furthermore, as weather improvement is not expected at least until October 23, the new launch date will be announced once the outlook becomes clear.
Jonathan McDowell@planet4589·I've found some nice docs on the HTV-X1 launch (which I've cached at https://planet4589.org/space/misc/htv ) but nothing giving a pressurized cargo layout like we always got for the old HTV missions as illustrated here - @HTVX_JAXA or anyone, is one available?
Space Intelligence@SpaceIntel101The H3🚀 fairing's "Late Access Door" has been closed.Waiting for better weather for launch.Video credit: @tnsc_JAXA