From Anatoly Zak:
How MLM Nauka module's tanks will be repaired
http://www.russianspaceweb.com/iss-fgb2-mlm-tanks.html
 :)

Offline DaveS

  • Shuttle program observer
  • Senior Member
  • *****
  • Posts: 8526
  • Sweden
  • Liked: 1199
  • Likes Given: 65
Latest Nauka news: "Washing Machine" for the contaminated propellant tanks ready: http://russianspaceweb.com/iss-fgb2-mlm-tanks.html#rig
"For Sardines, space is no problem!"
-1996 Astronaut class slogan

"We're rolling in the wrong direction but for the right reasons"
-USA engineer about the rollback of Discovery prior to the STS-114 Return To Flight mission

Offline Sam Ho

  • Full Member
  • ****
  • Posts: 817
  • Liked: 580
  • Likes Given: 71
Latest from Anatoly Zak: The practice run resulted in a leaky test article, so the schedule is under evaluation again.  Launch date is currently NET February 2019.

http://www.russianspaceweb.com/iss-fgb2-mlm-2017.html#0921
http://www.russianspaceweb.com/iss-fgb2-mlm-tanks.html#2017_09

Offline topopesto

  • Full Member
  • *
  • Posts: 167
  • Liked: 54
  • Likes Given: 1
We don't see never to dock this module. I'm very sad!

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6153
  • near hangar 18
  • Liked: 3364
  • Likes Given: 1138
http://aviationweek.com/space/russian-iss-module-launch-delayed-until-late-2018?NL=AW-05&Issue=AW-05_20170926_AW-05_582&sfvc4enews=42&cl=article_3&utm_rid=CPEN1000001748383&utm_campaign=11871&utm_medium=email&elq2=2118e47e3e454e999fc545e159c3aaaf

(registration to see the full article is free)

"ADELAIDE, Australia—Russia does not plan to launch its new science lab to the International Space Station (ISS) until late 2018, likely prolonging the country’s scaled-down staffing of the orbital base, which frees an extra seat aboard Soyuz capsules for NASA or U.S. partners ahead of upcoming commercial space taxis."
« Last Edit: 09/26/2017 06:24 pm by Targeteer »
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 48176
  • UK
    • Plan 28
  • Liked: 81676
  • Likes Given: 36941
Quote
Anatoly Zak‏ @RussianSpaceWeb 26s27 seconds ago

The launch of the #MLM module to #ISS set for March 2019. DETAILS: http://www.russianspaceweb.com/iss-fgb2-mlm-2017.html#1019

https://twitter.com/RussianSpaceWeb/status/921048205290336257

Offline zubenelgenubi

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 11181
  • Arc to Arcturus, then Spike to Spica
  • Sometimes it feels like Trantor in the time of Hari Seldon
  • Liked: 7404
  • Likes Given: 72484
Cross-post:
http://www.russianspaceweb.com/iss-fgb2-mlm-2017.html#1103

Quote
The launch of the MLM module advanced to 2018

On November 2, Director General of RKK Energia Vladimir Solntsev met with the Head of Roskosmos Igor Komarov, who insisted on launching the MLM module before the end of 2018, probably due to political pressure from the Kremlin. To accommodate this requirement, RKK Energia drafted a new timeline, which was approved by the company's leadership on November 3.

The new schedule set the launch of the MLM module for Dec. 20, 2018, followed by its docking at the Russian Segment of the station on Dec. 29, 2018.

According to the latest timeline, the arrival of the module will take place during Expedition 58, which will begin onboard the ISS at the end of October 2018. Shortly after the launch of the MLM module, the Pirs Docking Compartment, SO1, will be undocked from the nadir (Earth-facing) port of the Zvezda Service Module, SM, to make room for the new arrival.

The discarding of Pirs will now be delegated to the Progress MS-09 spacecraft, which is scheduled for launch on June 13, 2018. Progress MS-09 will tug Pirs away from the station and then direct it into the Earth's atmosphere to burn up over the ocean.

In order to leave Earth before the end of 2018, the MLM/Nauka module would have to be shipped to the launch site in Baikonur in March. In case the processing team in Baikonur worked around the clock, the spacecraft could be ready for launch in seven months, leaving up to two months in reserve. However, experts familiar with the matter saw even the March 2019 launch date as overly ambitious and estimated that it would be more realistic to plan the launch around May 2019.

The situation is complicated by the fact that in October, a Roskosmos representative warned that RKK Energia would have only one chance to push the schedule beyond the previously approved launch date in June 2018, before heavy fines would kick in against the company.

The latest schedule is yet to be officially approved by Roskosmos.
Support your local planetarium! (COVID-panic and forward: Now more than ever.) My current avatar is saying "i wants to go uppies!" Yes, there are God-given rights. Do you wish to gainsay the Declaration of Independence?

Offline Olaf

  • Senior Member
  • *****
  • Posts: 3124
  • Germany
  • Liked: 1481
  • Likes Given: 455
www.russianspaceweb.com/iss-fgb2-mlm-2017.html#12
Quote
MLM launch schedule gets official OK
On December 11, the State Commission overseeing preparations for the launch of the MLM Nauka module formally approved the processing schedule culminating with the liftoff of the long-delayed spacecraft on Dec. 20, 2018.
In the first half of December, Russian specialists and their European colleagues had already begun work on preparing some critical components of the MLM module for shipment to the launch site ahead of the spacecraft itself. During this and the coming week, Dutch specialists working on the European Robotic Arm, ERA, designed to be attached to the exterior of the MLM module, are expected to complete the final checks of the flight hardware at RKK Energia's facility in Korolev, near Moscow, and pack it for shipment to the Baikonur Cosmodrome. The components of the ERA manipulator are expected to be among several pieces of hardware for the MLM module that are scheduled to make a train ride to Baikonur as early as February 2018.
According to industry sources, the MLM team will have a reasonable chance to meet the December 2018 launch window if it is able to ship the Nauka module to Baikonur in March. The pre-launch processing of the spacecraft in Baikonur will require at least seven months, leaving a few weeks in reserve to close any unexpected issues. However, this schedule still depends on the successful completion of the tank repairs, which are reportedly still ongoing.

Offline JW98

  • Member
  • Posts: 13
  • UK
  • Liked: 8
  • Likes Given: 38
http://www.russianspaceweb.com/iss-fgb2-mlm-2018.html

Can someone update the thread title to NET 2018, think 2017 is a bit optimistic!
« Last Edit: 02/05/2018 09:02 pm by Lar »
Always reading, rarely posting.

Offline Svetoslav

  • Veteran
  • Full Member
  • ****
  • Posts: 1667
  • Bulgaria
  • Liked: 1184
  • Likes Given: 114
I'd already say it's net 2019, but let the mods decide.

I'll report for them to see.

Edit/Lar: report received. Header post and a couple more edited.  Let's go with 2018 for now...
« Last Edit: 02/05/2018 09:04 pm by Lar »

Offline Stan Black

  • Senior Member
  • *****
  • Posts: 3135
  • Liked: 377
  • Likes Given: 228
Roskosmos has issued a tender for the transportation of the launch vehicle from Khrunichev to the launch site.
http://www.zakupki.gov.ru/epz/order/notice/ep44/view/common-info.html?regNumber=0995000000218000004

Offline deruch

  • Senior Member
  • *****
  • Posts: 2422
  • California
  • Liked: 2006
  • Likes Given: 5634
Roskosmos has issued a tender for the transportation of the launch vehicle from Khrunichev to the launch site.
http://www.zakupki.gov.ru/epz/order/notice/ep44/view/common-info.html?regNumber=0995000000218000004

Link shows completion of work terms with a stated end date of December 1, 2018.
Shouldn't reality posts be in "Advanced concepts"?  --Nomadd

Offline theonlyspace

  • Full Member
  • ****
  • Posts: 550
  • Rocketeer
  • AEAI Space Center, USA
  • Liked: 122
  • Likes Given: 811
So what does this actually mean? Will the Proton and fairing be at the launch complex Dec1 2018 ready for the MLM to be intergarted to it and launched in December 2018 ti ISS?

Offline Stan Black

  • Senior Member
  • *****
  • Posts: 3135
  • Liked: 377
  • Likes Given: 228
So what does this actually mean? Will the Proton and fairing be at the launch complex Dec1 2018 ready for the MLM to be intergarted to it and launched in December 2018 ti ISS?


Heres one from 2017…
http://www.zakupki.gov.ru/epz/order/notice/ea44/view/common-info.html?regNumber=0995000000217000034

Offline eeergo

-DaviD-

Offline Sam Ho

  • Full Member
  • ****
  • Posts: 817
  • Liked: 580
  • Likes Given: 71

Offline Svetoslav

  • Veteran
  • Full Member
  • ****
  • Posts: 1667
  • Bulgaria
  • Liked: 1184
  • Likes Given: 114
Anybody who believes this will fly? ...

Offline redliox

  • Senior Member
  • *****
  • Posts: 2539
  • Illinois USA
  • Liked: 683
  • Likes Given: 97
Anybody who believes this will fly? ...

I give it 50/50 since some construction has been done.  In the past Russia was very hesitant to deorbit Mir, so they have a history of being stubborn as well as broke...which amounts to 2 gears grinding against each other which might explain how their agency keeps running but hasn't advanced much since the Soviet era.  I will say if they delay this module much further (which is of course a strong possibility), they might have to consider the option of using it on their own station or as their contribution to the upcoming Gateway station.

Considering how old ISS already is, I'd recommend incorporating Nauka into the plans for Gateway so Russia can get the most bang out of their rubles.
"Let the trails lead where they may, I will follow."
-Tigatron

Offline woods170

  • IRAS fan
  • Senior Member
  • *****
  • Posts: 12096
  • IRAS fan
  • The Netherlands
  • Liked: 18201
  • Likes Given: 12162
Anybody who believes this will fly? ...

I’m not optimistic.

Offline Ben E

  • Full Member
  • ****
  • Posts: 1132
  • Liked: 100
  • Likes Given: 9
I wonder if MLM is even worth it? Will it really match the science currently being achieved on the USOS?

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0