The T configuration is completed, and the Hall electric propulsion will start to assist the orbit maintenance of the space station~At the time of launch, only two 12 L small Xe gas cylinders were carried in the resource module. The previous ignition verification of the thruster and the active potential control of the space station used Xe from these two gas cylinders.Therefore, these two replaceable 75 L large cylinders need to be installed before starting long-term ignition. The robotic arm can complete the automatic installation, and the astronaut EVA acts as a backup.
First shot of the CSS I have seen that clearly shows the T-structure and solar panels post-completion 3 days ago:
Whoa! Shooting success! The CSS that penetrates the clouds is cool! 2022.11.06 Around 10:33 AM, this is a video of the CSS China Space Station tracked in the daytime. Actually, it is flying far above the clouds, but the feeling of penetrating the clouds is a new feeling that is not found in normal astrophotography 🛰🔭📷🐻#CSS #ISS #中国宇宙ステーション
A 1:1 duplicate of #ChinaSpaceStation will appear on 14th International Aviation and Aerospace Exhibition, which is to kick off in #Zhuhai, south #China's #Guangdong Province on Nov. 8th. My colleagues are there and have taken a closer look of it.(Credit: Lyu Lingyu/CASC)
Does mengtian module has a stowed RMS??
Latest @CNSpaceStation after Mengtian relocation.
Click the link to take a look at the CASC exhibition at Zhuhai Airshow, including the new reusable Long March 9 model, life size replica of Tiangong space station and on-orbit servicing satellite https://www.720yun.com/t/76vk6w8hs17#scene_id=102756498
Growth of Tiangong Space Station (CSS) by Phillip Smith @lordphilip14