Author Topic: Arianespace launch schedule  (Read 1640166 times)

Offline Sur2900

  • Member
  • Posts: 36
  • Liked: 5
  • Likes Given: 1
Re: Arianespace launch schedule
« Reply #260 on: 09/20/2009 06:07 pm »
Intesat FCC filing -Sept 18,2009 - ground control for Thor-6 launch
Oct 23,2009

http://licensing.fcc.gov/ibfsweb/ib.page.FetchAttachment?attachment_key=-179052

Offline Sur2900

  • Member
  • Posts: 36
  • Liked: 5
  • Likes Given: 1
Re: Arianespace launch schedule
« Reply #261 on: 09/23/2009 03:15 pm »
PanAmSat FCC filing Sept 22 - Ground Control NSS-2 launch Oct 23

http://licensing.fcc.gov/ibfsweb/ib.page.FetchAttachment?attachment_key=-179958

Offline anik

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 7776
  • Liked: 955
  • Likes Given: 368
Re: Arianespace launch schedule
« Reply #262 on: 09/25/2009 02:24 pm »
V192 mission is still planned on October 29th, but I was told there are some problems with NSS-12, so Arianespace considers its replacing by Astra 3B, which can postpone launch.

Offline satlaunch

  • Member
  • Full Member
  • ****
  • Posts: 495
  • Liked: 1
  • Likes Given: 0
Re: Arianespace launch schedule
« Reply #263 on: 09/29/2009 04:55 pm »
Performed launches
12 February  -  Hot Bird 10 / NSS 9 / Spirale A / Spirale B - Ariane 5 ECA (V187) - 22:09 UTC
14 May - Herschel / Planck - Ariane 5 ECA (V188) - 13:12 UTC
1 July - TerreStar-1 - Ariane 5 ECA (V189) - 17:52 UTC
21 August - JCSAT-12 / Optus D3 - Ariane 5 ECA (V190) - 22:09 UTC
1 October - Amazonas-2 / COMSATBw-1 - Ariane 5 ECA (V191) - 21:59 UTC

2009
29 October - NSS 12 / Thor-6 - Ariane 5 ECA (V192) - 20:00-21:40 UTC
10 December - Helios IIB - Ariane 5 GS (V193)

2010
beginning of year - COMS-1 - Ariane 5
beginning of year - LARES / 9 Cubesats - Vega (qualification flight)
First quarter - Arabsat 5A - Ariane 5(or Proton from Baikonur)
First quarter - Astra 3B - Ariane 5
First quarter - Badr 5 - Ariane 5 (or Proton from Baikonur)
June - COMSATBw-2 - Soyuz-STA/Fregat
June - Nilesat 201 - Ariane / Soyuz
June - Rascom-QAF 1R - Ariane 5 / Soyuz
Second quarter - Hylas - Ariane 5
First half - Pléiades-1 / ELISA (4 sats) / SSOT - Soyuz-STB/Fregat
Third quarter - SES Satellite (AMC-?R) - Ariane
Second half - BSat-3b - Ariane
Second half - INSAT-4G - Ariane 5
Second half - Koreasat 6 - Ariane / Soyuz
18 November - ATV-2 "Johannes Kepler" - Ariane
November - Galileo (2 sats) - Soyuz-STB/Fregat
Fourth quarter - Intelsat New Dawn - Ariane 5 / Soyuz
end of 2010 - Hispasat 1E - Ariane
TerreStar-2 - Ariane 5

2011
beginning of year - Galileo (2 sats) - Soyuz-STB/Fregat
January - MSG-3 - Ariane
Second quarter - Astra 1N - Ariane
Second quarter - ST 2 - Ariane
First half - BSAT-3c/JCSAT-110R - Ariane 5 ECA
end of June - Swarm - Vega
Middle of the year - LISA Pathfinder - Soyuz-STB/Fregat (or Vega?)
Third quarter - Arabsat 5C - Ariane 5 ECA
November - ADM-Aeolus - Vega
Yahsat 1A - Ariane
Türksat 4A - Ariane 5
ATV-3 - Ariane
Pléiades-2 - Soyuz-STB/Fregat
O3b Networks (4 satellites) - Soyuz-STB/Fregat
O3b Networks (4 satellites) - Soyuz-STB/Fregat

2012
March - Gaia - Soyuz-STB/Fregat
2 April - MetOp-B - Soyuz-STB/Fregat
May - Sentinel-1 - Soyuz-STB/Fregat
June - Alphasat I-XL - Ariane 5
First half - ABS 2 - Ariane 5 ECA
Second half - Badr 7 - Ariane 5 ECA
Yamal 401 - Ariane 5 ECA
Yamal 402 - Ariane 5 ECA
ATV-4 - Ariane
Sicral-2 - Ariane
Proba 3 - Vega
IXV (Intermediate Experimental Vehicle) - Vega

2013
January - MSG-4 - Ariane
April - Sentinel-2 - Vega
May - Sentinel-3 - Vega
ATV-5 - Ariane
Autumn - EarthCare - Vega
JCSAT-13 - Ariane 5

2014
June - JWST - Ariane 5 ECA
August - BepiColombo - Ariane 5
ATV-6 - Ariane 5
Türksat 5A - Ariane 5

2016
October - MetOp-C - Soyuz-STB/Fregat
ExoMars - Ariane 5 (Proton as backup)

2017
May - Solar Orbiter - Soyuz-STB/Fregat

Changes on September 29
Changes on October 1
Changes on October 4
Changes on October 7
Changes on October 9
Changes on October 10
Changes on October 11
Changes on October 12
Changes on October 20
« Last Edit: 10/20/2009 05:17 pm by SNS »

Offline Moses

  • Member
  • Posts: 2
  • Liked: 0
  • Likes Given: 0
Re: Arianespace launch schedule
« Reply #264 on: 09/29/2009 09:07 pm »
BepiColombo will be launched on Ariane V

Offline satlaunch

  • Member
  • Full Member
  • ****
  • Posts: 495
  • Liked: 1
  • Likes Given: 0
Re: Arianespace launch schedule
« Reply #265 on: 10/03/2009 11:25 am »
BepiColombo will be launched on Ariane V

What is your source? ESA shows Soyuz on its page: http://sci.esa.int/science-e/www/area/index.cfm?fareaid=30

Offline Moses

  • Member
  • Posts: 2
  • Liked: 0
  • Likes Given: 0

Offline Skyrocket

  • Extreme Veteran
  • Senior Member
  • *****
  • Posts: 2654
  • Frankfurt am Main, Germany
  • Liked: 993
  • Likes Given: 175
Re: Arianespace launch schedule
« Reply #267 on: 10/07/2009 09:40 am »

2010
...
First half - Sistema Satelital para Observación de la Tierra (SSOT) - Soyuz-STB/Fregat
...
?? - Pléiades-1 / ELISA (4 sats) - Soyuz-STB/Fregat

SSOT is a piggy-back-Payload on the Pléiades-1 launch
(see http://www.arianespace.com/about-us-corporate-information/Annual_Report_2008.pdf)

SSOT is just a 135kg microsat based on the Myriade-platform (see http://space.skyrocket.de/doc_sdat/ssot.htm)

Offline satlaunch

  • Member
  • Full Member
  • ****
  • Posts: 495
  • Liked: 1
  • Likes Given: 0
Re: Arianespace launch schedule
« Reply #268 on: 10/09/2009 06:39 pm »
Yahsat 1A launch delayed to 2011.

Quote
"Based in the United Arab Emirates, the Al Yah Satellite Communications Co. is building two large telecommunications satellites [Yahsat 1A and Yahsat 1B] scheduled for launch in 2011."

http://www.spacenews.com/satellite_telecom/yahsat-picks-viasat-technology-for-consumer-broadband-offering.html
« Last Edit: 10/09/2009 06:49 pm by SNS »

Offline satlaunch

  • Member
  • Full Member
  • ****
  • Posts: 495
  • Liked: 1
  • Likes Given: 0
Re: Arianespace launch schedule
« Reply #269 on: 10/10/2009 10:08 am »
Yamal 401 and Yamal 402 launches postponed to 2012. Source: http://www.comnews.ru/index.cfm?id=48658&tempo=323

Offline satlaunch

  • Member
  • Full Member
  • ****
  • Posts: 495
  • Liked: 1
  • Likes Given: 0
Re: Arianespace launch schedule
« Reply #270 on: 10/11/2009 01:33 pm »
Quote
"Deployment of Europe’s Galileo satellite navigation system has slipped again, with the European version of Russia’s Soyuz rocket now scheduled to carry four Galileo in-orbit validation satellites into orbit in two launches scheduled for late 2010 and early 2011, European Space Agency (ESA) Director-General Jean-Jacques Dordain said Oct. 9."

http://www.spacenews.com/civil/launch-dates-slip-for-galileo-validation-satellites.html

Offline satlaunch

  • Member
  • Full Member
  • ****
  • Posts: 495
  • Liked: 1
  • Likes Given: 0
Re: Arianespace launch schedule
« Reply #271 on: 10/22/2009 02:45 pm »
ATV-2 new launch date: 30 November 2010

http://www.nasa.gov/directorates/somd/reports/iss_reports/2009/10212009.html


Performed launches
12 February  -  Hot Bird 10 / NSS 9 / Spirale A / Spirale B - Ariane 5 ECA (V187) - 22:09 UTC
14 May - Herschel / Planck - Ariane 5 ECA (V188) - 13:12 UTC
1 July - TerreStar-1 - Ariane 5 ECA (V189) - 17:52 UTC
21 August - JCSAT-12 / Optus D3 - Ariane 5 ECA (V190) - 22:09 UTC
1 October - Amazonas-2 / COMSATBw-1 - Ariane 5 ECA (V191) - 21:59 UTC
29 October - NSS 12 / Thor-6 - Ariane 5 ECA (V192) - 20:00 UTC

2009
9 December - Helios IIB - Ariane 5 GS (V193) - 16:26 UTC

2010
beginning of year - COMSATBw-2 - Ariane 5
First quarter - Arabsat 5A - Ariane 5 (or Proton from Baikonur)
First quarter - Astra 3B - Ariane 5
March - COMS-1 - Ariane 5
First quarter - Badr 5 - Ariane 5 (with Proton from Baikonur)
June - Hylas - Soyuz-STA/Fregat
June - Nilesat 201 - Ariane 5 / Soyuz
June - Rascom-QAF 1R - Ariane 5 / Soyuz
First half - Pléiades-1 / ELISA (4 sats) / SSOT - Soyuz-STB/Fregat
Second half - BSat-3b - Ariane 5
Second half - INSAT-4G - Ariane 5
Second half - Koreasat 6 - Ariane 5 / Soyuz
30 November - ATV-2 "Johannes Kepler" - Ariane 5
November - Galileo (2 sats) - Soyuz-STB/Fregat
November - LARES / 9 Cubesats - Vega (qualification flight)
Fourth quarter - AMC-5R - Ariane 5 / Soyuz
Fourth quarter - Intelsat New Dawn - Ariane 5 / Soyuz
end of year - Hispasat 1E - Ariane 5
TerreStar-2 - Ariane 5

2011
beginning of year - Galileo (2 sats) - Soyuz-STB/Fregat
beginning of year - Yahsat 1A - Ariane
January - MSG-3 - Ariane
Second quarter - Astra 1N - Ariane
Second quarter - ST 2 - Ariane
First half - BSAT-3c/JCSAT-110R - Ariane 5 ECA
end of June - Swarm - Vega
middle of the year - LISA Pathfinder - Soyuz-STB/Fregat (or Vega?)
Third quarter - Arabsat 5C - Ariane 5 ECA
November - ADM-Aeolus - Vega
Türksat 4A - Ariane 5
ATV-3 - Ariane
Pléiades-2 - Soyuz-STB/Fregat
O3b Networks (4 satellites) - Soyuz-STB/Fregat
O3b Networks (4 satellites) - Soyuz-STB/Fregat

2012
March - Gaia - Soyuz-STB/Fregat
2 April - MetOp-B - Soyuz-STB/Fregat
May - Sentinel-1 - Soyuz-STB/Fregat
June - Alphasat I-XL - Ariane 5
First half - ABS 2 - Ariane 5 ECA
Second half - Badr 7 - Ariane 5 ECA
Yamal 401 - Ariane 5 ECA
Yamal 402 - Ariane 5 ECA
ATV-4 - Ariane
Sicral-2 - Ariane
Proba 3 - Vega
IXV (Intermediate Experimental Vehicle) - Vega

2013
January - MSG-4 - Ariane
April - Sentinel-2 - Vega
May - Sentinel-3 - Vega
ATV-5 - Ariane
Autumn - EarthCare - Vega
JCSAT-13 - Ariane 5
end of year - ESMO - Ariane 5 / Soyuz (or early 2014)

2014
June - JWST - Ariane 5 ECA
August - BepiColombo - Ariane 5
ATV-6 - Ariane 5
Türksat 5A - Ariane 5

2016
October - MetOp-C - Soyuz-STB/Fregat
ExoMars - Ariane 5 (Proton as backup)

2017
May - Solar Orbiter - Soyuz-STB/Fregat

Changes on October 22
Changes on October 24
Changes on October 27
Changes on October 29
Changes on October 30
Changes on November 4
Changes on November 6
« Last Edit: 11/07/2009 12:12 am by SNS »

Offline satlaunch

  • Member
  • Full Member
  • ****
  • Posts: 495
  • Liked: 1
  • Likes Given: 0
Re: Arianespace launch schedule
« Reply #272 on: 10/24/2009 09:02 am »
Yahsat 1A launch planned in early 2011.

Quote
That has pushed back the launch of the satellite by a few months, it is now looking more likely to happen in early 2011 than late 2010,” claimed Yousif."

http://www.digitalproductionme.com/article-1894-yahsat_1a_launch_pushed_back_to_2011/

Offline satlaunch

  • Member
  • Full Member
  • ****
  • Posts: 495
  • Liked: 1
  • Likes Given: 0
Re: Arianespace launch schedule
« Reply #273 on: 10/27/2009 06:30 pm »
According to this file Arabsat 5A will be launched with Ariane 5.

Other Arabsat satellite Badr 5 will be launched with Proton.

Offline anik

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 7776
  • Liked: 955
  • Likes Given: 368
Re: Arianespace launch schedule
« Reply #274 on: 10/27/2009 07:47 pm »
According to this file Arabsat 5A will be launched with Ariane 5

SNS, this file was created in March. And possibly they have changed rocket since that time. RussianSpaceWeb has updated today schedule with information about Arabsat-5A launching by Proton-M in the beginning of May 2010.

Offline satlaunch

  • Member
  • Full Member
  • ****
  • Posts: 495
  • Liked: 1
  • Likes Given: 0
Re: Arianespace launch schedule
« Reply #275 on: 10/28/2009 07:38 am »
According to this file Arabsat 5A will be launched with Ariane 5

SNS, this file was created in March. And possibly they have changed rocket since that time. RussianSpaceWeb has updated today schedule with information about Arabsat-5A launching by Proton-M in the beginning of May 2010.

In my opinion May 2010 is too late. On 13 September press release they have said Q1 2010 for Arabsat 5A. Also Ariane-5 schedule looks suitable for Arabsat's requirements. I will ask them about this case.

Offline satlaunch

  • Member
  • Full Member
  • ****
  • Posts: 495
  • Liked: 1
  • Likes Given: 0
Re: Arianespace launch schedule
« Reply #276 on: 10/29/2009 11:14 am »
AMC 5R (SES Satellite AMC-?R) launch is postponed to the fourth quarter of 2010.

Source: SES

Offline satlaunch

  • Member
  • Full Member
  • ****
  • Posts: 495
  • Liked: 1
  • Likes Given: 0
Re: Arianespace launch schedule
« Reply #277 on: 10/30/2009 04:55 pm »
COMS-1 launch expected during the spring of 2010.

Quote
The successful testing has enabled COMS to be deemed as ‘space qualified’ and will allow for preparations to begin for the launch of the satellite from the French Guiana Space Centre in Kourou next spring.

http://www.astrium.eads.net/en/news/2009/multi-mission-coms-satellite-is-2018space-qualified2019



COMSATBw-2 launch is expected in early 2010 with Ariane 5.

Quote
A second, identical COMSATBw-2 satellite is scheduled for launch in early 2010, a launch likely to be aboard Ariane 5 but with the new European version of Russia’s Soyuz rocket also a possibility, depending on when Soyuz begins operations from the European spaceport.

http://www.spacenews.com/launch/ariane-lofts-comsatbw-1-amazonas-2.html
« Last Edit: 10/30/2009 05:00 pm by SNS »

Offline satlaunch

  • Member
  • Full Member
  • ****
  • Posts: 495
  • Liked: 1
  • Likes Given: 0
Re: Arianespace launch schedule
« Reply #278 on: 11/04/2009 08:38 am »
Hylas will be launched in mid-2010.

Quote
Following launch in mid-2010 by Arianespace, there will be a one-year demonstration phase, during which the flexibility of the payload and a series of advanced broadband applications will be demonstrated.

http://www.esa.int/esaTE/SEMFDQYRA0G_index_0.html

Offline perssj

  • Member
  • Posts: 2
  • Liked: 0
  • Likes Given: 0
Re: Arianespace launch schedule
« Reply #279 on: 11/04/2009 09:13 am »
In the Arianespace launch list (which is very good!) you have ATV-6 included. To my knowledge there are only five ATV ordered.

There is an option for two more but they are far from approval.

 

Advertisement NovaTech
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0