Author Topic: Soyuz-2.1b/Fregat - OneWeb F9 (x34) - Baikonur - 21 August 2021 (22:13 UTC)  (Read 87084 times)

Offline jacqmans

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 22381
  • Houten, The Netherlands
  • Liked: 9363
  • Likes Given: 343
Jacques :-)

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27056
  • Liked: 5301
  • Likes Given: 169
At the Baikonur cosmodrome, the refueling of the "Fregat" has been completed

08/06/2021 11:57

At the Baikonur cosmodrome, the filling of the Fregat upper stage with fuel and compressed gases has been successfully completed. The work was carried out by specialists from the Center for Testing Fueling Complexes of the Yuzhny Space Center (a branch of the Center for Operation of Ground-Based Space Infrastructure Objects, part of the State Corporation Roscosmos).

Technological refueling operations lasted seven days at the refueling station of site No. 31. At present, the Fregat was transported to the assembly and test building of site No. 112 for final operations before the assembly of the spacecraft (OneWeb vehicles, upper stage, head fairing).

The launch of the Soyuz-2.1b carrier rocket with 34 OneWeb spacecraft is scheduled for August 20, 2021 from the Vostok launch complex of the Baikonur cosmodrome.

The Fregat upper stage, manufactured by the Lavochkin Research and Production Association (part of Roskosmos), ensures the effective implementation of all tasks to launch one or more satellites into working orbits or trajectories departing from the Earth. The entire process of launching is carried out autonomously, the control algorithm is capable of overcoming abnormal situations. The highest reliability and almost perfect launching accuracy provide the upper stage with undeniable competitive advantages in the global launch services market.

https://www.roscosmos.ru/32114/

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27056
  • Liked: 5301
  • Likes Given: 169
Baikonur city enterprises participate in the launch of the Soyuz-2 - OneWeb launch campaign

08/08/2021 12:50

Last week, the OneWeb spacecraft for mission 35 arrived at the Krainy airport of the Baikonur cosmodrome by an An-124-100 aircraft. Specialists of the Yuzhny Space Center (a branch of the Center for Operation of Ground-Based Space Infrastructure Facilities, part of the Roscosmos State Corporation) unloaded and delivered spacecraft to the technical complex of the cosmodrome, where they will be further prepared for the launch, scheduled for August 20, 2021.

This work will be carried out as part of the contracts between Glavkosmos (a subsidiary of Roskosmos) and the European launch services provider Arianespace (operator of the OneWeb spacecraft launch using the Soyuz-2 launch vehicle) and Starsem. Earlier, in the assembly and testing building of site No. 31, the assembly of the "package" (1st and 2nd stages) of the Soyuz-2.1b carrier rocket and its reloading to the workplace for further general assembly of the space rocket were completed. The launch of OneWeb satellites from Baikonur is scheduled for August 20.

The city enterprises of Baikonur are also involved in supporting the launch campaign. The State Unitary Enterprise "Production and Energy Association" Baikonurenergo "is entrusted with the functions of supplying the cosmodrome facilities with electricity. The State Unitary Enterprise "Production Association" Gorvodokanal "performs the tasks of providing cold water of drinking quality to the objects of the ground space infrastructure of the cosmodrome. The State Unitary Enterprise "Housing Industry" carries out work on the maintenance and repair of roads of the cosmodrome.

https://www.roscosmos.ru/32108/

Online Alter Sachse

  • Senior Member
  • *****
  • Posts: 2818
  • Near Heidelberg
  • Liked: 1839
  • Likes Given: 2352
https://www.russian.space/2862/

The Fregat upper stage has been successfully refueled at Baikonur Cosmodrome with fuel and compressed gases. The work was performed by specialists from the Yuzhny Space Center's Refueling Complex Test Center (a branch of the Ground-Based Space Infrastructure Facilities Operation Center, part of Roskosmos State Corporation).
 Technological refueling operations continued for seven days at the refueling station at pad 31. At present, the Fregat is being transported to the assembly and test building at pad 112 to undergo final operations prior to assembly of the space head module (OneWeb spacecraft, upper stage, payload fairing).

The launch of a Soyuz-2.1b rocket with 34 OneWeb spacecraft is scheduled for August 20, 2021, from the Vostok launch site at Baikonur Cosmodrome.

The Fregat upper stage, manufactured by the Lavochkin Research and Production Association (part of Roscosmos), provides efficient execution of all tasks for placing one or more satellites into operational orbits or off-Earth trajectories. The entire extraction process is autonomous, the control algorithm is capable of overcoming abnormal situations. The highest reliability and near-perfect accuracy of launch provide the upper stage with undeniable competitive advantages on the global launch services market.

Translated with www.DeepL.com/Translator (free version)
One day you're a hero  next day you're a clown  there's nothing that is in between
        Jeff Lynne - "21century man"

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27056
  • Liked: 5301
  • Likes Given: 169
At the Baikonur cosmodrome, the assembly of the space warhead consisting of 34 #OneWeb vehicles, the Fregat upper stage and the nose fairing has been completed. The next stage of preparation for launch on August 20 is transportation to a technical complex for general assembly with a launch vehicle

https://twitter.com/roscosmos/status/1425052733632094233

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27056
  • Liked: 5301
  • Likes Given: 169
Launch vehicle Soyuz-2.1b was assembled at Baikonur

08/10/2021 14:09

At the Baikonur cosmodrome, the assembly of the space warhead consisting of OneWeb vehicles, the Fregat upper stage and the nose fairing has been completed. The docking operations took place in the assembly and test building of site No. 112 of the Baikonur cosmodrome and lasted five days.

Specialists from the Yuzhny Space Center (a branch of the Center for Operation of Ground-Based Space Infrastructure Facilities), the S.А. Lavochkin and the Progress Rocket and Space Center (part of the State Corporation Roscosmos).

In the process of assembly, the front fairing flaps were installed on a bundle of 34 spacecraft with the Fregat upper stage, after which the telemetry sensors and pyrotechnics of the fairing were checked. The next stage of preparation for launch is the transportation of the warhead to the technical complex of site No. 31 for general assembly with the Soyuz-2.1b launch vehicle.

The launch of 34 OneWeb spacecraft is scheduled for August 20, 2021 from the Vostok launch complex of site 31 of the Baikonur cosmodrome.

https://www.roscosmos.ru/32142/

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27056
  • Liked: 5301
  • Likes Given: 169
Vostochny specialists started work with the Fregat upper stage

08/11/2021 13:30

At the Vostochny cosmodrome, specialists from the joint crew of the Vostochny Space Center (a branch of the Center for Operation of Ground-Based Space Infrastructure Facilities) and the S.А. Lavochkin (part of the State Corporation "Roscosmos") at the Technical Complex began work with the upper stage "Fregat".

In accordance with the comprehensive schedule of technological work within the 49th mission of the OneWeb launch campaign, the cosmodrome employees removed the Fregat upper stage from storage. After unloading, it was installed at the workplace.

Along with this, the engineers of the Vostochny Space Center started preparing ground-based technological equipment for electrical, hydraulic and pneumatic vacuum tests.

https://www.roscosmos.ru/32157/

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27056
  • Liked: 5301
  • Likes Given: 169
At the # Vostochny cosmodrome, work has begun with the Fregat upper stage. As part of the 49th mission of the #OneWeb launch campaign , specialists removed it from storage and installed it in the workplace. Electrical, hydraulic and pneumatic vacuum tests will begin soon.

https://twitter.com/roscosmos/status/1425406304127004680

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27056
  • Liked: 5301
  • Likes Given: 169
#Vostochny specialists start working with Fregat upper stage

The cosmodrome employees removed the Fregat upper stage from storage. The engineers have also started preparing ground-based technological equipment for electrical, hydraulic and pneumatic vacuum tests.

https://twitter.com/roscosmos/status/1425468736350343175

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27056
  • Liked: 5301
  • Likes Given: 169
Time to get excited for our next #OneWebLaunch! We are scheduled for lift off on 23:23 PM (BST)/ 18:23 PM (ET), so keep an eye out for updates as we approach launch, and remember to tune into our live-stream!

https://twitter.com/OneWeb/status/1425860640242081798

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27056
  • Liked: 5301
  • Likes Given: 169
So excited to be teaming up with @Arianespace again as we move towards our next launch! Make sure you keep an eye out for updates as we approach launch, and remember to tune into our livestream of the event.

https://twitter.com/OneWeb/status/1425862064841662472

Online Salo

  • Senior Member
  • *****
  • Posts: 16194
  • Odessa, Ukraine
  • Liked: 6793
  • Likes Given: 5280
https://www.arianespace.com/press-release/flight-st34-oneweb/
Quote
August 12, 2021
Flight ST34: Arianespace supports OneWeb’s ambitions by increasing its fleet of satellites to nearly 300 spacecraft

- The next Arianespace mission is planned from Baikonur Cosmodrome with Soyuz on August 20 (local time), to deliver 34 satellites into orbit bringing the total OneWeb’s fleet to 288 satellites in Low Earth Orbit.

– This 59th Soyuz mission conducted by Arianespace and its Starsem affiliate will be the first launch from the Baikonur Cosmodrome in 2021 and represents the ninth launch for OneWeb overall.

Flight ST34, the first commercial mission performed by Arianespace and its Starsem affiliate from the Baikonur Cosmodrome in 2021, after four successful launches from Vostochny earlier this year, will put 34 of OneWeb’s satellites into a near-polar orbit at an altitude of 450 kilometers. The mission will have a total duration of three hours and 45 minutes and will include a first separation of two satellites followed by eight separations of four satellites, which will raise themselves to their operational orbit. This ninth launch to the benefit of OneWeb will raise to 288 the number of satellites deployed for the global telecommunications operator.

This launch represents a straight continuation of the ambition carried and achieved by the previous one. On July 1st, ST33 placed into orbit enough satellites to enable connectivity services to the 50th parallel and above by years end which includes Canada, U.K., Northern Europe, Alaska and Arctic regions. OneWeb’s launch campaign will continue thereafter as it works toward delivering global service in 2022.

OneWeb’s constellation will deliver high-speed, low-latency connectivity services to a wide range of customer sectors including aviation, maritime, backhaul services, as well as governments, emergency response services and more. Central to its purpose, OneWeb seeks to bring connectivity to every place where fiber cannot reach, and thereby bridge the digital divide.

Once deployed, the OneWeb constellation will enable user terminals that are capable of offering 3G, LTE, 5G and Wi-Fi coverage, providing high-speed access globally – by air, sea and land.

OneWeb Satellites, a joint venture between OneWeb and Airbus Defence and Space, is the constellation’s prime contractor. The satellites were built thanks to its leading-edge satellite manufacturing process that can build up to two satellites a day on a series production line dedicated to the assembly, integration, and testing of the satellites.

Offline jacqmans

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 22381
  • Houten, The Netherlands
  • Liked: 9363
  • Likes Given: 343
08/13/2021

The assembly of the Soyuz-2.1b launch vehicle with the OneWeb spacecraft is completed at Baikonur

In the assembly and test building of the Baikonur cosmodrome, on August 13, 2021, specialists from the subsidiaries of the Roscosmos State Corporation - the Yuzhny Space Center (a branch of the Center for Operation of Ground-Based Space Infrastructure Facilities) and a branch of the Progress Rocket and Space Center - completed the general assembly of the Soyuz space rocket -2.1b / Frigate / OneWeb as part of mission 35.

In accordance with the work schedule, on August 12, the space warhead (the Fregat upper stage and OneWeb vehicles under the fairing flaps) docked with the third stage of the Soyuz-2.1b rocket. The next day, this assembly was docked to the "package" of the first two stages of the carrier. Upon completion of this operation, the electrical connections were assembled and the pipelines for temperature control were installed.

At present, the space rocket is installed on the transport and installation unit before being transported to the launch complex of the site No. 31. There are no comments on the preparation of the component parts. A meeting of the State Commission is planned for tomorrow, August 14, on the readiness to transport the rocket to the launch site.

The launch of the Soyuz-2.1b carrier rocket with the Fregat upper stage and a batch of 34 new OneWeb spacecraft is scheduled for August 20, 2021 at 01:23 Moscow time. The launch will take place as part of the contracts between Glavkosmos (a subsidiary of Roscosmos) and the European launch services provider Arianespace (operator of OneWeb spacecraft launches using the Soyuz-2 launch vehicle) and Starsem.

OneWeb satellites are designed to create a space communications system that provides high-speed Internet access anywhere in the world. The orbital constellation will consist of 18 planes with 36 vehicles each.

https://www.roscosmos.ru/32187/
Jacques :-)

Offline ZachS09

  • Space Savant
  • Senior Member
  • *****
  • Posts: 8805
  • Argyle, TX
  • Liked: 2650
  • Likes Given: 2275
Why launch only 34 OneWeb sats if there's room for two more?
SECO confirmed. Nominal orbit insertion.

Offline anik

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 7793
  • Liked: 994
  • Likes Given: 381
Why launch only 34 OneWeb sats if there's room for two more?

Only up to 34 is possible from Baikonur.

Online Alter Sachse

  • Senior Member
  • *****
  • Posts: 2818
  • Near Heidelberg
  • Liked: 1839
  • Likes Given: 2352
One day you're a hero  next day you're a clown  there's nothing that is in between
        Jeff Lynne - "21century man"

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27056
  • Liked: 5301
  • Likes Given: 169
The general assembly is completed, we are preparing for removal.

The general assembly of the Soyuz-2.1b space rocket has been completed at the Baikonur cosmodrome to launch new satellites of the #OneWeb company . A meeting of the State Commission is planned for tomorrow on the readiness to transport the rocket to the launch site.

https://twitter.com/roscosmos/status/1426138423614656513

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27056
  • Liked: 5301
  • Likes Given: 169
General assembly completed.

At the Baikonur Cosmodrome, the Soyuz-2.1b space rocket general assembly has been completed for the upcoming #OneWeb company satellites launch.

A meeting of the State Commission is planned tomorrow to clear the rocket for rollout to the launch pad.

https://twitter.com/roscosmos/status/1426138433186107397

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27056
  • Liked: 5301
  • Likes Given: 169
Launch of the Soyuz-2.1b ILV from the OneWeb spacecraft will take place on August 16

08/14/2021 15:32

At the Baikonur cosmodrome, a meeting of the State Commission for Flight Testing of Spacecraft Launching Facilities was held on readiness to transport the Soyuz-2.1b carrier rocket to the launch complex under the OneWeb program (mission No. 35). On the eve of the assembly and testing building, the general assembly of the Soyuz-2.1b / Fregat / OneWeb space rocket took place.

Based on the results of the reports, the members of the State Commission decided to remove the space rocket and install it at the launch site of the Vostok site No. 31 on August 16, 2021. The start of work on transportation is scheduled at 05:30 Moscow time, after which the specialists of the State Corporation Roscosmos will begin work according to the schedule of the first launch day. At present, active preparations are underway there to receive a space rocket.

The launch of 34 new spacecraft from the satellite company OneWeb is scheduled for August 20, 2021. It will become the ninth OneWeb program and the third completed from the Baikonur cosmodrome.

https://www.roscosmos.ru/32176/

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27056
  • Liked: 5301
  • Likes Given: 169
The state commission at the Baikonur cosmodrome made a decision to remove the Soyuz-2.1b carrier rocket and install it at the launch site on August 16.

The launch of 34 new spacecraft of the satellite company #OneWeb is scheduled for August 20 at 01:23 Moscow time.

https://twitter.com/roscosmos/status/1426522334513479684

Tags:
 

Advertisement NovaTech
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0