HLO because Orion can't reach LLO. That was my undestanding.
"I think it would be great to be born on Earth and to die on Mars. Just hopefully not at the point of impact." -Elon Musk
"We're a little bit like the dog who caught the bus" - Musk after CRS-8 S1 successfully landed on ASDS OCISLY

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 39218
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 32738
  • Likes Given: 8196
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline CJ

  • Full Member
  • ****
  • Posts: 1302
  • Liked: 1282
  • Likes Given: 540
Re: DSG joint agreement signed between Roscosmos and NASA
« Reply #42 on: 02/20/2018 09:01 am »
HLO because Orion can't reach LLO. That was my undestanding.
Near rectilinear orbits (NRO).

https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/20150019648.pdf

Thank you both!
Steven, that PDF is superb! It even gives delta/v (post TLI) round trip to the various orbits. That's a data point I've been trying to figure out how to figure out (to see what over vehicles might be viable) and here it is. 

Lar, you're right, LLO is well beyond the capabilities of Orion; it is designed to have a total delta/v potential of 1250 m/s, while RT to LLO takes 1800 m/s.

Offline russianhalo117

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 8755
  • Liked: 4673
  • Likes Given: 768
Re: DSG joint agreement signed between Roscosmos and NASA
« Reply #43 on: 02/20/2018 01:24 pm »
HLO because Orion can't reach LLO. That was my undestanding.
Near rectilinear orbits (NRO).

https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/20150019648.pdf

Thank you both!
Steven, that PDF is superb! It even gives delta/v (post TLI) round trip to the various orbits. That's a data point I've been trying to figure out how to figure out (to see what over vehicles might be viable) and here it is. 

Lar, you're right, LLO is well beyond the capabilities of Orion; it is designed to have a total delta/v potential of 1250 m/s, while RT to LLO takes 1800 m/s.
NRHO and standard HLO to be exact.


Offline TrevorMonty

In space servicing and assembly of large structures.



http://fiso.spiritastro.net/telecon/Siegler-Peterson-Thronson_2-21-18/

While not about DSG, there is lot of references about using DSG for assembling these structures.

Its location in cislunar is prime factor, low DV between DSG location and target locations eg L2 L5. Also this clean space especially compared to debris in LEO.

Offline Archibald

  • Senior Member
  • *****
  • Posts: 2611
  • Liked: 500
  • Likes Given: 1096
Re: DSG joint agreement signed between Roscosmos and NASA
« Reply #46 on: 02/22/2018 12:49 pm »
FISO is such an amazing group of people. Always waiting for their last document.
Han shot first and Gwynne Shotwell !

Offline Caleb Cattuzzo

  • Member
  • Posts: 67
  • California,USA
  • Liked: 10
  • Likes Given: 8
Re: DSG joint agreement signed between Roscosmos and NASA
« Reply #47 on: 02/22/2018 05:26 pm »
Question what's te purpose of a new Canadarm on the DSG?Is it's main purpose to assemble the DST's when that program is approved?
There is no strife,no prejudice,no national conflict in space as yet.Its hazards are hostile to us all.

Offline russianhalo117

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 8755
  • Liked: 4673
  • Likes Given: 768
Re: DSG joint agreement signed between Roscosmos and NASA
« Reply #48 on: 02/22/2018 06:26 pm »
Question what's te purpose of a new Canadarm on the DSG?Is it's main purpose to assemble the DST's when that program is approved?
To mount external payloads and R&R ORU's which for both DSG and DST must be designed to be done entirely robotically in the event a crew is not present and even while one is there.

Offline pospa

  • Full Member
  • **
  • Posts: 213
  • Pardubice, CZ
  • Liked: 291
  • Likes Given: 800
Re: DSG joint agreement signed between Roscosmos and NASA
« Reply #49 on: 02/27/2018 11:15 am »
Today starts 3-day DSG Science workshop 2018 in Denver.

Event home page: https://www.hou.usra.edu/meetings/deepspace2018/
Program incl. white papers: https://www.hou.usra.edu/meetings/deepspace2018/pdf/program.pdf

Offline dct

  • Member
  • Posts: 7
  • Switzerland
  • Liked: 1
  • Likes Given: 26
Re: DSG joint agreement signed between Roscosmos and NASA
« Reply #50 on: 03/09/2018 08:29 am »
Is there any online available outcome of this conference?



Gesendet von iPhone mit Tapatalk

Offline Yxalag

  • Member
  • Posts: 21
  • Liked: 28
  • Likes Given: 22
Re: DSG joint agreement signed between Roscosmos and NASA
« Reply #51 on: 06/04/2018 03:05 pm »
The full video from the Gateway status presentation week before last at MSFC




Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0