Author Topic: SpaceX F9 : Starlink group 6-30 : CCSFS SLC-40 : 27/28 November 2023 (04:20 UTC)  (Read 13972 times)

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
T-30 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
T-25 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
T-20 minute vent. Second stage RP-1 loading should be completed about now.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
T-16 minutes. Second stage LOX loading should be starting about now.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
T-10 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
T-7 minutes. Engine chill should be starting about now.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
T-6 minutes. First stage RP-1 loading should be complete about now.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline zubenelgenubi

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 11002
  • Arc to Arcturus, then Spike to Spica
  • Sometimes it feels like Trantor in the time of Hari Seldon
  • Liked: 7293
  • Likes Given: 70076
PDF of online press kit and launch times. Currently targeting the second opportunity.

04:01:30 UTC.
04:20:00 UTC.
04:42:00 UTC.
05:06:40 UTC.
05:30:40 UTC.
06:07:10 UTC.
07:05:40 UTC.
07:58:10 UTC.
Why not the first launch opportunity?
Support your local planetarium! (COVID-panic and forward: Now more than ever.) My current avatar is saying "i wants to go uppies!" Yes, there are God-given rights. Do you wish to gainsay the Declaration of Independence?

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
T-5 minutes. Tanks pressing for strongback retract.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
T-4 minutes. Strongback is retracting.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
T-3 minutes. First stage LOX load is complete.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
T-2 minutes. Second stage LOX load is complete.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
T-1 minute. Falcon 9 is in startup.

LD is go for launch.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
Liftoff!
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
T+1 minute.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
T+2 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
First stage separation.

Ignition.

T+3 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
Fairing separation.

T+4 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
T+5 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38579
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31750
  • Likes Given: 7734
T+6 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
1