Premature shutdown.
We regret not being able to deliver the first two TROPICS satellites. Nothing is more important to our team than the trust of our customers and the successful delivery of the remaining TROPICS satellites. We will share more when we have fully reviewed data.
Tracking map, yellow vertical line is 1st stage MECO point with the green vertical line being the planned SECO and orbital insertion point:
Quote from: DaveS on 06/12/2022 05:55 pmTracking map, yellow vertical line is 1st stage MECO point with the green vertical line being the planned SECO and orbital insertion point:MECO was back much closer to Florida. I think the yellow line was the planned Stage 2 cutoff and the green line was planned payload deploy.