go all out to secure the launchBased on the experience of the 4 completed maritime launches, actively connect with the model team and launch brigade, coordinate with the military, meteorological, maritime, public security and other departments, solidify the maritime launch service guarantee process, and lay a solid foundation for normalized maritime launch capabilities. We will make every effort to ensure and serve launch missions such as the first flight of Jielong 3 at the end of November and the first sea launch of Ceres at the end of December. Accelerate the construction of rocket launchers. All 67 sub-sections will start construction before the Spring Festival, 70% of the progress of closing, and 80% of equipment procurement. The construction contract for the semi-fixed launch platform was signed before the Spring Festival.
全力以赴保发射Quotego all out to secure the launchBased on the experience of the 4 completed maritime launches, actively connect with the model team and launch brigade, coordinate with the military, meteorological, maritime, public security and other departments, solidify the maritime launch service guarantee process, and lay a solid foundation for normalized maritime launch capabilities. We will make every effort to ensure and serve launch missions such as the first flight of Jielong 3 at the end of November and the first sea launch of Ceres at the end of December. Accelerate the construction of rocket launchers. All 67 sub-sections will start construction before the Spring Festival, 70% of the progress of closing, and 80% of equipment procurement. The construction contract for the semi-fixed launch platform was signed before the Spring Festival.The 1st Gushenxing-1H will be launched in end of December 2022 from Yellow Sea!
Quote from: mikezang on 11/12/2022 01:19 pm全力以赴保发射Quotego all out to secure the launchBased on the experience of the 4 completed maritime launches, actively connect with the model team and launch brigade, coordinate with the military, meteorological, maritime, public security and other departments, solidify the maritime launch service guarantee process, and lay a solid foundation for normalized maritime launch capabilities. We will make every effort to ensure and serve launch missions such as the first flight of Jielong 3 at the end of November and the first sea launch of Ceres at the end of December. Accelerate the construction of rocket launchers. All 67 sub-sections will start construction before the Spring Festival, 70% of the progress of closing, and 80% of equipment procurement. The construction contract for the semi-fixed launch platform was signed before the Spring Festival.The 1st Gushenxing-1H will be launched in end of December 2022 from Yellow Sea!Is the "1H" denomination official?
Eight satellites including "Tianfu Constellation", "Daoda Constellation" and "Jilin No. 1" in Meishan set off for expeditionOn November 13, 2022, Changguang Satellite Technology Co., Ltd. held the Meishan "Tianfu Constellation" Dongpo 08~10 stars, "Daoda Constellation" Tianluo and Tianxin, and "Jilin-1" in Changchun Aerospace Information Industrial Park. The expedition ceremony of 8 satellites including the Gaofen 03D47 star, the Jilin-1 Gaofen 03D50 star, and the Jilin-1 platform 01A01 star. Leaders and employee representatives of the company and cooperative units participated in the activity.Meishan "Tianfu Constellation" Dongpo 08~10 stars ("Jilin No. 1" high score 03D44~46 stars), "Daoda Constellation" Tianluo and Tianxin ("Jilin No. 1" high score 03D48~49 stars) It is a light and small high-resolution optical remote sensing satellite jointly developed by Changguang Satellite Technology Co., Ltd., Meishan Huantian Smart Technology Co., Ltd., and Beijing Daoda Sky Technology Co., Ltd. respectively. The "Jilin-1" Gaofen-03 series of satellites is an important achievement of the company's practice of the mass production concept. It has the characteristics of low cost, low power consumption, low weight and high indicators.The "Jilin No. 1" platform 01A01 is a flexible satellite platform independently developed by Changguang Satellite Technology Co., Ltd. according to the design concept of CubeSat. The satellite can perform flexible stand-alone transformation according to the integration requirements of different loads. Strong capability, light weight and low cost. The "Jilin-1" platform 01A satellite is positioned on a 20kg-class multi-functional operational satellite platform, which supports long-term three-axis ground-to-ground operation of the payload, and can be adapted to various payloads such as remote sensing, communication, and navigation. The reliability advantages, as well as the low cost and rapid development advantages of CubeSats.The eight satellites on this expedition will be launched in the near future in the Yellow Sea. After the successful launch, they will form a network with the 70 "Jilin-1" satellites in orbit, which can be used for agriculture, forestry, ocean, resources, environmental protection, meteorology, Provide a wealth of remote sensing data and product services in the fields of urban construction and scientific experiments.
Quote from: Fmedici on 11/12/2022 02:43 pmQuote from: mikezang on 11/12/2022 01:19 pm全力以赴保发射Quotego all out to secure the launchBased on the experience of the 4 completed maritime launches, actively connect with the model team and launch brigade, coordinate with the military, meteorological, maritime, public security and other departments, solidify the maritime launch service guarantee process, and lay a solid foundation for normalized maritime launch capabilities. We will make every effort to ensure and serve launch missions such as the first flight of Jielong 3 at the end of November and the first sea launch of Ceres at the end of December. Accelerate the construction of rocket launchers. All 67 sub-sections will start construction before the Spring Festival, 70% of the progress of closing, and 80% of equipment procurement. The construction contract for the semi-fixed launch platform was signed before the Spring Festival.The 1st Gushenxing-1H will be launched in end of December 2022 from Yellow Sea!Is the "1H" denomination official?Waiting for offcial news to update it:)
YELLOW SEA, HAIYANG PORT,FROM 111000UTC TO 122300 UTC DEC. SCIENTIFIC EXPERIMENT CARRIED IN AREA BOUNDED BY 36-36.3N 121-09.9E,36-40.1N 121-14.6E,36-35.7N 121-20.0E,36-37.7N 121-22.4E,36-29.4N 121-32.7E,36-21.8N 121-23.2E,36-30.0N 121-13.0E,36-32.0N 121-15.3E,ENTERING PROHIBITED. SHANDONG MSA CHINA.
A1343/22 NOTAMNQ) NFFF/QRDCA/IV/BO/W/000/999/2347S16430E090A) NFFF B) 2212110400 C) 2212181000D) DLY FM 0400 - 1000 UTCE) TEMPO DANGER AREA ACTIVATED DUE AEROSPACE FLIGHT ACTIVITY IN AREA BOUNDED BY APRX COORD:- S12 36 00 E172 31 00 TO- S11 06 00 E170 13 00 TO- S10 30 00 E170 37 00 TO- S11 59 00 E172 55 00 THENCE TO- S12 36 00 E172 31 00ATS ROUTE AFFECTED:-B474 ROUTE SEGMENT BETWEEN WPT ATRAS TO 'SON' VOR-G223 ROUTE SEGMENT FM POINT APPROX 135NM NW BOUND TO ATRAS. AIRMEN SHALL AVOID THE AREA AND EXER EXTREME CTN WHEN OPERATING INCLOSE PROXIMITY OF THE AREAF) SFC G) UNL
So, we are inside the launch window. Waiting for some news about this launch.
QuoteA6962/22 NOTAMN Q) RCAA/QXXXX/IV/BO/E/000/999/2214N11759E052A) RCAA B) 2212160500 C) 2212181000D) 0500-1000E) AIRSPACE BLOCKED DUE TO AEROSPACE FLIGHT ACTIVITY:1.AFFECTED RTE:R200 /T1 TRANSITION/ J1 TRANSITION SUSPENDED,A1 BTN KADLO AND ELATO,M750 BTN ENVAR AND RENOT,G581 BTN PARPA AND ELATO,2.AREA AS FLW:GEO:213400N 1183300E221400N 1170400E225400N 1172400E221300N 1185400E213400N 1183300EF) SFC G) UNLA6963/22 NOTAMN Q) RCAA/QARLT/IV/NBO/E/000/999/2502N12039E298A) RCAA B) 2212160410 C) 2212181000D) 0410-1000E) ALTN RTE FOR A1/M750/G581 ARE ESTABLISHED FOR TRANSIT FLIGHTSDUE TO AEROSPACE FLIGHT ACTIVITY.1.A1: APU B1 ANLOT W4 TNN A577 ANDRE G86 KAPLI AND VICE VERSA.2.M750: KAPLI G86 ANDRE A577 TNN W4 ANLOT M750 KAPLI G86 ANDRE A577 TNN W4 ANLOT B1 APU A1 DRAKE Q11 LIPLO KAPLI G86 HCN J7 Q13 IGURU3.G581: KAPLI G86 HCN J7 Q13 IGURU (EAST BOUND) G581: IGURU Q13 J7 HCN G86 KAPLI (WEST BOUND)RMK: REF NOTAM A6962/22.A6964/22 NOTAMN Q) RCAA/QARLT/IV/NBO/E/000/999/2502N12039E298A) RCAA B) 2212160410 C) 2212181000D) 0410-1000E) DUE TO AEROSPACE FLIGHT ACTIVITY, ALTN RTE FOR A1/M750/G581/R200ARE ESTABLISHED FOR DEP/ARR FLIGHTS WITHIN TAIPEI FIR.1.DEP FLIGHTS: (1) RCTP DEP: DEP RTE CHALI T5 PARPA A577 ANDRE G86 KAPLI (A1/T1/G86) DEP RTE CHALI T3 MKG A1 KADLO DCT OLDID (R200) (2) RCSS/RCMQ DEP: DEP RTE TNN A577 ANDRE G86 KAPLI (A1/T1/G86) DEP RTE MKG A1 KADLO DCT OLDID (R200) (3) RCKH DEP: DEP RTE PARPA A577 ANDRE G86 KAPLI (G581) DEP RTE TNN W6 MKG A1 KADLO DCT OLDID (R200)2.ARR FLIGHTS: (1) RCTP/RCSS/RCMQ ARR: KAPLI G86 ANDRE A577 TNN (A1/M750/G86) RNAV RTE OLDID DCT RENOT M750 TONGA (R200) NON-RNAV RTE OLDID DCT KADLO A1 (R200) (2) RCKH ARR: KAPLI G86 ANDRE A577 PARPA (G581) OLDID DCT RENOT M750 TOROX W6 TNN (R200)FOR DETAILS, CONTACT TAIPEI ACC AT +886 3 3841040.RMK: REF NOTAM A6962/22.The launch might be on Dec 16.
A6962/22 NOTAMN Q) RCAA/QXXXX/IV/BO/E/000/999/2214N11759E052A) RCAA B) 2212160500 C) 2212181000D) 0500-1000E) AIRSPACE BLOCKED DUE TO AEROSPACE FLIGHT ACTIVITY:1.AFFECTED RTE:R200 /T1 TRANSITION/ J1 TRANSITION SUSPENDED,A1 BTN KADLO AND ELATO,M750 BTN ENVAR AND RENOT,G581 BTN PARPA AND ELATO,2.AREA AS FLW:GEO:213400N 1183300E221400N 1170400E225400N 1172400E221300N 1185400E213400N 1183300EF) SFC G) UNLA6963/22 NOTAMN Q) RCAA/QARLT/IV/NBO/E/000/999/2502N12039E298A) RCAA B) 2212160410 C) 2212181000D) 0410-1000E) ALTN RTE FOR A1/M750/G581 ARE ESTABLISHED FOR TRANSIT FLIGHTSDUE TO AEROSPACE FLIGHT ACTIVITY.1.A1: APU B1 ANLOT W4 TNN A577 ANDRE G86 KAPLI AND VICE VERSA.2.M750: KAPLI G86 ANDRE A577 TNN W4 ANLOT M750 KAPLI G86 ANDRE A577 TNN W4 ANLOT B1 APU A1 DRAKE Q11 LIPLO KAPLI G86 HCN J7 Q13 IGURU3.G581: KAPLI G86 HCN J7 Q13 IGURU (EAST BOUND) G581: IGURU Q13 J7 HCN G86 KAPLI (WEST BOUND)RMK: REF NOTAM A6962/22.A6964/22 NOTAMN Q) RCAA/QARLT/IV/NBO/E/000/999/2502N12039E298A) RCAA B) 2212160410 C) 2212181000D) 0410-1000E) DUE TO AEROSPACE FLIGHT ACTIVITY, ALTN RTE FOR A1/M750/G581/R200ARE ESTABLISHED FOR DEP/ARR FLIGHTS WITHIN TAIPEI FIR.1.DEP FLIGHTS: (1) RCTP DEP: DEP RTE CHALI T5 PARPA A577 ANDRE G86 KAPLI (A1/T1/G86) DEP RTE CHALI T3 MKG A1 KADLO DCT OLDID (R200) (2) RCSS/RCMQ DEP: DEP RTE TNN A577 ANDRE G86 KAPLI (A1/T1/G86) DEP RTE MKG A1 KADLO DCT OLDID (R200) (3) RCKH DEP: DEP RTE PARPA A577 ANDRE G86 KAPLI (G581) DEP RTE TNN W6 MKG A1 KADLO DCT OLDID (R200)2.ARR FLIGHTS: (1) RCTP/RCSS/RCMQ ARR: KAPLI G86 ANDRE A577 TNN (A1/M750/G86) RNAV RTE OLDID DCT RENOT M750 TONGA (R200) NON-RNAV RTE OLDID DCT KADLO A1 (R200) (2) RCKH ARR: KAPLI G86 ANDRE A577 PARPA (G581) OLDID DCT RENOT M750 TOROX W6 TNN (R200)FOR DETAILS, CONTACT TAIPEI ACC AT +886 3 3841040.RMK: REF NOTAM A6962/22.
I don't know where mikezang gets the launch time above but it's most likely completely wrong, especially since the official announcement that noted a Ceres-1 sea launch says it would be NET late December 2022. There are no related NOTAMs to back it up.
Quote from: Satori on 12/11/2022 01:22 pmSo, we are inside the launch window. Waiting for some news about this launch.The Gushenxing-1 with serial number Y5 was launched on January 9, 2023:https://forum.nasaspaceflight.com/index.php?topic=57939.0
Quote from: Vahe231991 on 06/27/2023 07:51 pmQuote from: Satori on 12/11/2022 01:22 pmSo, we are inside the launch window. Waiting for some news about this launch.The Gushenxing-1 with serial number Y5 was launched on January 9, 2023:https://forum.nasaspaceflight.com/index.php?topic=57939.0This thread is about the first Gushenxing-1 launch from Yellow Sea, not about the Y5 mission.
Galactic Energy, a private space company in Beijing, plans to launch one of its own rockets from the sea in the coming summer, which, if it succeeds, will become the first sea-based launch by the country's private sector.Xia Dongkun, a vice-president at Galactic Energy, said on Thursday that the prospective launch has been scheduled to take place in the Yellow Sea off the coast of Shandong province sometime between June and August.
Galaxy Power Aerospace announced the mission code name of Ceres 1 (Yao 7), and opened a collection of mission badge designs.The main body of the design is composed of koi and auspicious clouds surrounding the arrow body. "The koi is dazzling, the fortune is smooth, and the blue clouds are going straight up." The koi is a sign of auspiciousness, and it brings a glimpse of things that cannot be seen between the scales; the koi represents good luck and auspiciousness, and symbolizes this The mission rocket will be able to accurately send the payload into the predetermined orbit and win a lot of applause. "Auspicious clouds are luxuriant, misty purple clouds, and clouds are flourishing." Auspicious clouds imply auspiciousness, happiness and happiness, and the arrival of blessings, and represent the beautiful yearning and wishes for the future success of Ceres-1 carrier rocket. The good wind takes advantage of it, strives upward, and shines brightly. Galaxy Power Aerospace has traveled all the way to the light, fearless of dangers and obstacles, and is working day and night with enthusiasm, continuing to rush forward to a bright future on the road of commercial aerospace in the new era.
The website Parabolic Arc lists the payload for the planned Gushenxing-1 launch from the Yellow Sea as the Rizhao-1.