Quote from: JEF_300 on 06/22/2025 09:03 pmGuys... yes, there are 3 BE-7s in the middle of the crew cabin on Blue Moon Mk2.We've known this for two years now.I've been pretty frustrated by the tendency for people to forget things in these forums.
Guys... yes, there are 3 BE-7s in the middle of the crew cabin on Blue Moon Mk2.We've known this for two years now.
It’s difficult to keep track of things that don’t have a centralized location for well-corroborated information. Note that you didn’t actually link to anything, just said that everyone knows…
L2 I don’t think is indexed by Google. Anyway, is there a link to the corroboration that there’s 3 engines, just for posterity’s sake?
Quote from: Robotbeat on 06/23/2025 07:34 pmL2 I don’t think is indexed by Google. Anyway, is there a link to the corroboration that there’s 3 engines, just for posterity’s sake?I know I saw something that was sourced to Blue Origin the other day, but I cleverly didn't save it. The Wikipedia Blue Moon entry has a link to a presumably paywalled Irene Klotz Aviation Week article (7/17/23) as its source. She's usually reliable.
I've seen bottom shields in multiple Blue Origin artwork,...
Quote from: TheRadicalModerate on 06/24/2025 08:26 pmI've seen bottom shields in multiple Blue Origin artwork,...Can you provide screenshots and highlights of some examples?
Over the Moon about this special delivery to Rocket Park. Any guesses what it could be? 🚚📦
Blue Moon Mark 1 on the move?https://x.com/blueorigin/status/1938294203659714681QuoteOver the Moon about this special delivery to Rocket Park. Any guesses what it could be? 🚚📦
Blue Origin held a preliminary design review in February 2024 and plans to complete its critical design review in August 2025.HLS officials said Blue Origin had to conduct additional work after its preliminary design review because its lunar lander design did not meet NASA’s propellant and mass requirements. These officials said that Blue Origin completed additional design analysis and showed progress in meeting the mass requirement.
GAO-25-107591, NASA: Assessments of Major Projects (Page 48)QuoteBlue Origin held a preliminary design review in February 2024 and plans to complete its critical design review in August 2025.HLS officials said Blue Origin had to conduct additional work after its preliminary design review because its lunar lander design did not meet NASA’s propellant and mass requirements. These officials said that Blue Origin completed additional design analysis and showed progress in meeting the mass requirement.
Quote from: StraumliBlight on 07/01/2025 09:27 pmGAO-25-107591, NASA: Assessments of Major Projects (Page 48)QuoteBlue Origin held a preliminary design review in February 2024 and plans to complete its critical design review in August 2025.HLS officials said Blue Origin had to conduct additional work after its preliminary design review because its lunar lander design did not meet NASA’s propellant and mass requirements. These officials said that Blue Origin completed additional design analysis and showed progress in meeting the mass requirement.It is interesting that SX is only at PDR in August and BO is at CDR... given this is talking about the HLS.SpaceX and Blue Origin are working toward their next design reviews. SpaceX held an SLD certification baseline review in May 2023 and is working toward its preliminary design review in August 2025. SpaceX and NASA also plan to hold the HLS Initial Capability critical design review in 2025. Blue Origin held a preliminary design review in February 2024 and plans to complete its critical design review in August 2025.